83840d45dc
Payap model v4: colour store, silos, two-storey finishing and print block
grabowski
2026-10-10 17:21:44 +07:00
-
d9f3a4b88e
Compound storage for tens of colours; stamper prep open to galvanics
grabowski
2026-10-10 17:21:33 +07:00
-
0700c14b5c
Payap model: two-storey office building with canteen, changing and showers
grabowski
2026-10-10 17:01:40 +07:00
-
4263fbbd9b
Payap model v2: bigger factory, shared plant room, separate water treatment
grabowski
2026-10-10 16:47:44 +07:00
-
9e0c5d4045
Fleet: one shared hydraulic and air supply; room for ten more Classics
grabowski
2026-10-10 16:47:34 +07:00
-
f2bb7f3d85
Payap scenario: parametric BIM model of the whole plant on a square plot
grabowski
2026-10-10 16:31:46 +07:00
-
3a758fcffb
Fleet: each Duplex has an EX 50 main and an EX 35 colour extruder
grabowski
2026-10-10 16:11:46 +07:00
-
c50417668b
Press fleet: two Newbilt Duplex systems with an extruder per press, plus a Classic
grabowski
2026-10-10 16:05:27 +07:00
-
f1334f4756
OMS introduction letter and links, Sibert's answer (9 October 2026)
grabowski
2026-10-10 15:52:23 +07:00
-
90d8a3778a
Record the replies to Sibert and OMS
grabowski
2026-10-09 12:14:59 +07:00
-
21419145f8
Replies sent to Sibert (Ian Locke) and OMS (Lou Wullms)
grabowski
2026-10-09 12:08:07 +07:00
-
4fec258f15
After Haarlem: Pheenix CEO follow-up, OMS first contact, SST
grabowski
2026-10-09 06:38:52 +02:00
-
47e5f9e458
Biomass: reported northern fuel prices (October 2026)
grabowski
2026-10-07 10:08:54 +02:00
-
9640a4f075
Energy: PEA tariff, electric vs biomass steam, PV vs solar thermal
grabowski
2026-10-07 09:54:31 +02:00
-
79e8cddcff
Production hall: rough BIM layout sketch
grabowski
2026-10-07 09:40:13 +02:00
-
856e0a2ccf
Add the Poy Records logo
grabowski
2026-10-07 09:24:35 +02:00
-
6888abe602
Sibert follow-up: USD 250k budget, current VS specs, OMS as galvanics option
grabowski
2026-10-07 09:24:11 +02:00
-
b672c58e34
Plant page: mature fleet at real cycle times
grabowski
2026-10-03 22:47:57 +02:00
-
9b26cfbf7c
PVC lab: instrument list with estimates, and cost it
grabowski
2026-10-03 21:51:00 +02:00
-
c56d403da0
Record the Making Vinyl feedback on traceability
grabowski
2026-10-03 21:39:45 +02:00
-
ffbc46782a
Add the Payap University partnership: joint student programmes
grabowski
2026-10-03 21:36:17 +02:00
-
31d89faf03
Add Payap University land as a site candidate
grabowski
2026-10-03 21:31:25 +02:00
-
81f3279efd
Add Pheenix galvanics flyers and Sibert stamper prep specs
grabowski
2026-10-03 21:05:00 +02:00
-
293979bef8
Supplier list: drop the last em dash
grabowski
2026-10-02 21:54:25 +02:00
-
88220bcd1f
Supplier list: drop the two remaining em dashes
grabowski
2026-10-02 21:54:14 +02:00
-
725f0cc9d1
Add the Newbilt flyers from Making Vinyl Europe 2026
grabowski
2026-10-02 21:53:45 +02:00
-
e23be20b13
Plant operation page: work on phones and tablets held sideways
grabowski
2026-10-02 21:33:04 +02:00
-
52bf35f183
Deploy workflow: check the SSH key and log its fingerprint
grabowski
2026-10-02 21:14:33 +02:00
-
560d073019
Add the cnxvinyl.lol test site with a Gitea deploy workflow
grabowski
2026-10-02 20:59:38 +02:00
-
0e033784a2
Note the internal testing domain cnxvinyl.lol
grabowski
2026-10-02 20:44:10 +02:00
-
4607a4da58
Plan the artist platform: price calculator and fan-funded pressing
grabowski
2026-10-02 17:37:32 +02:00
-
917a3eb933
Plan the overhead crane, maintenance workshop and visitor corridor
grabowski
2026-10-02 17:34:24 +02:00
-
81185d8013
Add the Sillitoe SDMS as a second mastering lathe candidate
grabowski
2026-10-02 17:31:36 +02:00
-
ffcce42a51
Digital factory plan: build on the existing cnx-network clan
grabowski
2026-09-21 21:41:49 +02:00
-
0fb60bcbb5
Add digital factory systems plan (NixOS fleet as one Clan)
grabowski
2026-09-21 21:06:42 +02:00
-
122d908862
Labels are pressed into the record, not applied at finishing
grabowski
2026-09-21 16:16:18 +02:00
-
c8482b7a76
Add animated plant operation page (simulated SCADA overview)
grabowski
2026-09-21 16:01:41 +02:00
-
ed0260d476
Add Making Vinyl Europe 2026 exhibitor briefing and booth questions
grabowski
2026-09-19 19:24:58 +02:00
-
fbe6a97e39
business plan pdf
grabowski
2026-09-10 10:28:03 +02:00
-
3934dc1dc4
