User, October 2026: special designs will need tens of colours, so the
compound store needs far more space, with maybe a few silos for black and
the standard colours; and the wall between stamper prep and galvanics is
to go.
- pressing-line: "Compound storage" bullet (colour store with pallet
racking, ~100 positions in the Payap model, estimate; outdoor silos
proposed; compound stays on the ground floor, ~160 to 270 t a year at
the mature fleet; sacks vs big bags decides the silo filling).
- galvanics: stamper prep open to galvanics, one clean zone.