# CNX Vinyl — Poy Records
|
||||
|
||||
A vinyl record factory in planning for the Chiang Mai area of northern
|
||||
Thailand (site candidates include Lamphun and Lampang provinces), driven by
|
||||
[B4L](https://b4l.co.th). This repository is the source of truth for the
|
||||
project: planning documents, cost data, and — as the factory takes shape —
|
||||
the data and software used to run it.
|
||||
|
||||
## Vision: Full-Service Production
|
||||
|
||||
The goal is the complete vinyl production chain under one roof, from audio
|
||||
file to finished record:
|
||||
|
||||
1. **Mastering** — audio mastering for vinyl
|
||||
2. **Lathe cutting** — cutting the master disc
|
||||
3. **Silvering** — metallizing the cut master
|
||||
4. **Stamper production** — electroforming nickel stampers in-house
|
||||
5. **Pressing** — extrusion and pressing of the finished records
|
||||
6. **Finishing** — trimming, labels, shrink wrapping
|
||||
|
||||
In-house galvanics (steps 3–4) removes the dependency on overseas stamper
|
||||
suppliers — a common bottleneck for pressing plants — and shortens turnaround
|
||||
for clients. The current planning documents cover the pressing line (step 5–6)
|
||||
in detail; equipment and budgets for mastering, cutting, and galvanics are
|
||||
open planning items.
|
||||
|
||||
## Project Status
|
||||
|
||||
**Planning stage** (as of mid-2026).
|
||||
|
||||
- Industry outreach has been ongoing for several years — equipment vendors,
|
||||
material suppliers, and independent consultants.
|
||||
- Alexander and Simona will soon travel to
|
||||
[Making Vinyl](https://makingvinyl.com/) in Haarlem, Netherlands, to gather
|
||||
further insights from the pressing industry.
|
||||
- A collaboration with [Resurrec](https://www.resurrec.com/) is under
|
||||
discussion.
|
||||
|
||||
## Pressing Line: Equipment Plan
|
||||
|
||||
The core pressing machinery under evaluation comes from
|
||||
**Newbilt machinery GmbH** (Alsdorf, Germany):
|
||||
|
||||
- **Newbilt Single 2.1 system** — one VEX 50 extruder feeding one HRP 12
|
||||
hydraulic press (~150 t press force), pressing 12" records at 140 or 180 g
|
||||
with a Newbilt book mold set. A Vario trimmer handles 12" cuttings, with
|
||||
a 7"/10" upgrade path.
|
||||
- **Duplex upgrade path** — the hydraulic aggregate is already sized for a
|
||||
second press; an additional press and extruder are quoted options, so the
|
||||
plant can scale from Single to Duplex without replacing infrastructure.
|
||||
- **Supporting equipment** — label dry oven, shrink wrapper, PVC grinder
|
||||
(scrap feeds back as the ~20% recycled share of the feedstock), 7" center
|
||||
label punch, buffer spindles and separator plates.
|
||||
|
||||
The June 2024 Newbilt quotation totals **≈ €200,500** including freight from
|
||||
Alsdorf to Thailand and seaworthy packaging. Two major utility systems are
|
||||
deliberately excluded and will be **sourced and installed locally in
|
||||
Thailand**: a ~400 kg/h steam generator (with water treatment) and a ~250 kW
|
||||
cooling water system. The quotation has passed its validity date and will need
|
||||
re-confirmation before ordering.
|
||||
|
||||
Site planning works from Newbilt's Duplex requirements: roughly 200 m² of
|
||||
production floor, 32 kVA connected electrical load, saturated steam at 10 bar,
|
||||
and compressed air and cooling water circuits — plus side rooms for materials,
|
||||
compressor, chiller, and finished goods.
|
||||
|
||||
## Sustainability
|
||||
|
||||
Two commitments are fixed design requirements for this plant, not aspirations
|
||||
to be traded away during engineering: run on as much renewable energy as
|
||||
possible, and discharge no contaminated water. Both are decisions we can
|
||||
actually make, because the two biggest utility systems — steam and cooling —
|
||||
are explicitly excluded from the Newbilt scope and will be sourced and
|
||||
installed locally in Thailand. That gives us a free hand to spec them green
|
||||
from day one.
|
||||
|
||||
### Renewable energy — large solar installation
|
||||
|
||||
The pressing machinery itself is a modest electrical load: 32 kVA connected,
|
||||
~21 kW average for a full Duplex line. The real energy demand sits in the
|
||||
utilities around it — above all the steam generator (400 kg/h saturated steam
|
||||
at 10 bar / 180 °C) and the 250 kW cooling system.
|
||||
|
||||
- A large rooftop/ground PV installation is planned. Northern Thailand's solar
|
||||
irradiance is favorable, and daytime-heavy production shifts align well with
|
||||
PV output.
