Production hall: rough BIM layout sketch

FreeCAD BIM (Arch) sketch of the 60 x 25 m phase 1 hall:
Building > Ground floor with Spaces for every zone (areas computed),
room-in-room partitions, the fire wall at 48 m, the 5 t crane runway,
and the main equipment as BIM Equipment (Pheenix line, Sibert row,
Newbilt Duplex and two Classic presses, silos, racking). Zones run in
process order along the visitor corridor. Top-view PNG alongside.
Linked from the README and from the crane doc, with the one conflict it
shows: reception and cutting room under the crane travel.
This commit is contained in:
grabowski committed 2026-10-07 09:40:13 +02:00
1 parent 856e0a2ccf
commit 79e8cddcff
4 files changed
+19

No files matched your search

+7
View File
@@ -111,6 +111,11 @@ The detail lives in dedicated documents:
end, and a glazed ground-level corridor for guided tours without noise,
dust or plating chemistry; what each changes in the building and what
it costs
- [Production hall layout sketch](docs/production-hall-layout-sketch.png):
a rough BIM sketch in FreeCAD (`docs/production-hall-layout-sketch.FCStd`)
of the 60 x 25 m phase 1 hall: zones in process order along the visitor
corridor, the crane zone, room-in-room boxes and the main equipment; every
position is an estimate
- [Process logging and traceability](docs/traceability.md): end-to-end
per-order traceability for customers, batch genealogy from audio file to
shipment, and the requirements this sets for the factory software
@@ -211,6 +216,8 @@ docs/
├── payap-partnership.md Joint student programmes with Payap University
├── plant-operation.html Animated plant overview (simulated SCADA)
├── process-flow.md Audio file to delivered record, with all checks
├── production-hall-layout-sketch.FCStd Rough BIM layout sketch of the hall
├── production-hall-layout-sketch.png Top view of the sketch
├── production-timeline.md Order turnaround, stage by stage
├── project-timeline.md Calendar to first paying release, critical path
├── quality-automation.md Stamper metrology and layered record QC
+12
View File
@@ -285,6 +285,18 @@ window or not at all. The concept drawing
and the detached utility yard and does not yet follow this order; it
needs redrawing at the next layout pass.
A first rough pass that does follow it is the BIM sketch
[production-hall-layout-sketch.FCStd](production-hall-layout-sketch.FCStd)
(top view: [PNG](production-hall-layout-sketch.png), October 2026): ramp
end with machine door, workshop and spares; then mastering, galvanics,
stamper prep, PVC lab and material area, the press hall, inspection, QC
and packaging along the corridor; the fire wall at 48 m and the warehouse
and dispatch at the dock end, with a 4.5 m crane and forklift aisle along
the back wall from the machine door to the fire wall. It shows one
conflict to resolve: with the workshop at the ramp end, reception and the
cutting room sit under the bridge's travel too, against point 6 above
(cutting room outside the crane zone).
### How it is built
- **Room-in-room**: a glazed wall on the production side, a solid roof at
Binary file not shown.
Binary file not shown.

After