User, October 2026: add the guard house and the gate; the truck apron is far too big. Model (changed live in FreeCAD 26.3): - main gate as in the phase 1 RFQ: piers and two 5 m sliding leaves (shown open, parked inside the wall), 10 m clear (gate_width 8 -> 10 m); - guard house as in the RFQ: 4 x 3 m (guard room 8.4 m2 + WC 3.6 m2), window wall to the gate, guard desk, on the gate's north-west side; - boom barrier just inside the gate (cars and trucks both pass it); - truck paving: the 42 x 101 m apron (~4,240 m2) replaced by an 8 m gate road (550 m2) and a 32 m deep apron and dock face (1,600 m2) that joins the east service road; new params apron_depth, road_w. Docs: site-candidates Access bullet (~2,150 m2 heavy-duty paving against 1,608 m2 in the Mueang Chi RFQ).
251 lines
14 KiB
Markdown
251 lines
14 KiB
Markdown
# Site Candidates
|
||
|
||
The site strategy is a long lease of raw land on which the purpose-built
|
||
plant is constructed (business plan section 6.1, built from
|
||
`business-plan/build/`). What any site has to offer is unchanged: ~4 rai
|
||
minimum and 6 to 8 rai with expansion, truck access and turning, room for
|
||
the cooling tower and a separated battery enclosure, a 500 to 1,000 kVA
|
||
medium-voltage connection, a slab rated 3 t/m² and a frame able to carry
|
||
the overhead crane ([scale](scale.md),
|
||
[crane, workshop and tours](crane-workshop-tours.md)), factory permission
|
||
for pressing with a steam boiler, and, for Phase 5, permission for an
|
||
electroplating line ([galvanics and stamper prep](equipment/galvanics.md)).
|
||
|
||
## The three candidates
|
||
|
||
| | Mueang Chi, Lamphun | Northern Region Industrial Estate, Lamphun | Payap University land, Chiang Mai |
|
||
|---|---|---|---|
|
||
| Status | Working candidate: the massing model, PV roof design and [construction RFQ](finance/phase1-construction-rfq.md) are sited here | Fallback | New lead (October 2026): the university approached the project and is interested in leasing land to us |
|
||
| Lessor | Private owner | IEAT | Payap University (private, non-profit, founded by the Foundation of the Church of Christ in Thailand) |
|
||
| Plot | 5-0-66.5 rai, 18.4708 N, 98.9642 E, narrow and skewed | Leased estate plots | Not yet identified. The main (Mae Khao) campus is at 18.795 N, 99.033 E |
|
||
| Distance to Chiang Mai old city | ~35 km | Lamphun valley | ~5 km east, on the Chiang Mai–Lampang superhighway |
|
||
| Zoning for factory use | Unverified (agricultural land) | Industrial estate; licensing through the estate | Unverified |
|
||
| Galvanics effluent | Ours to permit; zero discharge | Shared central effluent treatment | Needs the lessor's consent on top of the permit |
|
||
| Neighbours | Agricultural | Industrial | A pharmaceutical facility under construction on the same land |
|
||
|
||
## Payap University (new lead, October 2026)
|
||
|
||
**What we know from the conversation:** Payap University is interested in
|
||
leasing land to the project, and a pharmaceutical facility is under
|
||
construction on the same land. The plot, its size, the title, the term and
|
||
the rent are not known yet.
|
||
|
||
**Public facts.** Payap's main campus, Mae Khao, is at 272 Moo 2, San
|
||
Phranet, San Sai district, on the Chiang Mai–Lampang superhighway. The
|
||
university bought it in 1974 as about 120 acres of low-lying land and has
|
||
since grown it to about 275 acres (~700 rai) with purchases across the ring
|
||
road (Payap's own history page). Its Faculty of Pharmacy put the
|
||
construction of a cosmetics production facility and co-working space out to
|
||
tender in July 2024, and the university has announced a centre for
|
||
producing active compounds from cannabis and medicinal plants by bioreactor
|
||
(RPAH) with an industry sponsor. Whether either of these is the
|
||
pharmaceutical facility on the offered land is to be confirmed.
