Payap model: two-storey office building with canteen, changing and showers

User, October 2026: the office building also houses several showers, a
changing room, toilets and a canteen; the office area itself about
150 m2; the building can be multi-storey.

Model (office rebuilt live in FreeCAD 26.3; factory and site untouched):
- 32 x 15 m on two storeys (off_storey 3.6 m), ~960 m2 of floor, Arch
  Stairs plus a lift, first floor slab with the stair and lift void;
- ground floor: reception and lobby (entrance and link door), canteen
  ~40 seats with kitchen and servery, changing rooms women and men with
  4 showers each and lockers, toilets, mastering and cutting (acoustic
  lining), listening room, archive;
- first floor: offices 147 m2 (16 desks), training room (Payap
  programmes), meeting room, IT and server, toilets, pantry, flexible
  room;
- factory staff entry relabelled "PPE, WC" (changing is in the office).
New docs/cnx_vinyl_parametric_payap-office.png with both floor plans.

Docs: site-candidates Payap section (office bullet, staff entry, area
~3,400 m2 footprint / ~3,880 m2 floor), README bullet and layout line.
This commit is contained in:
grabowski committed 2026-10-10 17:01:40 +07:00
1 parent 4263fbbd9b
commit 0700c14b5c
6 files changed
+29 -15

No files matched your search

Binary file not shown.

Before

Width:  |  Height:  |  Size: 365 KiB

After

Width:  |  Height:  |  Size: 387 KiB

Binary file not shown.

After

Width:  |  Height:  |  Size: 115 KiB

Binary file not shown.
Binary file not shown.

Before

Width:  |  Height:  |  Size: 249 KiB

After

Width:  |  Height:  |  Size: 252 KiB

+22 -11
View File
@@ -125,7 +125,7 @@ estimate.
plot keeps a reserve in front for a second hall or a PV field.
- **Factory, production floor only**: 112 × 25 m at floor level +1.2 m,
16 frame bays, in process order along an 82 m glazed visitor corridor.
From west to east: staff entry and lockers; workshop and spares, with
From west to east: staff entry (PPE, WC); workshop and spares, with
the machine door and a 12 m vehicle ramp at the north-west corner;
galvanics clean room with a chemical day store; stamper prep, PVC lab,
material area and the electrical room; the press hall; trim and optical
@@ -149,14 +149,24 @@ estimate.
by gravity from the galvanics floor, and a covered crossing (6 m clear
for trucks) joins the galvanics door
([galvanics](equipment/galvanics.md)).
- **Office building, isolated from the factory floor**: 24 × 15 m, single
storey, 12 m south of the factory on its own slab and structure, joined
by a covered link that lands at the start of the visitor corridor.
- It holds reception, offices, a meeting and training room (the
[Payap programmes](payap-partnership.md)), mastering and cutting with
an inner acoustic lining, the listening room, the IT and server room,
the archive, and WC and kitchen.
- The lathe sits away from press vibration and outside the crane zone.
- **Office building, isolated from the factory floor**: 32 × 15 m on two
storeys, ~960 m² of floor
([floor plans](cnx_vinyl_parametric_payap-office.png)). It stands 12 m
south of the factory on its own slab and structure, joined by a covered
link that lands at the start of the visitor corridor. A stair and a lift
connect the floors.
- Ground floor, for staff and the studio: reception and lobby, a canteen
for about 40 with its kitchen, changing rooms for women and men with
four showers each, toilets, mastering and cutting with an inner
acoustic lining, the listening room and the archive. Staff change here
before crossing to the factory, whose staff entry keeps only PPE and a
WC.
- First floor: the offices (~150 m²), a meeting and training room (the
[Payap programmes](payap-partnership.md)), a meeting room, the IT and
server room, toilets, a pantry, and a flexible room for a second
classroom or more offices.
- The lathe sits on the ground slab, away from press vibration and
outside the crane zone.
- **Utility yard** behind the press hall, across a 6 m lane:
- boiler house with chimney and a covered fuel store;
- chiller and cooling tower;
@@ -175,8 +185,9 @@ estimate.
- a lane behind the factory serves the yard, the water treatment
building and the ramp. The low-loader's swept path at the ramp still
needs checking.
- **Area**: about 2,800 m² of factory, 360 m² of office and 120 m² of
water treatment, so ~3,280 m² under roof plus the boiler house. That is
- **Area**: about 2,800 m² of factory, 480 m² of office footprint (~960
m² on two floors) and 120 m² of water treatment, so ~3,400 m² under roof
plus the boiler house, and ~3,880 m² of floor. That is
well above the 1,400 to 2,000 m² of the [scale](scale.md) zone table,
which held one Duplex and an automated zone with the offices inside.
- Two thirds of the difference is the press hall with its expansion