Files
cnx_vinyl/docs/finance/utilities-investment.csv
T
grabowski 655d5705c4 Supplier: LPI Rack Range (Thailand), racking and mobile shelving
Added at the user's request (October 2026): LPI Rack Range (Thailand)
Corp., Ltd., Bangkok head office, plants in Bangplee Industrial Estate
and Bangpla (Samut Prakan); office mobile shelving for documents, pallet
racking (selective, drive-in, mobile, shuttle, pallet flow), picking
shelves and mezzanines, mould-and-die racking, mini-load AS/RS; no specs
or prices published (lpi.co.th, checked October 2026).

equipment-suppliers.md section 8 entry; the Thai supplier the archive
shelving is quoted against (facility-security.md open points, supplier
map archive line); racking candidate in the utilities CSV.
2026-10-16 11:25:15 +07:00

6.1 KiB

1categoryitemspec_summarycandidate_thai_supplierscost_low_thbcost_high_thbcost_basisnotes
2steamElectric/gas once-through boiler bank2 x 500 kg/h modules at 10.5 bar / 180 C, lead/lag, shared feed tank, feed pumps, economizer, installedMiura Thailand (Chachoengsao); Bangkok Industrial Boilers; STE Thailand45000007000000engineering estimateFive-press fleet 750-900 kg/h (steam-cooling.html); B-1 with the launch press, B-2 with Duplex 2; a third module for N+1 is an RFQ option; Miura-class modular once-through; service is Bangkok-centric, confirm northern dispatch SLA
3steamBiomass/wood-fired boiler package (option)~1 t/h solid fuel (wood chips/pellets/rice husk) incl. fuel feed, grate, dust control, softener, installedGetabec PCL (Thai fabrication and service)600000010000000engineering estimateSized for the five-press fleet (was ~0.5 t/h for one Duplex); sustainability path matching Deepgrooves NL precedent; higher capex, lower fuel opex in the North; NOT included in baseline total
4steamSteam balance of plantTraps, accumulator, condensate returnForbes Marshall Thailand00includedLargely included in boiler package rows; line kept for RFQ completeness
5compressed_airScrew compressor skid (oil-injected)~7.5 kW VSD screw + refrigerated dryer (3 C PDP) + coalescing filters + ~500 L receiver, installedAtlas Copco Thailand; Kaeser Thailand (SM-T/Aircenter); Ingersoll Rand Thailand350000600000engineering estimate14-30 m3/h demand is small (5-10 hp class); oil-injected + filter train meets 5 micron / 3 C spec
6compressed_airTrue oil-free class-0 (option)Same duty in oil-free class-0Atlas Copco (ZR/ZT); Kaeser12000001800000engineering estimateOnly if air contacts product stream; NOT included in baseline total
7coolingProcess chiller bank 3 x 250 kW3 x ~71 RT air-cooled screw/scroll chillers rated at 40 C ambient + primary pumps + plate HX + warm and cold tanks + VFD supply pumps + controls, installedTrane Thailand; Carrier Thailand; Daikin Applied Thailand; Hitachi Thailand650000010500000engineering estimateFive-press fleet up to ~650 kW and 305-540 l/min (Newbilt site requirements, 20-25 C supply); one module per press stage; 3 x 350 kW for N+1 as the alternative (steam-cooling.html)
8coolingCooling tower + HX loop (alternative)Dry cooler or FRP tower ~650-750 kW reject + plate HX + pumps + tanks + water treatmentLiang Chi Thailand (tower, large service org); Process Cooling Solutions; Tasaki (integrators)20000003500000engineering estimateCheaper capex but wet-bulb-limited; hybrid tower + trim chiller is the efficiency-optimal design; NOT included in baseline total
9waterBoiler feedwater duplex softener~1.0-1.2 m3/h feedwater duty (five-press boiler bank)Veolia Water Technologies Thailand; Hydrotek; local RO/softener integrators120000300000market estimateMay suffice alone for a small fire-tube boiler
10waterRO skid (option)0.5-1 m3/h low-TDS feedVeolia; Hydrotek; local integrators200000500000market estimateOnly if low-TDS feed needed; NOT included in baseline total
11waterClosed-loop cooling water treatmentSide-stream filtration + dosing + conductivity blowdown controlVeolia; Hydrotek; local integrators200000500000engineering estimateSized for the five-press loop with its open return tank (Newbilt press outlets are open, max. 2 bar); chemicals are ongoing opex on top
12waterGalvanics ZLD evaporator (future)Small MVR or low-temp vacuum evaporator for plating rinse, installedCore unit imported (WTEYA, Greenlan, Fred); Thai integration via Veolia or Hydrotek30000008000000market estimateFor the future galvanics line, zero-discharge requirement; NOT included in baseline total
13storagePallet racking and shelving100-200 pallet positions selective/heavy-duty (beams sized 1000-1500 kg/pallet, records are dense) + archive and finished-goods shelving, installedJenbunjerd; LPI Rack Range (Thailand), Bangkok/Samut Prakan, racking and office mobile shelving; local fabricators (Sahawatthanakit, UPR, SD Shelf); SSI Schaefer (premium)8000001500000published list prices + engineering estimateSSI Schaefer premium tier ~1.5-3M for same scope; ~1000-2000 THB per pallet position at local tier
14hvacWhole-factory HVAC~1500 m2 at 20-26 C, 35-60% RH, ePM1/F7-F9 filtration sized for burning-season PM2.5, ducting and controlsDaikin Thailand; Trane; Mitsubishi Electric; Carrier; filtration: Camfil Thailand, AAF750000015000000engineering estimate at 5000-10000 THB/m2RH low end of 35% is aggressive for tropics and drives desiccant cost; if 45-60% RH acceptable, cost drops materially
15hvacClean-room-grade zone adderCutting room + galvanics clean room, ~2 x 60 m2, ISO 7/8 with HEPA terminals, positive pressure, airlocksSame HVAC vendors + clean-room contractors; Camfil HEPA12000003400000engineering estimate at 10000-28000 THB/m2 adderApplied only to the two tight zones
16solarPV rooftop EPC (illustrative 300 kWp)Turnkey C&I rooftop EPC incl. Deye hybrid inverters, at 25000-35000 THB/kWpSolar Nicolo (Deye tier-1 distributor); Banpu NEXT; SCG Cleanergy; Sermsang; local Chiang Mai installers750000010500000market rate per kWp; size illustrativeFinal kWp open until site selection; PEA TOU 3.2.2 plus Ft (Sep-Dec 2026): self-consumed PV worth ~3.7 THB/kWh, ~4.5-7 yr payback (sustainability.md, grid tariff)
17solarBattery stack 271 kWh (Gobel)GP-SRA-HV314 HV LiFePO4 rack, 15 x 18 kWh packs, direct from Shenzhen, 50-60 day leadGobel Power (no Thai distributor; integration by solar EPC)14000002030000vendor listed price USD 39900-58000 at ~35 THB/USDConfirm Deye BMS protocol compatibility and that the EPC warrants a mixed-vendor DC bus; certs (UN38.3/IEC 62619/CE) to be requested
18totalBASELINE TOTALElectric steam bank + oil-injected air + chiller bank + softener + loop treatment + local racking + HVAC + clean zones + 300 kWp solar + 271 kWh BESS3007000051330000sum of baseline rowsFive-press fleet (October 2026; was 23.98M-41.63M THB for one Duplex); ~790k-1350k EUR at 38 THB/EUR; excludes options rows (biomass premium, oil-free, tower alternative, RO, ZLD evaporator, SSI premium tier); all figures budgetary +/- 30%, get RFQs before BOI/finance filings