Energy: PEA tariff, electric vs biomass steam, PV vs solar thermal
PEA tariff schedule (May 2023 onward, still current) filed under docs/finance/pea/; Ft 0.1623 THB/kWh for Sep-Dec 2026 from the PEA Ft page. The plant falls under Schedule 3.2.2 (Medium General Service, TOU, 22 kV). New section in sustainability.md: blended ~3.81 THB/kWh for two-shift production plus 132.93 THB/kW demand charge; electric steam ~4.7M-5.5M THB/yr at maturity against ~0.35M-0.8M of biomass fuel; self-consumed PV worth ~3.7 THB/kWh (~4.5-7 yr payback); solar thermal not recommended; the battery earns little from TOU arbitrage or peak shaving. biomass.md, scale.md, the utilities CSV note and the README follow.
This commit is contained in:
1 parent
79e8cddcff
commit
9640a4f075
6 files changed
+137
-18
No files matched your search
+104
-10
@@ -27,14 +27,19 @@ at 10 bar / 180 °C) and the 250 kW cooling system.
|
||||
rack's DC voltage window to the specific Deye model (a full 15-pack rack
|
||||
can exceed the 800 V window of the smaller Deye series), and obtaining
|
||||
Gobel's safety certifications (not published) for a Thai commercial
|
||||
install. At 271 kWh the stack is a peak-shaving and ride-through buffer,
|
||||
not full off-grid autonomy, against loads like the 250 kW cooling system.
|
||||
install. At 271 kWh the stack is a ride-through buffer, not full
|
||||
off-grid autonomy, against loads like the 250 kW cooling system; under
|
||||
PEA's time-of-use tariff it earns little from peak shaving
|
||||
([grid tariff](#grid-tariff-pea-and-what-it-decides)).
|
||||
- The machine load and cooling system are straightforward PV targets.
|
||||
- Steam is the open engineering question. Options under evaluation include an
|
||||
electric boiler (maximizes the solar share), a biomass boiler (locally
|
||||
abundant fuel), and solar-thermal pre-heating of boiler feedwater. No
|
||||
technology choice has been made yet; it will be driven by honest numbers on
|
||||
load profiles, storage, and grid backup, not by what sounds greenest.
|
||||
- Steam is the open engineering question. Options under evaluation are an
|
||||
electric boiler (maximizes the solar share) and a biomass boiler (locally
|
||||
abundant fuel); solar-thermal pre-heating of boiler feedwater was
|
||||
considered and is not recommended. No technology choice has been made
|
||||
yet; it will be driven by honest numbers on load profiles, storage, and
|
||||
grid backup, not by what sounds greenest. At PEA's tariff, biomass heat
|
||||
costs about a tenth of electric steam
|
||||
([grid tariff](#grid-tariff-pea-and-what-it-decides)).
|
||||
- Whole-factory HVAC (continuous temperature, humidity, and PM control, see
|
||||
[facility systems](facility-security.md)) adds a major tropical-climate
|
||||
load on top of process cooling and must be part of the PV and battery
|
||||
@@ -117,9 +122,10 @@ reusing it before generating anything new:
|
||||
dehumidification reheat (the 35 to 60% RH spec means air is cooled below
|
||||
dew point and reheated continuously) run on recovered press heat instead
|
||||
of fresh electricity.
|
||||
- **Solar thermal feedwater preheat**: flat-plate or evacuated-tube
|
||||
collectors reach 60 to 90 °C trivially in the Thai sun; cheap, proven, and
|
||||
stackable with the heat pump recovery.
|
||||
- **Solar thermal feedwater preheat** (considered, not recommended):
|
||||
flat-plate or evacuated-tube collectors reach 60 to 90 °C easily in the
|
||||
Thai sun, but that is the temperature the heat pump already recovers for
|
||||
free, and the roof earns more as PV (see the grid tariff section below).
|
||||
- **Steam accumulator**: the presses draw steam in bursts, so an accumulator
|
||||
(already a Newbilt option) lets a smaller boiler ride the peaks.
|
||||
- **The boiler only does the final lift**: whichever technology is chosen
|
||||
@@ -145,6 +151,94 @@ diesel means a fuel tank with price exposure. The electric and biomass paths
|
||||
avoid a fossil tank on the property entirely, which matters for both the
|
||||
sustainability commitments and the BOI story.
|
||||
|
||||
### Grid tariff (PEA) and what it decides
|
||||
|
||||
Source: PEA's electricity tariff schedule effective from the May 2023 bill
|
||||
(unofficial English translation, filed as
|
||||
[`finance/pea/EN_Electricity_Tariffs_May_2023.pdf`](finance/pea/EN_Electricity_Tariffs_May_2023.pdf)),
|
||||
still the current schedule on PEA's
|
||||
[tariff page](https://www.pea.co.th/en/our-services/tariff), and the Ft on
|
||||
PEA's [Ft page](https://www.pea.co.th/en/our-services/tariff/ft), both
|
||||
checked 7 October 2026. Plant consumption and demand are this repo's
|
||||
estimates ([scale](scale.md)).
