# Facility: Security and Site Systems
What the plant needs beyond the production machinery. Access control, CCTV,
and whole-factory HVAC control are set requirements; the rest of this list
is what a plant of this profile definitely needs, to be refined during site
design.
## Climate control: whole-factory HVAC
The entire factory runs under continuous HVAC control, covering temperature,
humidity, and particulate matter (PM). This is a set requirement, not an
option per room.
- **Temperature and humidity**: the process spec already demands 20-26 °C at
35-60% relative humidity for pressing; the same conditioning extends to
the whole building so materials, masters, packaging stock, and electronics
never sit outside controlled conditions. PVC compound and paper packaging
are both humidity-sensitive.
- **Particulate matter**: filtration for the whole plant, with stricter
tiers by zone. Dust in a groove is an audible defect, so the cutting room
and galvanics clean room run at the tightest spec with positive pressure;
pressing and packaging run cleaner than ambient; offices and logistics at
a baseline tier. Northern Thailand's burning season (roughly February to
April) brings some of the world's worst PM2.5 episodes, so intake
filtration and building tightness must be designed for those peaks, not
for average days.
- **Continuous monitoring and alarms**: temperature, humidity, and PM
sensors logging in every zone, with alarms on excursions, tied into the
plant monitoring below.
- **Energy design**: conditioning a whole factory in a tropical climate is
a major electrical load on top of the 250 kW process cooling, and it must
be included in the solar PV and battery sizing from the start. Heat
recovery from the press hall (steam, hydraulics, and hot PVC all reject
heat) and from compressors should feed the design rather than fight it.
## Physical security
- **Access control**: zoned, not just at the gate. Minimum zones: general
production, galvanics clean room (controlled access is already a safety
requirement), chemical storage, master/stamper archive, server/IT room,
finished goods and shipping. Badge or biometric, with logs.
- **CCTV**: entrances, perimeter, loading dock, production floor, chemical
storage, archive. Retention policy to be defined; Thai PDPA (personal data
protection) applies to camera footage of staff and visitors.
- **Intrusion alarm** with monitoring, covering off-hours.
- **Perimeter and lighting**: fencing appropriate to the site, lit
approaches and parking.
- **Visitor management**: sign-in, escort rules, PPE issue at entry, no
unaccompanied access to production or galvanics.
## Protecting the irreplaceable
- **Master and stamper archive**: fathers and mothers are unique metal
parts; a destroyed father can mean re-cutting and re-plating a release.
The archive room needs fire-rated construction or safes, climate control,
access logging, and an off-site strategy for the most critical masters.
- **Client audio**: pre-release music is a high-value leak target, and
labels ask about it before they send masters. Isolated storage for client
files, encrypted transfer and at-rest storage, strict need-to-know access,
and a written policy the sales team can show clients.
- **Chemical inventory**: silver nitrate is valuable and regulated; nickel
salts are hazardous. Locked storage, inventory tracking, and controlled
issue to the galvanics team.
## Fire and life safety
- **Fire detection and alarm** throughout; suppression matched to each zone
(hot PVC and hydraulic oil in pressing, chemistry in galvanics, paper and
cartons in packaging/finished goods, and the boiler room).
- **Boiler room safety**: the steam generator (10 bar, 180 °C) needs its own
room, safety valves and interlocks, and inspection per Thai boiler
regulations (Department of Industrial Works requirements, licensed boiler
operator).
- **Emergency equipment in galvanics**: eyewash stations and emergency
shower at the plating line, spill kits, and neutralizing agents.
- **Emergency lighting, marked exits, assembly point**, and first-aid
coverage on every shift.
## Plant systems and monitoring
- **Utility monitoring and interlocks**: fume-extraction interlocks on the
galvanics line (no extraction, no plating), steam and compressed-air
pressure monitoring, leak detection, and safe-shutdown sequences.
- **UPS and controlled shutdown** for the IT room, access control, alarms,
and the press PLCs (a power cut mid-cycle should never leave a press in an
unsafe state; the battery stack can carry critical loads).
- **Lightning protection and grounding**: northern Thailand has intense
storm seasons; the PV array, steel structures, and electronics all need a
proper LPS and earthing design.
- **Environmental monitoring**: the whole-factory HVAC monitoring above
(temperature, humidity, PM in every zone), with the archive and clean room
as the most tightly alarmed spaces.
## Compliance anchors (Thailand)
- Factory license (Ror.Ngor. 4) and Department of Industrial Works
requirements for the machinery classes and chemical quantities involved
- Boiler registration and licensed operator requirements
- Hazardous substance registration for the plating chemistry
- PDPA compliance for CCTV and personnel data
- Local fire codes and building permits during construction
All of this belongs in the site design brief, so contractors quote it from
day one rather than retrofitting it.