User, 20 Oct 2026: the main investor W wants to hold at least 60 % of the company (the BOI-promoted company), so only 40 % is for sale. - total-investment.md "Two plans": the 60/40 rule; Ploy Printing's stake, founders' shares and any further co-investor come out of the 40 %; at Plan B's ~54M THB equity floor (3:1) and one share price that is at least ~32M / at most ~22M THB (arithmetic only; share price, valuation and in-kind shares not agreed). - README Project Status and boi.md (foreign-ownership privilege) point to it. - Business plan: section 12.2 states the split (A: ~28M / ~18M, B: ~32M / ~22M at the equity floor, arithmetic), the co-investment bullet and the decisions list name the 40 %; A and B rebuilt (63 pages each, TOC and em-dash check clean).
154 lines
8.5 KiB
Markdown
154 lines
8.5 KiB
Markdown
# BOI Investment Promotion
|
|
|
|
The project will apply for promotion by the Thailand Board of Investment.
|
|
Research snapshot from July 2026, based on the BOI Investment Promotion
|
|
Guide 2025/2026 and advisory sources; BOI revises its measures roughly
|
|
annually, so every scheme cited here must be reconfirmed at filing time.
|
|
The exact activity sub-code needs confirmation by a BOI-registered
|
|
consultant before the application.
|
|
|
|
## The strategic picture
|
|
|
|
Vinyl pressing is, in BOI terms, basic plastic consumer-goods manufacturing
|
|
(Category 6, chemicals/paper/plastics), which lands in **incentive Group B**:
|
|
no corporate income tax holiday on the core pressing activity, but the full
|
|
non-tax package and machinery duty exemption. The tax value is engineered on
|
|
top through the upgrade measures, where this project happens to be strong:
|
|
|
|
- **Solar: no longer promoted; the battery may be.** The alternative-energy
|
|
measure (Announcement 2/2568, April 2025, under the Smart and Sustainable
|
|
Industry framework) granted a CIT exemption on the solar investment,
|
|
capped at THB 12M/30M/40M per MW. **Announcement 3/2568** (5 June 2025,
|
|
in force 1 July 2025) ended promotion for installing solar power
|
|
generation under that measure for applications from 1 July 2025; what
|
|
remains is machinery modified to use other renewable energy, and battery
|
|
storage (BESS) with its inverters, the eligible investment capped at
|
|
THB 12M per MW
|
|
([B Global Law](https://bgloballaw.com/2026/01/18/boi-announcement-no-3-2568-amendment-to-renewable-energy-efficiency-enhancement-measures),
|
|
[Smarter Energy Solution](https://smarterenergysolution.com/blog/boi-solar-thailand-2026),
|
|
checked October 2026). So owning the ~520 kWp factory-roof array earns no BOI
|
|
benefit; its case is the bill (see [sustainability](sustainability.md)).
|
|
Whether the 271 kWh battery qualifies is for the BOI consultant. A PPA
|
|
developer selling solar power (200 kW or more per distribution point)
|
|
can still be promoted under activity 7.1.2 (8-year CIT exemption); that
|
|
benefit is the developer's, and how much of it reaches the PPA price is
|
|
a negotiation
|
|
([CapSolar](https://capsolar.co.th/en/knowledge/boi-solar-incentives-2026)).
|
|
- **Automation and metrology**: the Smart and Sustainable Industry upgrade
|
|
measure (Announcement 15/2565, refreshed July 2025) rewards automation,
|
|
smart machinery, and energy efficiency, typically 3 years of CIT
|
|
exemption capped around 50% of the qualifying upgrade investment. The
|
|
automated presses, inline optical inspection, and stamper metrology are
|
|
the natural fit.
|
|
- **R&D merit**: investing at least 1% of revenue in Thai R&D adds 1 to 3
|
|
CIT-exemption years and can lift the exemption cap. In-house mastering,
|
|
galvanics process development, and recycled-PVC work could be framed as
|
|
qualifying development.
|
|
|
|
So the application is pitched on automation and technology content (and
|
|
the battery, if it qualifies), not on "we press plastic discs."
|
|
|
|
## What Group B still delivers (the core value)
|
|
|
|
- **Machinery import duty exemption**: significant with the entire equipment
|
|
list imported (Germany, Sweden, USA, Japan). **Import VAT goes with it:**
|
|
machinery or raw material imported with the duty exemption is exempt
|
|
from VAT at import as well (Revenue Department answer on the
|
|
[BOI OSOS FAQ](https://osos.boi.go.th/One-Stop/faq-group/205/FAQ-about-VAT--BOI),
|
|
checked October 2026); otherwise a BOI company is treated like any other
|
|
for VAT. What it is worth: the capex blocks in
|
|
[total investment](finance/total-investment.md) are vendor prices
|
|
without duty or VAT, so they already assume promotion. Without it, the
|
|
~2.3M USD of imported machinery in the launch plant (presses, galvanics
|
|
line, Sibert, cutting room, metrology; block midpoints, as
|
|
[total investment](finance/total-investment.md#launch-plant-october-2026)
|
|
states it) would carry import duty, roughly 5 % (Thailand's MFN averages
|
|
4.1 % on HS 8477 plastics machinery, 0 to 10 % across HS 84; estimate
|
|
until the HS codes are set), ~0.11M USD, and 7 % import VAT, ~0.17M USD
|
|
paid at the border and only recovered later as input tax, mostly as a
|
|
refund claim because exports are zero-rated. The
|
|
[plant and business plan calculator](fleet-calculator.html) shows both
|
|
cases; its BOI switch also counts the water treatment (ZLD/DI) as
|
|
imported, ~2.5M USD at the midpoint (figures re-based October 2026; the
|
|
earlier ~2.75M was the superseded start fleet).