|
||||
|
||||
**Which tariff applies.** At 300 to 750 kW of peak demand the plant is
|
||||
Schedule 3, Medium General Service (30 to under 1,000 kW and at most
|
||||
250,000 kWh a month on a three-month average). The flat-rate 3.1 is closed
|
||||
to customers classified after November 2015, so a new plant is on **3.2,
|
||||
Time of Use**, and with a 22 kV connection on 3.2.2:
|
||||
|
||||
| Item | Rate |
|
||||
|---|---|
|
||||
| Demand charge | 132.93 THB per kW of the highest 15-minute demand in peak hours |
|
||||
| Energy, peak (09:00 to 22:00, Monday to Friday) | 4.1839 THB/kWh |
|
||||
| Energy, off-peak (22:00 to 09:00 on weekdays; all day on weekends and public holidays) | 2.6037 THB/kWh |
|
||||
| Service charge | 312.24 THB/month |
|
||||
| Ft, fuel adjustment (September to December 2026) | +0.1623 THB/kWh, reset every four months |
|
||||
| VAT | 7 % on top; reclaimable for a VAT-registered company, so left out below |
|
||||
|
||||
Rules that shape the design: metering on the low-voltage side of our own
|
||||
transformer adds 2 % to kW and kWh, so meter at 22 kV; the minimum bill is
|
||||
70 % of the highest demand charge of the last twelve months; a power factor
|
||||
below about 0.85 (reactive demand above 61.97 % of active) costs 56.07 THB
|
||||
per kVAR, so the motor loads need correction. With electric steam the plant
|
||||
would average ~210,000 kWh a month (estimate) and busy months could cross
|
||||
250,000, which moves it to Schedule 4; that schedule's TOU rate 4.2.2 is
|
||||
identical, so the price does not change. Connecting a high-voltage meter
|
||||
below 69 kV costs a 15,000 THB inspection fee plus a security deposit of
|
||||
400 THB per kVA (PEA tariff page, rates from January 2020): 200k to 400k
|
||||
THB for a 500 to 1,000 kVA transformer.
|
||||
|
||||
**What it costs the plant.** Two shifts from 06:00 to 22:00 on ~300 days
|
||||
(about 243 weekdays and 57 Saturdays, estimate) put ~66 % of process energy
|
||||
into peak hours: a blended **~3.81 THB/kWh** including Ft, before the
|
||||
demand charge. Without electric steam (1,000 to 1,500 MWh a year, 300 to
|
||||
450 kW peak) the bill comes to roughly **4.3M to 6.4M THB a year** before
|
||||
solar, 0.5M to 0.7M of it demand charge (estimate).
|
||||
|
||||
**Electric versus biomass steam**, for the same heat as in
|
||||
[biomass](biomass.md): 350 to 400 t of wood at 80 % boiler efficiency,
|
||||
~1,120 to 1,280 MWh of heat a year at maturity.
|
||||
|
||||
| | Electric boiler (~98 %) | Biomass boiler (~80 %) |
|
||||
|---|---|---|
|
||||
| Price of heat | ~3.9 THB/kWh, plus the demand charge | ~0.3 to 0.6 THB/kWh at 1 to 2 THB/kg of fuel (fuel price not yet checked with local suppliers) |
|
||||
| Running cost, mature two shifts | **~4.7M to 5.5M THB/yr**: 1,140 to 1,310 MWh plus 200 to 300 kW of extra peak demand (0.3M to 0.5M) | **~0.35M to 0.8M THB/yr** of fuel, plus fuel handling and ash |
|
||||
| Boiler package ([utilities CSV](finance/utilities-investment.csv)) | 2.5M to 4M THB | 4M to 7M THB, plus the fuel store |
|
||||
| Grid | peak demand 600 to 750 kW: bigger transformer and deposit | unchanged |
|
||||
|
||||
The electric boiler is the more efficient machine; biomass is by far the
|
||||
cheaper heat. At maturity the fuel saving of ~4M to 5M THB a year repays
|
||||
the biomass premium in about a year (estimate). Even early, at a quarter of
|
||||
the heat, electric steam costs ~1.4M to 1.7M THB a year against ~0.1M to
|
||||
0.2M of fuel, because the demand charge is set by the boiler's full-power
|
||||
draw, not by its average. Moving electric steam to off-peak hours barely
|
||||
helps: the presses need steam while they run, and the peak window covers
|
||||
13 of the 16 production hours. The staged electric-first path in
|
||||
[biomass](biomass.md) is therefore a permitting and fuel-logistics choice,
|
||||
not a cost one.
|
||||
|
||||
**PV, not solar thermal.** Self-consumed PV is worth **~3.7 THB/kWh**
|
||||
(weekday daytime at the peak rate, weekends and early mornings at
|
||||
off-peak, Ft included), so the 247 kWp roof saves ~1.2M to 1.3M THB a year
|
||||
and pays back in **~4.5 to 7 years** at 25,000 to 35,000 THB/kWp
|
||||
(estimate). It does not lower the demand charge, because the peak window
|
||||
runs to 22:00, long after sunset. Solar thermal loses on every count here:
|
||||
flat-plate and evacuated-tube collectors reach only the 60 to 90 °C that
|
||||
the feedwater heat pump already recovers from the press cooling return;
|
||||
concentrating collectors that could reach 180 °C need strong direct sun,
|
||||
which northern Thailand's haze and burning season do not give; and PV
|
||||
through a heat pump at a COP of ~3 delivers low-grade heat for ~1.2
|
||||
THB/kWh while also serving every other load. So the roof gets PV
|
||||
throughout and no solar thermal, and feedwater preheat stays with heat
|
||||
recovery.
|
||||
|
||||
**The battery does not pay through the tariff.** Charging off-peak and
|
||||
discharging at peak earns ~1.1 THB/kWh after losses, ~70k THB a year for
|
||||
the 271 kWh stack, and spread over the 13-hour weekday peak window it can
|
||||
hold demand down by only ~20 kW (~30k THB a year) (estimates). Its case is
|
||||
ride-through and outage resilience, not peak shaving.
|
||||
|
||||
## Water supply
|
||||
|
||||
The zero-discharge commitment below governs water *leaving* the plant. It
|
||||
|
||||
Reference in new issue
Block a user