A separate FreeCAD 26.3 model (the Mueang Chi model is untouched) sites the plant on a 110 m square placeholder plot of Payap land, built from BIM objects (Arch Site, Buildings and Levels, walls, slabs, columns, beams, a ramp, Spaces with computed areas, Equipment). Every object sits on an expression-driven base, so the Params sheet drives plot, setbacks, floor level, building sizes, fire wall line and office gap (checked: plot 110 to 120 m and factory 84 to 90 m, everything followed). - Factory 84 x 25 m, production only, in process order along a 54 m glazed corridor; press hall 465 m2 with the October fleet (two Duplex systems, each EX 50 + EX 35, and the Classic); crane to the fire wall; machine door and 12 m ramp at the north-west corner. - Office building 24 x 15 m, 12 m away on its own slab with a covered link: reception, offices, meeting/training, mastering and cutting, listening, IT, archive. Resolves the crane-zone conflict of the old sketch. - Utility yard behind the press hall (boiler and chiller flagged for re-sizing), gate, truck apron, car park, service road. - site-candidates: new section and plot-fit note; crane doc: conflict resolved, 54 m corridor; README bullet and layout lines; the old sketch is labelled as Mueang Chi with the earlier fleet.
168 lines
9.7 KiB
Markdown
168 lines
9.7 KiB
Markdown
# Site Candidates
|
||
|
||
The site strategy is a long lease of raw land on which the purpose-built
|
||
plant is constructed (business plan section 6.1, built from
|
||
`business-plan/build/`). What any site has to offer is unchanged: ~4 rai
|
||
minimum and 6 to 8 rai with expansion, truck access and turning, room for
|
||
the cooling tower and a separated battery enclosure, a 500 to 1,000 kVA
|
||
medium-voltage connection, a slab rated 3 t/m² and a frame able to carry
|
||
the overhead crane ([scale](scale.md),
|
||
[crane, workshop and tours](crane-workshop-tours.md)), factory permission
|
||
for pressing with a steam boiler, and, for Phase 5, permission for an
|
||
electroplating line ([galvanics and stamper prep](equipment/galvanics.md)).
|
||
|
||
## The three candidates
|
||
|
||
| | Mueang Chi, Lamphun | Northern Region Industrial Estate, Lamphun | Payap University land, Chiang Mai |
|
||
|---|---|---|---|
|
||
| Status | Working candidate: the massing model, PV roof design and [construction RFQ](finance/phase1-construction-rfq.md) are sited here | Fallback | New lead (October 2026): the university approached the project and is interested in leasing land to us |
|
||
| Lessor | Private owner | IEAT | Payap University (private, non-profit, founded by the Foundation of the Church of Christ in Thailand) |
|
||
| Plot | 5-0-66.5 rai, 18.4708 N, 98.9642 E, narrow and skewed | Leased estate plots | Not yet identified. The main (Mae Khao) campus is at 18.795 N, 99.033 E |
|
||
| Distance to Chiang Mai old city | ~35 km | Lamphun valley | ~5 km east, on the Chiang Mai–Lampang superhighway |
|
||
| Zoning for factory use | Unverified (agricultural land) | Industrial estate; licensing through the estate | Unverified |
|
||
| Galvanics effluent | Ours to permit; zero discharge | Shared central effluent treatment | Needs the lessor's consent on top of the permit |
|
||
| Neighbours | Agricultural | Industrial | A pharmaceutical facility under construction on the same land |
|
||
|
||
## Payap University (new lead, October 2026)
|
||
|
||
**What we know from the conversation:** Payap University is interested in
|
||
leasing land to the project, and a pharmaceutical facility is under
|
||
construction on the same land. The plot, its size, the title, the term and
|
||
the rent are not known yet.
