Investor deck rebuilt around Plan B (16 slides)
Deploy test site / deploy (push) Successful in 59s

User, 19 Oct 2026: build the deck again but focus on Plan B, the main
investor wants to go with that.

- Proposes Plan B, ~217M THB at the midpoint (~6.56M USD), labelled
  ~215M; Plan A (~182M) only as the comparison. Every running footer,
  source line and speaker note now presents Plan B.
- New slide 9 "Why Plan B": ownership and control, not a higher
  modelled return (owned roof PV and battery instead of a PPA, full
  metrology from the first release, corridor and tours from day one,
  cassette and CD-R, bought crane, Thai utilities; ~34.5M THB together);
  Plan A has the better modelled return, owning the array earns no BOI
  tax benefit.
- Investment by block for Plan B with low-high ranges, the "what Plan B
  buys" table, no contingency (~30M at 15 %); operating picture, cash
  curve (payback ~4.2, IRR ~22 %, NPV ~4.7M USD) and BOI slide (equity
  at least ~54M THB at 3:1, owned PV and battery as collateral) for B;
  B-specific risks; the ask with the Plan B tranches only.
- Plan B renders replace the Plan A ones; PDF regenerated, 16 pages,
  1.5 MB.
- README and landing page entries say 16 slides and Plan B.
- Checks: every slide at 1920/1440/1280/390 px without overflow,
  navigation and presenter sync, PDF pages and text, no em dashes.
This commit is contained in:
grabowski committed 2026-10-20 13:45:30 +07:00
1 parent 995bb4ba60
commit 81de64c8a1
10 files changed
+291 -219

No files matched your search

+9 -7
View File
@@ -71,13 +71,15 @@ document.documentElement.setAttribute("data-theme",t);})();
<ul>
<li>
<a href="pitch/">
<strong>Investment proposal (slides)</strong>
<span>The plant in 15 slides for BOI, bank and institutional
readers: the opportunity, the full chain under one roof, the
platform, site and utilities, Plans A and B by block, the operating
picture with its adverse case, cash and returns, BOI promotion and
its conditions, schedule, risks, team and the ask. Press P for the
presenter view; a PDF is linked in the control bar.</span>
<strong>Investment proposal, Plan B (slides)</strong>
<span>The plant in 16 slides for BOI, bank and institutional
readers, proposing Plan B (~215M THB), the plan the main investor
wants, with Plan A as the comparison: the opportunity, the full
chain under one roof, the platform, site and utilities, Plan B by
block and why Plan B, the operating picture with its adverse case,
cash and returns, BOI promotion and its conditions, schedule,
risks, team and the ask. Press P for the presenter view; a PDF is
linked in the control bar.</span>
</a>
</li>
</ul>