Add whole-factory HVAC requirement and process traceability spec
- facility-security.md: continuous temperature/humidity/PM control, zoned filtration, burning-season PM2.5 design point, HVAC in PV/battery sizing - traceability.md: end-to-end per-order customer traceability, batch genealogy, log-at-source principles, machine data access as a procurement requirement
This commit is contained in:
1 parent
0a4f47a5cc
commit
0b79c4fb73
5 files changed
+110
-9
No files matched your search
@@ -68,8 +68,12 @@ The detail lives in dedicated documents:
|
||||
- [Worker safety](docs/worker-safety.md): safety training, galvanics clean
|
||||
rooms and decontamination, PPE
|
||||
- [Facility security and site systems](docs/facility-security.md): access
|
||||
control, CCTV, archive and audio protection, fire and life safety, plant
|
||||
monitoring, Thai compliance anchors
|
||||
control, CCTV, whole-factory HVAC (temperature, humidity, PM), archive and
|
||||
audio protection, fire and life safety, plant monitoring, Thai compliance
|
||||
anchors
|
||||
- [Process logging and traceability](docs/traceability.md): end-to-end
|
||||
per-order traceability for customers, batch genealogy from audio file to
|
||||
shipment, and the requirements this sets for the factory software
|
||||
|
||||
## Repository Layout
|
||||
|
||||
@@ -82,8 +86,9 @@ docs/
|
||||
│ └── pressing-line.md Press fleet strategy and equipment plan
|
||||
├── finance/ Project cost overviews
|
||||
├── suppliers/ Supplier contacts, vendor landscape, supplier map
|
||||
├── facility-security.md Security, fire and life safety, compliance
|
||||
├── facility-security.md Security, HVAC, fire and life safety, compliance
|
||||
├── sustainability.md Energy, water, materials commitments
|
||||
├── traceability.md Process logging and per-order traceability
|
||||
└── worker-safety.md Training, clean rooms, PPE
|
||||
```
|
||||
|
||||
|
||||
@@ -1,8 +1,37 @@
|
||||
# Facility: Security and Site Systems
|
||||
|
||||
What the plant needs beyond the production machinery. Access control and
|
||||
CCTV are set requirements; the rest of this list is what a plant of this
|
||||
profile definitely needs, to be refined during site design.
|
||||
What the plant needs beyond the production machinery. Access control, CCTV,
|
||||
and whole-factory HVAC control are set requirements; the rest of this list
|
||||
is what a plant of this profile definitely needs, to be refined during site
|
||||
design.
|
||||
|
||||
## Climate control: whole-factory HVAC
|
||||
|
||||
The entire factory runs under continuous HVAC control, covering temperature,
|
||||
humidity, and particulate matter (PM). This is a set requirement, not an
|
||||
option per room.
|
||||
|
||||
- **Temperature and humidity**: the process spec already demands 20-26 °C at
|
||||
35-60% relative humidity for pressing; the same conditioning extends to
|
||||
the whole building so materials, masters, packaging stock, and electronics
|
||||
never sit outside controlled conditions. PVC compound and paper packaging
|
||||
are both humidity-sensitive.
|
||||
- **Particulate matter**: filtration for the whole plant, with stricter
|
||||
tiers by zone. Dust in a groove is an audible defect, so the cutting room
|
||||
and galvanics clean room run at the tightest spec with positive pressure;
|
||||
pressing and packaging run cleaner than ambient; offices and logistics at
|
||||
a baseline tier. Northern Thailand's burning season (roughly February to
|
||||
April) brings some of the world's worst PM2.5 episodes, so intake
|
||||
filtration and building tightness must be designed for those peaks, not
|
||||
for average days.
|
||||
- **Continuous monitoring and alarms**: temperature, humidity, and PM
|
||||
sensors logging in every zone, with alarms on excursions, tied into the
|
||||
plant monitoring below.
|
||||
- **Energy design**: conditioning a whole factory in a tropical climate is
|
||||
a major electrical load on top of the 250 kW process cooling, and it must
|
||||
be included in the solar PV and battery sizing from the start. Heat
|
||||
recovery from the press hall (steam, hydraulics, and hot PVC all reject
|
||||
heat) and from compressors should feed the design rather than fight it.
|
||||
|
||||
## Physical security
|
||||
|
||||
@@ -58,9 +87,9 @@ profile definitely needs, to be refined during site design.
|
||||
- **Lightning protection and grounding**: northern Thailand has intense
|
||||
storm seasons; the PV array, steel structures, and electronics all need a
|
||||
proper LPS and earthing design.
|
||||
- **Environmental monitoring**: temperature and humidity logging in
|
||||
production (the process spec calls for 20-26 °C, 35-60% RH), the archive,
|
||||
and the clean room.
|
||||
- **Environmental monitoring**: the whole-factory HVAC monitoring above
|
||||
(temperature, humidity, PM in every zone), with the archive and clean room
|
||||
as the most tightly alarmed spaces.