Add investor business plan (draft 0.1) with its Python builder
grabowski
2026-09-10 10:20:05 +02:00
-
1bbef055c4
Remove em dashes where the replacement is unambiguous
grabowski
2026-08-06 15:31:09 +07:00
-
8c8e1be451
Rewrap an over-long line left by an earlier edit
grabowski
2026-08-06 12:54:52 +07:00
-
caa38dcd0b
Rebuild the operating roll-up and labour cost from components
grabowski
2026-08-06 12:52:14 +07:00
-
4deaa2c57c
Correct errors found by review; hedge unmarked inferences
grabowski
2026-08-06 12:35:37 +07:00
-
20c8d283d5
Rebase costs on USD/THB; add timelines and first market data
grabowski
2026-08-06 12:22:40 +07:00
-
9d5d695855
Add parametric BIM model; rework site works, envelope and phase 2
grabowski
2026-08-05 16:38:24 +07:00
-
bbeaed7e87
Add loading dock, second gate, and phase 1 construction RFQ
grabowski
2026-07-30 18:11:30 +07:00
-
ed987b4375
Fix render camera orientation so world up is up in frame
site-model-mueang-chi
grabowski
2026-07-30 01:12:28 +07:00
-
9aff3a5c24
Replace renders with a top-visible set only
grabowski
2026-07-30 00:58:09 +07:00
-
e2ad342a1a
Export site renders; pin the freecad-mcp MCP server
grabowski
2026-07-30 00:54:20 +07:00
-
c4d0e08c9f
Add site massing model for the Mueang Chi candidate parcel
grabowski
2026-07-29 23:00:09 +07:00
-
c138177f67
Add project roadmap: 27 steps in dependency order across six phases
grabowski
2026-07-17 18:02:18 +07:00
-
195dbff1f4
Add revenue model: 3.2M-5.9M EUR/yr at full capacity, per-record economics
grabowski
2026-07-17 17:56:23 +07:00
-
89da2af9c3
Add total investment roll-up: 4M-7.7M EUR full vision, 1.5M-2.5M EUR phased entry
grabowski
2026-07-17 17:46:27 +07:00
-
c95874ce6f
Add project scale summary: capacity, building, land, electrical, solar, headcount
grabowski
2026-07-17 17:37:20 +07:00
-
50a75c1fa4
Add biomass fuel strategy: 60 rai coppice idea and northern fuel market
grabowski
2026-07-17 17:16:06 +07:00
-
5184014a2d
Add energy efficiency architecture: heat recovery before generation
grabowski
2026-07-17 17:09:35 +07:00
-
6648eb00b2
Add Thai utilities investment CSV with supplier candidates and budgetary ranges
grabowski
2026-07-17 16:39:46 +07:00
-
b2ab630231
Add BOI investment promotion strategy
grabowski
2026-07-17 15:54:53 +07:00
-
11b7df3be4
Add end-to-end process flow document and diagram; floor loading criterion
grabowski
2026-07-17 15:48:48 +07:00
-
c07c554169
Add marking method per material: cold scribe on lacquers, laser on nickel, none on PVC
grabowski
2026-07-17 15:28:24 +07:00
-
c5ec01369b
Add stamper part marking and orientation fiducials; label alignment noted as deprioritized option
grabowski
2026-07-17 15:26:34 +07:00
-
d194ebdc30
Add tiered PVC lab checks: per-lot benchtop, in-house workhorses, external qualification panel
grabowski
2026-07-17 15:23:36 +07:00
-
5b6beba305
Soften packaging assembly-check claim per review
grabowski
2026-07-17 15:17:11 +07:00
-
d85e8fec8d
Add raw PVC per-lot and packaging QC gates to quality automation spec
grabowski
2026-07-17 15:16:33 +07:00
-
808e3e34b8
Add quality automation spec: stamper metrology and layered record QC
grabowski
2026-07-17 13:56:45 +07:00
-
6c1b1e7bbd
Add factory layout concept diagram and fix fire-suppression section structure
grabowski
2026-07-17 13:41:23 +07:00
-
0b79c4fb73
Add whole-factory HVAC requirement and process traceability spec
grabowski
2026-07-17 13:05:46 +07:00
-
0a4f47a5cc
Split README into topic documents
grabowski
2026-07-17 12:51:04 +07:00
-
6281c5b223
Add solar hardware plan: Deye hybrid inverters + Gobel Power 271 kWh BESS
grabowski
2026-07-17 12:41:52 +07:00
-
4c44b39e0c
Add vendor landscape to README and equipment supplier map
grabowski
2026-07-17 12:22:04 +07:00
-
d9970d335f
Update README: remove em dashes, add packaging/dropshipping, 50/50 press fleet strategy
grabowski
2026-07-17 11:58:13 +07:00
-
d1bffb217e
Rename B4L to buildfor.life
grabowski
2026-07-17 11:53:22 +07:00
-
abfa6f1ee1
Correct project attribution: add team section, B4L is consulting support
grabowski
2026-07-17 11:53:06 +07:00
-
08a1607e22
Add README: project vision, equipment plan, sustainability and safety commitments
grabowski
2026-07-17 11:51:11 +07:00
-
5622ab2821
Initial commit: planning documents
grabowski
2026-07-17 11:46:32 +07:00