Biomass: reported northern fuel prices (October 2026)

No public price index exists; DEDE lists buyers, not prices. Reported
market prices: fresh chips 1,350-1,800 THB/t (LH Bank, Mar 2026),
rubberwood firewood >1 THB/kg farm gate (OIE RIU 2026, doubled since late
2025), corn residue 2 THB/kg (Sunsweet, Mae Chaem), rice husk ~1.5 THB/kg,
pellets 3,000-5,000 THB/t. Planning price 1.35-2 THB/kg delivered, so the
mature fuel bill is ~0.6M-1.2M THB/yr (was 0.35M-0.8M): still a quarter
to a tenth of electric steam. Prices follow diesel; Ratch Pathana's Pa Sak
(Lamphun) buying centre is the local price-setter. Sources filed under
docs/finance/biomass/; sustainability.md and README follow.
This commit is contained in:
grabowski committed 2026-10-07 10:08:54 +02:00
1 parent 9640a4f075
commit 47e5f9e458
5 files changed
+79 -18

No files matched your search

+64 -5
View File
@@ -18,6 +18,9 @@ recovery architecture trimming the load and realistic duty cycles:
efficiency and ~4 kWh/kg air-dry wood)
- Early operations (one press line, single shift): roughly a quarter of
that, **~90 to 100 t/yr**
- Bought as fresh wood chips (~45 % moisture, ~2.6 kWh/kg) the same heat
is **~540 to 620 t/yr**, which is what the fuel store and the monsoon
stock have to be sized for (estimate)
## The 60 rai: own-grown fuelwood
@@ -32,7 +35,9 @@ about **80 to 135 t/yr**:
That makes the land a meaningful supplement and a strong brand story
("records pressed with steam from our own trees"), not a complete fuel
supply.
supply. At the market prices below, 80 to 135 t of air-dry wood is worth
only ~0.1M to 0.25M THB a year (estimate): the land's value is supply
security and the story, not the fuel bill.
### The classification check comes first
@@ -62,6 +67,60 @@ The region fills the remainder easily and cheaply:
- Buying from local farmers also strengthens the local-sourcing story that
already runs through packaging and PVC
## Fuel prices (market check, October 2026)
There is no public price index for biomass fuel in northern Thailand. DEDE
publishes lists of buyers and sellers (February 2026: 42 registered buyers
wanting 2.09M t a year), not prices, so the figures below are reported
market prices from bank research, a government industry unit and the
press, all checked 7 October 2026. None is a quote to this plant.
| Fuel | Reported price | Source | Heat cost (estimate) |
|---|---|---|---|
| Wood chips, fresh (45 to 50 % moisture) | 1,350 to 1,800 THB/t delivered | [LH Bank Research, wood pellet outlook](finance/biomass/LHBank_Wood_Pellets_Industry_Outlook_2026-03.pdf), 9 March 2026: 1,700 to 1,800 THB per fresh tonne for export; a power-plant chip quota in Nakhon Ratchasima at 1,350 THB/t, at most 45 % moisture (undated trader post) | ~0.65 to 0.85 THB/kWh |
| Firewood and rubberwood offcuts, air-dry | over 1 THB/kg at the farm gate, up from 0.55 to 0.70 before late 2025 | [OIE Rubber Intelligence Unit](https://rubber.oie.go.th/Article.aspx?id=66365), 2026; southern rubber belt, so chipping and haulage to Lamphun come on top | ~0.3 to 0.5 THB/kWh before chipping and haulage |
| Corn cobs and stalk residue | 2 THB/kg, bought from farmers in Mae Chaem (Chiang Mai) | Sunsweet's "no burning, we buy" programme, [Prachachat](https://www.prachachat.net/economic/local-economy/news-1498508), February 2024; an incentive price set to stop field burning | ~0.6 THB/kWh |
| Rice husk | ~1.5 THB/kg at past demand peaks | [FTI renewable energy group](https://re-fti.org/%E0%B9%84%E0%B8%9F%E0%B8%9F%E0%B9%89%E0%B8%B2%E0%B8%8A%E0%B8%B5%E0%B8%A7%E0%B8%A1%E0%B8%A7%E0%B8%A5%E0%B8%A3%E0%B8%B0%E0%B8%AA%E0%B9%88%E0%B8%B3%E0%B8%A3%E0%B8%B2%E0%B8%84%E0%B8%B2%E0%B9%81%E0%B8%81%E0%B8%A5%E0%B8%9A%E0%B8%9E%E0%B8%B8%E0%B9%88%E0%B8%87/) (undated); power plants compete for it and northern milling volumes are small | ~0.5 THB/kWh |
| Wood pellets, domestic | 3,000 to 5,000 THB/t | LH Bank Research, March 2026; export FOB averaged 4,482 THB/t in 2025 | ~0.75 to 1.25 THB/kWh |
Heat cost assumes an 80 % boiler (85 % on pellets) and ~2.6 kWh/kg for
fresh chips, ~4 for air-dry wood, ~4.2 for corn cobs, ~3.75 for rice husk
and ~4.7 for pellets (estimates).