|
||
|
||
**Why it is worth pursuing.**
|
||
|
||
- **Location.** About 5 km from the old city and 25 to 30 km nearer the
|
||
team, customers and the airport than Mueang Chi. The
|
||
[visitor corridor](crane-workshop-tours.md), the
|
||
[artist platform](artist-platform.md) and hiring all work better in town.
|
||
- **A partner, not only a landlord.** Payap also wants to build new
|
||
student programmes with us in audio engineering (mastering, lathe
|
||
cutting), IT and business administration; that strand has its own page,
|
||
[Payap partnership](payap-partnership.md). Its Faculty of Pharmacy has
|
||
analytical labs that could back the PVC material lab
|
||
([quality automation](quality-automation.md)), and a formal university
|
||
collaboration is the kind of R&D and skills cooperation the
|
||
[BOI](boi.md) merit measures reward; confirm which measure applies.
|
||
- **Production is already being built there.** If the pharmaceutical
|
||
facility has factory permission, the land may already have a path
|
||
through licensing and a medium-voltage supply nearby. Shared
|
||
infrastructure (MV connection, RO water, effluent treatment) is worth
|
||
asking about.
|
||
|
||
**What could rule it out** (check in this order, before any design work):
|
||
|
||
1. **Zoning.** The plot's colour in the Chiang Mai comprehensive city plan
|
||
and whether it allows a record-pressing factory with a steam boiler and,
|
||
later, electroplating. A pharmaceutical or cosmetics plant and an
|
||
electroplating line are different factory classes, so the neighbour's
|
||
permit proves little. Ask the provincial public works and town planning
|
||
office, as for Mueang Chi.
|
||
2. **Can the university lease to a company?** Title type (Chanote needed),
|
||
university council approval, and whether campus land of a private
|
||
higher-education institution carries restrictions on commercial leases.
|
||
This is a question for Thai counsel, together with the lease terms the
|
||
business plan already requires (registered 30-year lease with renewal,
|
||
building ownership, mortgageable).
|
||
3. **The pharmaceutical neighbour.** A GMP facility is sensitive to dust,
|
||
smoke and fumes. Ours: the boiler stack (biomass smoke next to a
|
||
pharmaceutical plant in town would be a hard sell, which favours
|
||
electric or LPG steam; see [biomass](biomass.md)), galvanics extraction,
|
||
PVC extrusion fumes, press noise and truck traffic. Agree emission and
|
||
buffer rules in the lease rather than after the first complaint.
|
||
4. **Flooding.** Payap describes the Mae Khao land as low-lying when bought.
|
||
Check the plot against the 2024 flood extents; the design's floor, 1.2 m
|
||
above ground for the loading docks, helps but is not a flood
|
||
assessment.
|
||
5. **Plot fit.** Shape and size against the 60 × 25 m building, the
|
||
detached utility yard and the phase 2 footprint (6 to 8 rai). The
|
||
Payap scenario model below needs a 150 m square (14.1 rai) as drawn,
|
||
with room for ten more Classics, a colour store and a reserve.
|
||
6. **Galvanics on a campus.** Phase 5 electroplating needs the lessor's
|
||
written consent; the zero-discharge design
|
||
([sustainability](sustainability.md)) becomes a lease condition, not
|
||
only a commitment.
|
||
|
||
**Questions for the next meeting with Payap:** which plot (map, size,
|
||
title deed number), its zoning and current use; what the pharmaceutical
|
||
facility is, who operates it and when it opens; what utilities it brings
|
||
(MV, water, wastewater); lease term, rent, renewal and building ownership;
|
||
what collaboration the university wants in return.
|
||
|
||
Nothing has been re-sited. The parametric model, PV roof study, RFQ and
|
||
the fleet site code `lpn` in the [digital factory](digital-factory.md)
|
||
stay on Mueang Chi until a Payap plot is known and has passed checks 1
|
||
and 2.