|
||
|
||
**Public facts.** Payap's main campus, Mae Khao, is at 272 Moo 2, San
|
||
Phranet, San Sai district, on the Chiang Mai–Lampang superhighway. The
|
||
university bought it in 1974 as about 120 acres of low-lying land and has
|
||
since grown it to about 275 acres (~700 rai) with purchases across the ring
|
||
road (Payap's own history page). Its Faculty of Pharmacy put the
|
||
construction of a cosmetics production facility and co-working space out to
|
||
tender in July 2024, and the university has announced a centre for
|
||
producing active compounds from cannabis and medicinal plants by bioreactor
|
||
(RPAH) with an industry sponsor. Whether either of these is the
|
||
pharmaceutical facility on the offered land is to be confirmed.
|
||
|
||
**Why it is worth pursuing.**
|
||
|
||
- **Location.** About 5 km from the old city and 25 to 30 km nearer the
|
||
team, customers and the airport than Mueang Chi. The
|
||
[visitor corridor](crane-workshop-tours.md), the
|
||
[artist platform](artist-platform.md) and hiring all work better in town.
|
||
- **A partner, not only a landlord.** Payap also wants to build new
|
||
student programmes with us in audio engineering (mastering, lathe
|
||
cutting), IT and business administration; that strand has its own page,
|
||
[Payap partnership](payap-partnership.md). Its Faculty of Pharmacy has
|
||
analytical labs that could back the PVC material lab
|
||
([quality automation](quality-automation.md)), and a formal university
|
||
collaboration is the kind of R&D and skills cooperation the
|
||
[BOI](boi.md) merit measures reward; confirm which measure applies.
|
||
- **Production is already being built there.** If the pharmaceutical
|
||
facility has factory permission, the land may already have a path
|
||
through licensing and a medium-voltage supply nearby. Shared
|
||
infrastructure (MV connection, RO water, effluent treatment) is worth
|
||
asking about.
|
||
|
||
**What could rule it out** (check in this order, before any design work):
|
||
|
||
1. **Zoning.** The plot's colour in the Chiang Mai comprehensive city plan
|
||
and whether it allows a record-pressing factory with a steam boiler and,
|
||
later, electroplating. A pharmaceutical or cosmetics plant and an
|
||
electroplating line are different factory classes, so the neighbour's
|
||
permit proves little. Ask the provincial public works and town planning
|
||
office, as for Mueang Chi.
|
||
2. **Can the university lease to a company?** Title type (Chanote needed),
|
||
university council approval, and whether campus land of a private
|
||
higher-education institution carries restrictions on commercial leases.
|
||
This is a question for Thai counsel, together with the lease terms the
|
||
business plan already requires (registered 30-year lease with renewal,
|
||
building ownership, mortgageable).
|
||
3. **The pharmaceutical neighbour.** A GMP facility is sensitive to dust,
|
||
smoke and fumes. Ours: the boiler stack (biomass smoke next to a
|
||
pharmaceutical plant in town would be a hard sell, which favours
|
||
electric or LPG steam; see [biomass](biomass.md)), galvanics extraction,
|
||
PVC extrusion fumes, press noise and truck traffic. Agree emission and
|
||
buffer rules in the lease rather than after the first complaint.
|
||
4. **Flooding.** Payap describes the Mae Khao land as low-lying when bought.
|
||
Check the plot against the 2024 flood extents; the design's floor, 1.2 m
|
||
above ground for the loading docks, helps but is not a flood
|
||
assessment.
|
||
5. **Plot fit.** Shape and size against the 60 × 25 m building, the
|
||
detached utility yard and the phase 2 footprint (6 to 8 rai). The
|
||
Payap scenario model below fits the whole plant on a 110 m square
|
||
(7.6 rai) as drawn.
|
||
6. **Galvanics on a campus.** Phase 5 electroplating needs the lessor's
|
||
written consent; the zero-discharge design
|
||
([sustainability](sustainability.md)) becomes a lease condition, not
|
||
only a commitment.
|
||
|
||
**Questions for the next meeting with Payap:** which plot (map, size,
|
||
title deed number), its zoning and current use; what the pharmaceutical
|
||
facility is, who operates it and when it opens; what utilities it brings
|
||
(MV, water, wastewater); lease term, rent, renewal and building ownership;
|
||
what collaboration the university wants in return.
