Add biomass fuel strategy: 60 rai coppice idea and northern fuel market
Own land yields ~80-135 t/yr vs ~350-400 t/yr mature demand; forestry classification check gates everything; staged electric-first path with coppice planted now for the expansion-phase biomass boiler
This commit is contained in:
1 parent
5184014a2d
commit
50a75c1fa4
2 files changed
+92
No files matched your search
@@ -67,6 +67,10 @@ The detail lives in dedicated documents:
|
||||
commitment, and the materials strategy
|
||||
- [Worker safety](docs/worker-safety.md): safety training, galvanics clean
|
||||
rooms and decontamination, PPE
|
||||
- [Biomass fuel strategy](docs/biomass.md): the 60 rai own-grown coppice
|
||||
idea (with the forestry-classification check that comes first), northern
|
||||
agricultural waste as the main supply, and the staged electric-to-biomass
|
||||
path
|
||||
- [BOI investment promotion](docs/boi.md): the promotion strategy (Group B
|
||||
base activity plus solar, automation, and R&D measures for the tax value),
|
||||
requirements, Northern-region angle, and why BOI approval precedes
|
||||
@@ -97,6 +101,7 @@ docs/
|
||||
│ └── pressing-line.md Press fleet strategy and equipment plan
|
||||
├── finance/ Project cost overviews
|
||||
├── suppliers/ Supplier contacts, vendor landscape, supplier map
|
||||
├── biomass.md Biomass fuel strategy and the 60 rai coppice idea
|
||||
├── boi.md BOI promotion strategy and requirements
|
||||
├── facility-security.md Security, HVAC, fire and life safety, compliance
|
||||
├── process-flow.md Audio file to delivered record, with all checks
|
||||
|
||||
@@ -0,0 +1,87 @@
|
||||
# Biomass Fuel Strategy
|
||||
|
||||
If the steam boiler goes the biomass route (see the options in
|
||||
[sustainability](sustainability.md) and the Getabec candidate in the
|
||||
[utilities CSV](finance/utilities-investment.csv)), the fuel comes from two
|
||||
sources: the team's own 60 rai of currently unused land, and northern
|
||||
Thailand's agricultural waste market. Figures below are planning estimates,
|
||||
plus or minus a wide margin, to be refined against the actual boiler choice
|
||||
and duty cycle.
|
||||
|
||||
## Demand: what the boiler would burn
|
||||
|
||||
The 400 kg/h boiler is roughly 300 kW thermal at full fire. With the heat
|
||||
recovery architecture trimming the load and realistic duty cycles:
|
||||
|
||||
- Mature plant (semi-auto plus automated lines, two shifts, ~300 days/yr):
|
||||
roughly **350 to 400 tonnes of air-dry wood per year** (at ~80% boiler
|
||||
efficiency and ~4 kWh/kg air-dry wood)
|
||||
- Early operations (one press line, single shift): roughly a quarter of
|
||||
that, **~90 to 100 t/yr**
|
||||
|
||||
## The 60 rai: own-grown fuelwood
|
||||
|
||||
60 rai is 9.6 hectares. Managed as short-rotation coppice (planted once,
|
||||
harvested on a 2 to 4 year cycle, regrowing from the stump), fast species
|
||||
proven in Thailand (eucalyptus, acacia, leucaena, bamboo) yield roughly 8 to
|
||||
14 air-dry tonnes per hectare per year. So the land can sustainably supply
|
||||
about **80 to 135 t/yr**:
|
||||
|
||||
- Enough to cover **most or all of early operations**
|
||||
- About **a quarter to a third of mature two-shift demand**
|
||||
|
||||
That makes the land a meaningful supplement and a strong brand story
|
||||
("records pressed with steam from our own trees"), not a complete fuel
|
||||
supply.
|
||||
|
||||
### The classification check comes first
|
||||
|
||||
The land is currently classified as forestry, and in Thailand that carries
|
||||
legal weight. Before a single tree enters the fuel plan:
|
||||
|
||||
- Verify the parcel's actual status: clean Chanote title vs Sor Por Kor vs
|
||||
National Forest Reserve. Planting, harvesting, and transporting trees,
|
||||
even self-planted ones, can be restricted depending on classification,
|
||||
and some species are restricted regardless.
|
||||
- If eligible, register the plantation under the forest plantation
|
||||
framework, which legalizes grow-and-harvest cycles and the transport
|
||||
paperwork.
|
||||
- If the parcel carries actual standing forest, it should not be harvested
|
||||
for fuel: that would undercut the sustainability commitments the plant is
|
||||
built on. Coppice belongs on the degraded or empty portions.
|
||||
|
||||
## Filling the gap: the northern biomass market
|
||||
|
||||
The region fills the remainder easily and cheaply:
|
||||
|
||||
- **Longan orchard prunings**: Lamphun is Thailand's longan heartland and
|
||||
prunings are an established traded fuel
|
||||
- **Sawmill and wood-processing residues**
|
||||
- **Corn cobs and rice husk**: abundant regional crop wastes; a
|
||||
Getabec-class solid-fuel boiler is designed for exactly this fuel mix
|
||||
- Buying from local farmers also strengthens the local-sourcing story that
|
||||
already runs through packaging and PVC
|
||||
|
||||
## Logistics on site
|
||||
|
||||
To reflect in the facility planning: a fuel storage shed (biomass
|
||||
must be kept dry; monsoon-season storage sizing matters more than dry
|
||||
season), chipping for coppice wood, ash handling, and the emissions stack
|
||||
that comes with solid fuel. These are the capex/opex adders that the
|
||||
biomass premium in the utilities CSV (roughly 4M to 7M THB for the boiler
|
||||
package vs 2.5M to 4M electric/gas) partially reflects; fuel handling and
|
||||
storage are additional.
|
||||
|
||||
## Decision framing
|
||||
|
||||
- Biomass makes the steam genuinely renewable and pairs with cheap northern
|
||||
fuel, at the cost of higher capex, fuel logistics, ash, and an emissions
|
||||
point
|
||||
- The 60 rai tilts the economics and the story further toward biomass, but
|
||||
only after the land-title check clears
|
||||
- The electric boiler remains the alternative: cleanest permitting, no fuel
|
||||
logistics, but effectively grid-powered steam at a ~300 kW draw
|
||||
- A staged path is possible: start electric (fast, clean permitting), plant
|
||||
the coppice now (first harvest in 2 to 4 years), and add the biomass
|
||||
boiler at the automated-line expansion when demand and the fuel supply
|
||||
have both matured
|
||||