|
|
- **100% foreign ownership** of the promoted manufacturing company,
|
|
overriding Foreign Business Act restrictions for the promoted activity.
|
|
The intended split: the main investor holds at least 60 %, at most
|
|
40 % goes to co-investors (user, October 2026;
|
|
[total investment](finance/total-investment.md#two-plans-a-at-180m-thb-and-b-at-215m-thb-october-2026))
|
|
- **Land ownership** for the promoted operation despite foreign
|
|
shareholding, plus a small allowance for office/residential use; note the
|
|
privilege is tied to the promotion, which matters for the buy-vs-lease
|
|
decision
|
|
- **Visas and work permits** via the One Stop Service, without the usual
|
|
four-Thai-employees-per-permit rule; relevant for foreign commissioning
|
|
engineers and the technical consultant
|
|
- **Raw material duty relief**: exemption for export production (1 to 5
|
|
years, renewable) and up to 90% reduction for domestic-sale production
|
|
|
|
## Requirements
|
|
|
|
- Minimum investment THB 1,000,000 excluding land and working capital
|
|
(comfortably cleared by the first pressing line alone)
|
|
- Debt-to-equity ratio no higher than 3:1, maintained for the life of the
|
|
privileges; plan the equity/loan mix for the machinery and solar capex
|
|
accordingly
|
|
- Modern machinery and process expected; ISO/environmental compliance for
|
|
larger projects
|
|
- BOI promotion does not replace the factory license (Ror.Ngor. 4),
|
|
hazardous substance registration, or wastewater permitting; the galvanics
|
|
effluent is the most likely regulatory friction point regardless of BOI
|
|
status
|
|
|
|
## Regional angle: Northern Thailand
|
|
|
|
Chiang Mai, Lamphun, and Lampang sit in the **Northern Economic Corridor**,
|
|
which BOI promotes as a creative-economy base; a vinyl/music manufacturing
|
|
story fits that narrative. Locating in the **Northern Region Industrial
|
|
Estate in Lamphun** simplifies factory licensing and land questions and
|
|
provides shared central effluent treatment, which helps the galvanics
|
|
permitting. Legacy "Zone 3" incentive tables still found online are
|
|
outdated; the current area-based add-ons for Lamphun/Lampang must be
|
|
confirmed with BOI directly.
|
|
|
|
## Process and timeline
|
|
|
|
1. File via the BOI e-Investment system, then present the project at an
|
|
analyst meeting
|
|
2. Decision: about 40 working days for projects under THB 200M (60 to 90
|
|
working days for larger tiers); roughly 4 to 6 months end to end to the
|
|
promotion certificate in practice
|
|
3. Incorporate the company (if not yet done) and accept the certificate
|
|
4. Import machinery within the duty-exemption window, commonly 30 months
|
|
from certificate issuance (extendable); the Newbilt/Pheenix delivery
|
|
schedule must fit inside it
|
|
5. Reach full operation by the certificate deadline (typically about 36
|
|
months), with progress reporting, annual reports, machinery lists, and
|
|
the 3:1 debt-to-equity ratio maintained throughout
|
|
|
|
## Sequencing consequence
|
|
|
|
BOI approval comes **before** company incorporation is finalized and before
|
|
any machinery purchase orders: duty exemption does not apply retroactively
|
|
to equipment already imported, and the certificate defines the import
|
|
window. The BOI application is therefore a dependency at the top of the
|
|
project timeline, ahead of equipment contracts.
|
|
|
|
## Open items
|
|
|
|
- Confirm the exact activity sub-code and tier for vinyl/PVC consumer-goods
|
|
pressing (Group B assumption is well supported but not code-verified)
|
|
- Confirm the live version of the smart-and-sustainable measures at
|
|
filing time, and whether the battery qualifies under the BESS part of
|
|
the alternative-energy measure (THB 12M per MW cap); solar itself is out
|
|
since 1 July 2025 (Announcement 3/2568)
|
|
- Confirm current NEC/Lamphun area add-ons
|
|
- Engage a BOI-registered consultant to structure the application so the
|
|
automation and R&D measures (and the battery) stack on the base promotion
|
|
- Check whether R&D contracted with Payap University and the joint student
|
|
programmes ([Payap partnership](payap-partnership.md)) count toward the
|
|
R&D merit or a skills-development measure
|
|
- Keep any future label/content/retail arm in a separate entity: media and
|
|
service activities carry different (and sometimes Thai-ownership)
|
|
conditions, and mixing them muddies a clean manufacturing application
|