Energy: PEA tariff, electric vs biomass steam, PV vs solar thermal
PEA tariff schedule (May 2023 onward, still current) filed under docs/finance/pea/; Ft 0.1623 THB/kWh for Sep-Dec 2026 from the PEA Ft page. The plant falls under Schedule 3.2.2 (Medium General Service, TOU, 22 kV). New section in sustainability.md: blended ~3.81 THB/kWh for two-shift production plus 132.93 THB/kW demand charge; electric steam ~4.7M-5.5M THB/yr at maturity against ~0.35M-0.8M of biomass fuel; self-consumed PV worth ~3.7 THB/kWh (~4.5-7 yr payback); solar thermal not recommended; the battery earns little from TOU arbitrage or peak shaving. biomass.md, scale.md, the utilities CSV note and the README follow.
This commit is contained in:
1 parent
79e8cddcff
commit
9640a4f075
6 files changed
+137
-18
No files matched your search
+12
-2
@@ -80,8 +80,18 @@ storage are additional.
|
||||
- The 60 rai tilts the economics and the story further toward biomass, but
|
||||
only after the land-title check clears
|
||||
- The electric boiler remains the alternative: cleanest permitting, no fuel
|
||||
logistics, but effectively grid-powered steam at a ~300 kW draw
|
||||
logistics, but effectively grid-powered steam at a ~300 kW draw. On
|
||||
PEA's time-of-use tariff that costs ~4.7M to 5.5M THB a year at mature
|
||||
load against ~0.35M to 0.8M of fuel for biomass, and ~1.4M to 1.7M
|
||||
against ~0.1M to 0.2M at early load, because the demand charge follows
|
||||
the boiler's full-power draw (estimates; see the
|
||||
[grid tariff](sustainability.md#grid-tariff-pea-and-what-it-decides)).
|
||||
The electric boiler is the more efficient machine; biomass is the far
|
||||
cheaper heat
|
||||
- A staged path is possible: start electric (fast, clean permitting), plant
|
||||
the coppice now (first harvest in 2 to 4 years), and add the biomass
|
||||
boiler at the automated-line expansion when demand and the fuel supply
|
||||
have both matured
|
||||
have both matured. At the tariff above that is a permitting and logistics
|
||||
choice, not a cost one: every year on electric steam costs roughly 1.2M
|
||||
to 5M THB more than biomass, so the switch should come as soon as the
|
||||
permit and a fuel contract are in place
|
||||