|
||
|
||
### Payap scenario model (October 2026)
|
||
|
||
To see the plant on Payap land before a plot is known, a separate
|
||
parametric BIM model sites it on a simple square plot:
|
||
[cnx_vinyl_parametric_payap.FCStd](cnx_vinyl_parametric_payap.FCStd)
|
||
(top view [PNG](cnx_vinyl_parametric_payap.png),
|
||
[isometric](cnx_vinyl_parametric_payap-iso.png)), built in FreeCAD 26.3
|
||
from BIM walls, slabs, columns, stairs, spaces and equipment. Every size
|
||
and position hangs off its `Params` spreadsheet (plot side, setbacks,
|
||
floor level, building sizes, fire wall and crane lines, upper floor
|
||
level, office and water treatment gaps), so the square can be swapped for
|
||
the real plot once Payap names one. It is a layout sketch: every position
|
||
and every equipment envelope is an estimate.
|
||
|
||
- **Plot**: 150 × 150 m (22,500 m², 14.1 rai), road assumed on the south
|
||
side, 6 m setbacks (placeholder). That is about twice the 6 to 8 rai of
|
||
[scale](scale.md): the factory keeps room for ten more Classics and a
|
||
colour store, and the plot keeps a reserve in front for a second hall
|
||
or a PV field.
|
||
- **Factory, production floor only**: 128 × 25 m at floor level +1.2 m,
|
||
16 frame bays, in process order along a 98 m glazed visitor corridor.
|
||
From west to east:
|
||
- staff entry (PPE, WC);
|
||
- workshop and spares, with the machine door and a 12 m vehicle ramp
|
||
at the north-west corner;
|
||
- the galvanics clean room with a chemical day store, open to stamper
|
||
prep (no wall between them);
|
||
- PVC lab, regrind and conveying, the electrical room;
|
||
- the colour store;
|
||
- the press hall;
|
||
- the two-storey finishing and print block;
|
||
- behind the fire wall at 106 m, the warehouse and dispatch with two
|
||
dock doors.
|
||
|
||
Inside it:
|
||
- **Colour store** (~180 m²): pallet racking for the tens of colours
|
||
that special designs need, about 100 positions on four levels
|
||
(estimate), with weighing and mixing and a vacuum conveying station
|
||
([pressing line](equipment/pressing-line.md)).
|
||
- **Press hall** (~870 m²): two Duplex systems, each two HRP 12 presses
|
||
with an EX 50 and an EX 35, the Classic, and ten more Classic
|
||
positions in two rows. Each Duplex is one operator's cell of about
|
||
5 × 3 m at Newbilt's machine sizes: presses either side turned
|
||
towards the operator, the extruders behind him, one trimmer in front
|
||
([pressing line](equipment/pressing-line.md)).
|
||
- **One shared hydraulic and compressed-air supply**: a central plant
|
||
room (~62 m²) at the west end of the press hall, and a service trench
|
||
along the press rows for the hydraulic ring main, compressed air,
|
||
steam and cooling water.
|
||
- **Finishing and print block**, 14 × 25 m on two levels, beyond the
|
||
end of the crane runway
|
||
([plans](cnx_vinyl_parametric_payap-block.png)).
|
||
- Ground floor: trim and optical inspection, the QC lab, and
|
||
packaging (~170 m²) with packing tables, shrink wrap and a pallet
|
||
wrapper next to the fire shutter into the warehouse.
|
||
- Upper floor at +3.8 m: a print room kept in reserve (in-house
|
||
printing is not decided; jackets come from a print partner today,
|
||
[production timeline](production-timeline.md)), the print stock
|
||
(paper, board) and the packaging materials (sleeves, inner bags,
|
||
mailers, cartons).
|
||
- A stair and a goods lift connect the floors. Heavy compound stays
|
||
on the ground floor.
|
||
- The workshop (~200 m²) is fully equipped, with 3D printers, a lathe
|
||
and a small CNC mill among the tools
|
||
([crane, workshop and tours](crane-workshop-tours.md)).
|
||
- The 5 t crane runs from the west wall to the end of the press hall.
|
||
- **PVC silos** (proposed), outside on the north side of the lane:
|
||
- two for black, two for standard colours, ~50 m³ each (estimate);
|
||
- a big-bag filling station;
|
||
- buried conveying lines to the colour store.
|
||
- **Water treatment building**, separate, 12 × 10 m at ground level
|
||
directly behind galvanics: zero-discharge effluent treatment, the DI
|
||
water plant and the chemical store. A buried duct carries the effluent
|
||
by gravity from the galvanics floor, and a covered crossing (6 m clear
|
||
for trucks) joins the galvanics door
|
||
([galvanics](equipment/galvanics.md)).
