grabowski
c07c554169
Add marking method per material: cold scribe on lacquers, laser on nickel, none on PVC
...
Laser marking excluded on lacquers (nitrocellulose flammability) and on
pressed records (HCl fumes from PVC), per the safety commitments
2026-07-17 15:28:24 +07:00
grabowski
c5ec01369b
Add stamper part marking and orientation fiducials; label alignment noted as deprioritized option
2026-07-17 15:26:34 +07:00
grabowski
d194ebdc30
Add tiered PVC lab checks: per-lot benchtop, in-house workhorses, external qualification panel
2026-07-17 15:23:36 +07:00
grabowski
5b6beba305
Soften packaging assembly-check claim per review
2026-07-17 15:17:11 +07:00
grabowski
d85e8fec8d
Add raw PVC per-lot and packaging QC gates to quality automation spec
2026-07-17 15:16:33 +07:00
grabowski
808e3e34b8
Add quality automation spec: stamper metrology and layered record QC
...
- Keyence-class instrument stack for father/mother/stamper analysis
(VK-X confocal sampled zones, VR-6000 wide-area, XRF thickness) with
genealogy integration via middleware
- Three-layer pressed-record QC: 100% inline optical inspection,
per-cycle press telemetry, sampled automated audio comparison
- Honest limits documented: no turnkey products exist for the optical
and audio layers; 100% audio QC impossible at press speed
2026-07-17 13:56:45 +07:00
grabowski
6c1b1e7bbd
Add factory layout concept diagram and fix fire-suppression section structure
...
- docs/facility-layout.drawio: zoned floor concept (production, galvanics,
utilities, logistics, support) with material and stamper flow arrows
- PNG and PDF exports alongside the source
- facility-security.md: suppression subsection no longer splits the fire
safety bullet list; clean agent wording updated to FK-5-1-12
2026-07-17 13:41:23 +07:00
grabowski
0b79c4fb73
Add whole-factory HVAC requirement and process traceability spec
...
- facility-security.md: continuous temperature/humidity/PM control, zoned
filtration, burning-season PM2.5 design point, HVAC in PV/battery sizing
- traceability.md: end-to-end per-order customer traceability, batch
genealogy, log-at-source principles, machine data access as a
procurement requirement
2026-07-17 13:05:46 +07:00
grabowski
0a4f47a5cc
Split README into topic documents
...
- README reduced to overview with linked document index
- docs/equipment/pressing-line.md: fleet strategy, Newbilt plan, site reqs
- docs/suppliers/vendor-landscape.md: researched vendor narratives
- docs/sustainability.md: solar, zero-discharge water, materials
- docs/worker-safety.md: training, clean rooms, PPE
- docs/facility-security.md: access control, CCTV, archive/audio protection,
fire and life safety, plant monitoring, Thai compliance anchors
2026-07-17 12:51:04 +07:00
grabowski
6281c5b223
Add solar hardware plan: Deye hybrid inverters + Gobel Power 271 kWh BESS
...
Includes open engineering checks: battery rack voltage vs Deye model
window, Gobel safety certifications, and peak-shaving-scale framing
2026-07-17 12:41:52 +07:00
grabowski
4c44b39e0c
Add vendor landscape to README and equipment supplier map
...
- README: vendor sections for Agnew Analog (lathe), Plating Power/Digital
Matrix (galvanics), Sibert (stamper prep), Stamper Discs (bridge stamper
service), Pheenix Alpha (automated presses)
- docs/suppliers/equipment-suppliers.md: full needs list and supplier map
across all nine areas of the production chain
2026-07-17 12:22:04 +07:00
grabowski
d9970d335f
Update README: remove em dashes, add packaging/dropshipping, 50/50 press fleet strategy
2026-07-17 11:58:13 +07:00
grabowski
d1bffb217e
Rename B4L to buildfor.life
2026-07-17 11:53:22 +07:00
grabowski
abfa6f1ee1
Correct project attribution: add team section, B4L is consulting support
2026-07-17 11:53:06 +07:00
grabowski
08a1607e22
Add README: project vision, equipment plan, sustainability and safety commitments
2026-07-17 11:51:11 +07:00
grabowski
5622ab2821
Initial commit: planning documents
...
- docs/: Newbilt equipment offer, site requirements, process schematic,
service rates, project cost overview, PVC supplier list, consultancy overview
- .gitignore excluding local tooling config and runtime state
2026-07-17 11:47:47 +07:00