diff --git a/README.md b/README.md index ec807fc..6cf8ea8 100644 --- a/README.md +++ b/README.md @@ -111,6 +111,11 @@ The detail lives in dedicated documents: end, and a glazed ground-level corridor for guided tours without noise, dust or plating chemistry; what each changes in the building and what it costs +- [Production hall layout sketch](docs/production-hall-layout-sketch.png): + a rough BIM sketch in FreeCAD (`docs/production-hall-layout-sketch.FCStd`) + of the 60 x 25 m phase 1 hall: zones in process order along the visitor + corridor, the crane zone, room-in-room boxes and the main equipment; every + position is an estimate - [Process logging and traceability](docs/traceability.md): end-to-end per-order traceability for customers, batch genealogy from audio file to shipment, and the requirements this sets for the factory software @@ -211,6 +216,8 @@ docs/ ├── payap-partnership.md Joint student programmes with Payap University ├── plant-operation.html Animated plant overview (simulated SCADA) ├── process-flow.md Audio file to delivered record, with all checks +├── production-hall-layout-sketch.FCStd Rough BIM layout sketch of the hall +├── production-hall-layout-sketch.png Top view of the sketch ├── production-timeline.md Order turnaround, stage by stage ├── project-timeline.md Calendar to first paying release, critical path ├── quality-automation.md Stamper metrology and layered record QC diff --git a/docs/crane-workshop-tours.md b/docs/crane-workshop-tours.md index ee0e4ef..f329110 100644 --- a/docs/crane-workshop-tours.md +++ b/docs/crane-workshop-tours.md @@ -285,6 +285,18 @@ window or not at all. The concept drawing and the detached utility yard and does not yet follow this order; it needs redrawing at the next layout pass. +A first rough pass that does follow it is the BIM sketch +[production-hall-layout-sketch.FCStd](production-hall-layout-sketch.FCStd) +(top view: [PNG](production-hall-layout-sketch.png), October 2026): ramp +end with machine door, workshop and spares; then mastering, galvanics, +stamper prep, PVC lab and material area, the press hall, inspection, QC +and packaging along the corridor; the fire wall at 48 m and the warehouse +and dispatch at the dock end, with a 4.5 m crane and forklift aisle along +the back wall from the machine door to the fire wall. It shows one +conflict to resolve: with the workshop at the ramp end, reception and the +cutting room sit under the bridge's travel too, against point 6 above +(cutting room outside the crane zone). + ### How it is built - **Room-in-room**: a glazed wall on the production side, a solid roof at diff --git a/docs/production-hall-layout-sketch.FCStd b/docs/production-hall-layout-sketch.FCStd new file mode 100644 index 0000000..6949bfa Binary files /dev/null and b/docs/production-hall-layout-sketch.FCStd differ diff --git a/docs/production-hall-layout-sketch.png b/docs/production-hall-layout-sketch.png new file mode 100644 index 0000000..4514c15 Binary files /dev/null and b/docs/production-hall-layout-sketch.png differ