|
||
- **Office building, isolated from the factory floor**: 32 × 15 m on two
|
||
storeys, ~960 m² of floor
|
||
([floor plans](cnx_vinyl_parametric_payap-office.png)). It stands 12 m
|
||
south of the factory on its own slab and structure, joined by a covered
|
||
link that lands at the start of the visitor corridor. A stair and a lift
|
||
connect the floors.
|
||
- Ground floor, for staff and the studio: reception and lobby, a canteen
|
||
for about 40 with its kitchen, changing rooms for women and men with
|
||
four showers each, toilets, mastering and cutting with an inner
|
||
acoustic lining, the listening room and the archive. Staff change here
|
||
before crossing to the factory, whose staff entry keeps only PPE and a
|
||
WC.
|
||
- First floor: the offices (~150 m²), a meeting and training room (the
|
||
[Payap programmes](payap-partnership.md)), a meeting room, the IT and
|
||
server room, toilets, a pantry, and a flexible room for a second
|
||
classroom or more offices.
|
||
- The lathe sits on the ground slab, away from press vibration and
|
||
outside the crane zone.
|
||
- **Utility yard** behind the press hall, across a 6 m lane:
|
||
- boiler house with chimney and a covered fuel store;
|
||
- chiller and cooling tower;
|
||
- a raw water tank (5 m × 3 m, as in the phase 1 RFQ);
|
||
- PEA transformer;
|
||
- a pipe bridge that drops into the service trench.
|
||
|
||
Boiler, chiller and transformer are drawn at the one-Duplex sizes. They
|
||
need re-sizing for five presses, and again if the Classics are added
|
||
([scale](scale.md)).
|
||
- **Fire water** at the front, reachable from the frontage without
|
||
entering the production yard
|
||
([facility security](facility-security.md#fire-water-supply)): a
|
||
9 m × 4 m tank (~200 m³ usable, planning figure) on a ring foundation,
|
||
with a pump house for the duty (electric), standby (diesel) and jockey
|
||
pumps. The model's 6 m warehouse racking and its larger buildings will
|
||
raise the volume; the hydraulic design sets it.
|
||
- **Access**:
|
||
- one main gate on the south side, as in the
|
||
[phase 1 RFQ](finance/phase1-construction-rfq.md): piers and two 5 m
|
||
sliding leaves, 10 m clear;
|
||
- the guard house beside it on the gate's north-west side, 4 × 3 m with
|
||
a WC and air conditioning, and a boom barrier just inside the gate
|
||
that car and truck traffic both pass;
|
||
- an 8 m gate road to a truck apron and dock face in front of the dock
|
||
doors. The apron is 32 m deep, about twice the 16.5 m of an
|
||
articulated truck reversing to a dock (estimate), and joins the
|
||
service road round the east end. That makes ~2,150 m² of heavy-duty
|
||
paving, against 1,608 m² for apron, dock face and internal road in
|
||
the Mueang Chi RFQ;
|
||
- an access road runs along the south boundary to the car park, with
|
||
a footpath to the office;
|
||
- a lane behind the factory serves the yard, the silos, the water
|
||
treatment building and the ramp. The low-loader's swept path at the
|
||
ramp still needs checking.
|
||
- **Area**: about 3,200 m² of factory plus a 350 m² upper floor, a 480 m²
|
||
office footprint (~960 m² on two floors) and 120 m² of water treatment:
|
||
~3,800 m² under roof plus the boiler house, and ~4,630 m² of floor.
|
||
That is about twice the 1,400 to 2,000 m² of the [scale](scale.md) zone
|
||
table, which held one Duplex and an automated zone with the offices
|
||
inside.
|
||
- Most of the difference is the press hall with its expansion floor,
|
||
the colour store and the finishing and print block.
|
||
- Warehouse and dispatch (~530 m²) are drawn above that table's 300 to
|
||
500 m² for packaging and finished goods.
|
||
|
||
All of it is an estimate to settle against the real plot.
|
||
|
||
The Mueang Chi model and everything sited on it stay as they are.
|