|
||
|
||
Nothing has been re-sited. The parametric model, PV roof study, RFQ and
|
||
the fleet site code `lpn` in the [digital factory](digital-factory.md)
|
||
stay on Mueang Chi until a Payap plot is known and has passed checks 1
|
||
and 2.
|
||
|
||
### Payap scenario model (October 2026)
|
||
|
||
To see the plant on Payap land before a plot is known, a separate
|
||
parametric BIM model sites it on a simple square plot:
|
||
[cnx_vinyl_parametric_payap.FCStd](cnx_vinyl_parametric_payap.FCStd)
|
||
(top view [PNG](cnx_vinyl_parametric_payap.png),
|
||
[isometric](cnx_vinyl_parametric_payap-iso.png)), built in FreeCAD 26.3
|
||
from BIM walls, slabs, columns, spaces and equipment. Every size and
|
||
position hangs off its `Params` spreadsheet (plot side, setbacks, floor
|
||
level, building sizes, fire wall line, office gap), so the square can be
|
||
swapped for the real plot once Payap names one. It is a layout sketch:
|
||
every position and every equipment envelope is an estimate.
|
||
|
||
- **Plot**: 110 × 110 m (12,100 m², 7.6 rai, inside the 6 to 8 rai of
|
||
[scale](scale.md)), road assumed on the south side, 6 m setbacks
|
||
(placeholder).
|
||
- **Factory, production floor only**: 84 × 25 m at floor level +1.2 m,
|
||
in process order along a 54 m glazed visitor corridor. From west to
|
||
east: staff entry and lockers; workshop and spares, with the machine
|
||
door and a 12 m vehicle ramp at the north-west corner; galvanics clean
|
||
room and water treatment; stamper prep, PVC lab and material area;
|
||
compressed air and electrical; the press hall; trim and optical
|
||
inspection, QC lab, and finishing and packaging. Behind the fire wall
|
||
at 62 m are the warehouse and dispatch with two dock doors.
|
||
- The press hall (465 m²) holds two Duplex systems, each two HRP 12
|
||
presses with an EX 50 and an EX 35, and the Classic
|
||
([pressing line](equipment/pressing-line.md)).
|
||
- The 5 t crane runs from the west wall to the fire wall
|
||
([crane, workshop and tours](crane-workshop-tours.md)).
|
||
- **Office building, isolated from the factory floor**: 24 × 15 m, single
|
||
storey, 12 m south of the factory on its own slab and structure, joined
|
||
by a covered link that lands at the start of the visitor corridor.
|
||
- It holds reception, offices, a meeting and training room (the
|
||
[Payap programmes](payap-partnership.md)), mastering and cutting with
|
||
an inner acoustic lining, the listening room, the IT and server room,
|
||
the archive, and WC and kitchen.
|
||
- The lathe sits away from press vibration and outside the crane zone.
|
||
- **Utility yard** behind the press hall, across a 6 m service lane:
|
||
- boiler house with chimney and a covered fuel store;
|
||
- chiller and cooling tower;
|
||
- process and fire water tanks;
|
||
- PEA transformer;
|
||
- a pipe bridge to the press hall.
|
||
|
||
Boiler and chiller are drawn at the one-Duplex sizes and need
|
||
re-sizing for five presses ([scale](scale.md)).
|
||
- **Access**: one gate on the south side opens onto a truck apron in front
|
||
of the dock doors, with the car park in front of the office and a
|
||
service road round the east end to the yard and the ramp.
|
||
- **Area**: about 2,100 m² of factory plus 360 m² of office, so ~2,460 m²
|
||
under roof. That is above the 1,400 to 2,000 m² of the [scale](scale.md)
|
||
zone table, which held one Duplex and an automated zone with the offices
|
||
inside.
|
||
- The press hall matches the new fleet.
|
||
- Warehouse and dispatch (~530 m²) are drawn above that table's 300 to
|
||
500 m² for packaging and finished goods.
|
||
|
||
Both are estimates to settle against the real plot.
|
||
|
||