What it means for the plan:
- **Planning price: 1.35 to 2 THB/kg delivered**, which is ~0.5 to 0.9 THB
per kWh of heat. The earlier assumption of 1 to 2 THB/kg of air-dry wood
(~0.3 to 0.6 THB/kWh) was too low at the bottom: the cheap end is
farm-gate wood, not chipped fuel at the plant gate. At maturity the fuel
bill is **~0.6M to 1.2M THB a year** (~0.15M to 0.3M early), still a
quarter to a tenth of electric steam (see
[grid tariff](sustainability.md#grid-tariff-pea-and-what-it-decides))
- **Prices are rising and follow diesel.** With diesel near 40 THB/L in
2026, chip traders feeding power plants parked trucks and cut purchases
([Thai Post](https://www.thaipost.net/district-news/971839/), 30 March
2026), and rubberwood firewood roughly doubled since late 2025. Haulage
is a large share of a delivered tonne, so source within ~50 km and write
a diesel clause into the fuel contract rather than a fixed price
- **Supply is not the constraint.** Lamphun alone produces more than
900,000 t of farm residues a year (Maejo University, via
[ThaiPublica](https://thaipublica.org/2026/08/lamphun-reduce-pm2-5-agricultural-waste-biomass-fuel/),
August 2026) against the plant's ~600 t. Buying them also counts against
the burning season, which is part of the story
- **The local price-setter is in Mueang Lamphun.** Ratch Pathana's
[biomass buying centre](https://www.ratchpathana.com/th/our-businesses/related-and-other-businesses/biomass-business)
at Pa Sak, Mueang Lamphun, buys wood waste, sawdust and corn cobs from
farmers for Saha Cogen Green's 9.6 MW, 25 t/h steam cogeneration plant
in the Saha Group Lamphun industrial park. It is the reference price to
ask for and the main competitor for the same fuel. Further out, Clover
Power at Wang Chin (Phrae) buys chips, corn husks and cobs, and bamboo
([DEDE buyer list](finance/biomass/DEDE_biomass_buyers_2026-02.pdf),
February 2026)
- **Next step:** written quotes from the Pa Sak centre and two or three
chip suppliers within 50 km, priced by moisture content (an oven-dry
tonne carries roughly twice the heat of a fresh one), before the boiler
decision
## Logistics on site
To reflect in the facility planning: a fuel storage shed (biomass
@@ -82,8 +141,8 @@ storage are additional.
- The electric boiler remains the alternative: cleanest permitting, no fuel
logistics, but effectively grid-powered steam at a ~300 kW draw. On
PEA's time-of-use tariff that costs ~4.7M to 5.5M THB a year at mature
load against ~0.35M to 0.8M of fuel for biomass, and ~1.4M to 1.7M
against ~0.1M to 0.2M at early load, because the demand charge follows
load against ~0.6M to 1.2M of fuel for biomass, and ~1.4M to 1.7M
against ~0.15M to 0.3M at early load, because the demand charge follows
the boiler's full-power draw (estimates; see the
[grid tariff](sustainability.md#grid-tariff-pea-and-what-it-decides)).