|
||||
|
||||
## Compliance anchors (Thailand)
|
||||
|
||||
|
||||
@@ -160,6 +160,9 @@ Open: identify and qualify Thai/regional PVC compound producers.
|
||||
- Water treatment for boiler feed and closed-loop cooling
|
||||
- Compressed air generation
|
||||
- Hydraulic oil (~200 L, ISO VG 32/46 HLP per DIN 51524-2, per Newbilt spec)
|
||||
- Whole-factory HVAC: continuous temperature (20-26 °C), humidity (35-60%
|
||||
RH), and PM control with zoned filtration tiers, sized for northern
|
||||
Thailand burning-season PM2.5 peaks; a major load for PV/battery sizing
|
||||
- Clean rooms, ventilation, decontamination infrastructure for galvanics
|
||||
- Fire protection, exhaust work benches, PPE stock
|
||||
|
||||
|
||||
@@ -35,6 +35,10 @@ at 10 bar / 180 °C) and the 250 kW cooling system.
|
||||
abundant fuel), and solar-thermal pre-heating of boiler feedwater. No
|
||||
technology choice has been made yet; it will be driven by honest numbers on
|
||||
load profiles, storage, and grid backup, not by what sounds greenest.
|
||||
- Whole-factory HVAC (continuous temperature, humidity, and PM control, see
|
||||
[facility systems](facility-security.md)) adds a major tropical-climate
|
||||
load on top of process cooling and must be part of the PV and battery
|
||||
sizing.
|
||||
- System sizing (kWp, storage, grid-connection model) is open until the site
|
||||
is chosen.
|
||||
|
||||
|
||||
@@ -0,0 +1,60 @@
|
||||
# Process Logging and Traceability
|
||||
|
||||
Every step of production is logged continuously, so that every record is
|
||||
traceable end to end for the customer. This is a set requirement, and it is
|
||||
the core specification for the factory software this repository will
|
||||
eventually host.
|
||||
|
||||
## What a customer can trace
|
||||
|
||||
For any order, the customer can follow the full chain:
|
||||
|
||||
1. **Audio intake**: file received, checksums, versions, who handled it,
|
||||
approval trail
|
||||
2. **Mastering**: session log, engineer, settings, customer approvals
|
||||
3. **Cutting**: lacquer IDs, lathe parameters, stylus used, inspection
|
||||
result
|
||||
4. **Galvanics**: silvering and plating batch IDs, bath chemistry logs,
|
||||
father/mother/stamper genealogy (which stamper came from which mother
|
||||
from which father), or the external stamper supplier and batch if bridged
|
||||
5. **Pressing**: press ID, operator, shift, mold and stamper IDs, cycle
|
||||
parameters (temperatures, pressures, cycle times), PVC compound lot and
|
||||
virgin/recycled mix, label lot
|
||||
6. **Quality control**: test pressing approvals, inspection results, reject
|
||||
counts and reasons
|
||||
7. **Finishing and packaging**: trimming, sleeving, carton lot, packaging
|
||||
partner batch
|
||||
8. **Fulfillment**: warehouse location, shipment or dropshipping consignment,
|
||||
carrier tracking per end customer
|
||||
|
||||
## Principles
|
||||
|
||||
- **Log at the source**: machine data comes from the machine (the presses
|
||||
and the plating rectifiers expose PLC data; the AD12 supports remote
|
||||
monitoring), not from manual transcription. Manual steps get simple
|
||||
operator check-ins, not paperwork.
|
||||
- **Batch and genealogy first**: every physical artifact (lacquer, father,
|
||||
mother, stamper, press run, box) gets an ID, and every ID knows its
|
||||
parents. A customer complaint about one record resolves to a specific
|
||||
stamper, press, shift, and compound lot.
|
||||
- **Environment attached**: the whole-factory HVAC monitoring (temperature,
|
||||
humidity, PM per zone) is logged on the same timeline, so any production
|
||||
window can be correlated with plant conditions.
|
||||
- **Immutable and retained**: logs are append-only and retained for the
|
||||
life of the customer relationship; stamper genealogy is retained as long
|
||||
as the archive holds the metal parts.
|
||||
- **Customer-facing view**: traceability is a product feature, not an
|
||||
internal file. Customers get a per-order view (portal or report) covering
|
||||
the chain above, without exposing other customers' data.
|
||||
|
||||
## Open design work
|
||||
|
||||
- Data model for batch genealogy across all eight steps
|
||||
- Which PLC/machine interfaces each vendor exposes (ask Newbilt, Pheenix
|
||||
Alpha, and Digital Matrix during procurement, before purchase)
|
||||
- Retention, backup, and PDPA handling for operator-linked records
|
||||
- Whether test-pressing approval workflows live in the same system from day
|
||||
one
|
||||
|
||||
This system should be specified alongside equipment procurement: machine
|
||||
data access is a purchasing requirement, not an afterthought.
|
||||