|
||||
- The machine load and cooling system are straightforward PV targets.
|
||||
- Steam is the open engineering question: options under evaluation include an
|
||||
electric boiler (maximizes the solar share), a biomass boiler (locally
|
||||
abundant fuel), and solar-thermal pre-heating of boiler feedwater. No
|
||||
technology choice has been made yet; it will be driven by honest numbers on
|
||||
load profiles, storage, and grid backup — not by what sounds greenest.
|
||||
- System sizing (kWp, storage, grid-connection model) is open until the site
|
||||
is chosen.
|
||||
|
||||
### Zero contaminated water
|
||||
|
||||
The reference process schematic shows a conventional open "dirty water"
|
||||
cooling loop. We will not build it that way.
|
||||
|
||||
- Cooling (up to 250 kW, 220 l/min peak — ~98% of it mold cooling) will run as
|
||||
a closed loop with a cooling tower/chiller, so process water is recirculated
|
||||
rather than discharged.
|
||||
- Steam condensate will be recovered and returned to the treated feedwater
|
||||
cycle instead of being dumped.
|
||||
- The planned in-house galvanics line (silvering and stamper electroforming)
|
||||
involves plating chemistry — silver solutions and nickel baths. This is the
|
||||
hardest part of the zero-discharge commitment: rinse water will need
|
||||
closed-loop treatment and metal recovery, designed in from the start rather
|
||||
than retrofitted.
|
||||
- Solvent handling (flagged in the site requirements) will be contained and
|
||||
disposed of as controlled waste — never via wastewater.
|
||||
- Target: no process-water discharge to the local environment. Detailed water
|
||||
balance and treatment design are pending site selection.
|
||||
|
||||
### Materials
|
||||
|
||||
The plant design already includes a PVC recycling loop: an in-house grinder
|
||||
returns trimmings and rejects to the extruder, with the standard feed mix at
|
||||
80% virgin / 20% recycled compound. Record scrap becomes feedstock, not
|
||||
landfill.
|
||||
|
||||
For the virgin compound itself, the preference is **local (Thai/regional)
|
||||
PVC sourcing if the quality meets vinyl-record specifications**. The current
|
||||
supplier list (2021) is entirely European plus one US option; qualifying a
|
||||
local compound would cut shipping distance, cost, and the carbon footprint of
|
||||
the feedstock. European suppliers remain the fallback where quality demands
|
||||
it.
|
||||
|
||||
## Worker Safety
|
||||
|
||||
Worker safety is a founding priority, on equal footing with the environmental
|
||||
commitments:
|
||||
|
||||
- **Safety training** — proper, structured training for all operators and
|
||||
maintenance staff, starting with the vendor-led commissioning training and
|
||||
extending into an ongoing in-house program. The pressing line combines
|
||||
hydraulics (~180 bar), saturated steam (10 bar / 180 °C), and hot PVC —
|
||||
every one of these demands trained, deliberate handling.
|
||||
- **Clean rooms for galvanics** — silvering and stamper electroforming will
|
||||
run in dedicated clean rooms with controlled access, proper ventilation and
|
||||
exhaust, and decontamination procedures for people and equipment leaving
|
||||
the area. Plating chemistry stays inside its containment.
|
||||
- **Personal protective equipment** — appropriate PPE (overalls, gloves,
|
||||
goggles, and process-specific protection) is mandatory per work area, in
|
||||
line with the equipment vendor's site requirements (exhaust work benches,
|
||||
fire protection) and local regulations.
|
||||
|
||||
Safety infrastructure — training program, clean-room specification,
|
||||
decontamination workflow — will be planned alongside the equipment, not after
|
||||
it.
|
||||
|
||||
## Repository Layout
|
||||
|
||||
```
|
||||
docs/
|
||||
├── consulting/ Consultancy proposals and overviews
|
||||
├── equipment/
|
||||
│ └── newbilt/ Offers, site requirements, process schematic, service rates
|
||||
├── finance/ Project cost overviews
|
||||
└── suppliers/ PVC compound supplier contacts
|
||||
```
|
||||
|
||||
Documents are primary sources (vendor PDFs and spreadsheets) and reflect the
|
||||
state of negotiations at their file dates — treat prices and lead times as
|
||||
snapshots, not commitments.
|
||||
|
||||
## Roadmap for This Repo
|
||||
|
||||
- Accumulate planning and vendor documents as decisions firm up — including
|
||||
the mastering, cutting, and galvanics chain
|
||||
- Add structured data (inventory, orders, production batches) once operations
|
||||
begin
|
||||
- Host the software/tooling built to run the factory (tracking, ERP-style
|
||||
workflows)
|
||||