The electric boiler is the more efficient machine; biomass is the far
@@ -92,6 +151,6 @@ storage are additional.
the coppice now (first harvest in 2 to 4 years), and add the biomass
boiler at the automated-line expansion when demand and the fuel supply
have both matured. At the tariff above that is a permitting and logistics
choice, not a cost one: every year on electric steam costs roughly 1.2M
to 5M THB more than biomass, so the switch should come as soon as the
choice, not a cost one: every year on electric steam costs roughly 1.1M
to 4.9M THB more than biomass, so the switch should come as soon as the
permit and a fuel contract are in place
Binary file not shown.
+9 -8
View File
@@ -37,8 +37,9 @@ at 10 bar / 180 °C) and the 250 kW cooling system.
abundant fuel); solar-thermal pre-heating of boiler feedwater was
considered and is not recommended. No technology choice has been made
yet; it will be driven by honest numbers on load profiles, storage, and
grid backup, not by what sounds greenest. At PEA's tariff, biomass heat
costs about a tenth of electric steam
grid backup, not by what sounds greenest. At PEA's tariff and current
northern fuel prices, biomass heat costs a quarter to a tenth of electric
steam
([grid tariff](#grid-tariff-pea-and-what-it-decides)).
- Whole-factory HVAC (continuous temperature, humidity, and PM control, see
[facility systems](facility-security.md)) adds a major tropical-climate
@@ -202,16 +203,16 @@ solar, 0.5M to 0.7M of it demand charge (estimate).
| | Electric boiler (~98 %) | Biomass boiler (~80 %) |
|---|---|---|
| Price of heat | ~3.9 THB/kWh, plus the demand charge | ~0.3 to 0.6 THB/kWh at 1 to 2 THB/kg of fuel (fuel price not yet checked with local suppliers) |
| Running cost, mature two shifts | **~4.7M to 5.5M THB/yr**: 1,140 to 1,310 MWh plus 200 to 300 kW of extra peak demand (0.3M to 0.5M) | **~0.35M to 0.8M THB/yr** of fuel, plus fuel handling and ash |
| Price of heat | ~3.9 THB/kWh, plus the demand charge | ~0.5 to 0.9 THB/kWh at 1.35 to 2 THB/kg delivered ([reported market prices](biomass.md#fuel-prices-market-check-october-2026), October 2026; no supplier quote yet) |
| Running cost, mature two shifts | **~4.7M to 5.5M THB/yr**: 1,140 to 1,310 MWh plus 200 to 300 kW of extra peak demand (0.3M to 0.5M) | **~0.6M to 1.2M THB/yr** of fuel, plus fuel handling and ash |
| Boiler package ([utilities CSV](finance/utilities-investment.csv)) | 2.5M to 4M THB | 4M to 7M THB, plus the fuel store |
| Grid | peak demand 600 to 750 kW: bigger transformer and deposit | unchanged |
The electric boiler is the more efficient machine; biomass is by far the
cheaper heat. At maturity the fuel saving of ~4M to 5M THB a year repays
the biomass premium in about a year (estimate). Even early, at a quarter of
the heat, electric steam costs ~1.4M to 1.7M THB a year against ~0.1M to
0.2M of fuel, because the demand charge is set by the boiler's full-power
cheaper heat. At maturity the fuel saving of ~3.5M to 4.9M THB a year
repays the biomass premium in under a year (estimate). Even early, at a
quarter of the heat, electric steam costs ~1.4M to 1.7M THB a year against
~0.15M to 0.3M of fuel, because the demand charge is set by the boiler's full-power
draw, not by its average. Moving electric steam to off-peak hours barely
helps: the presses need steam while they run, and the peak window covers
13 of the 16 production hours. The staged electric-first path in