Payap model: two-storey office building with canteen, changing and showers
User, October 2026: the office building also houses several showers, a changing room, toilets and a canteen; the office area itself about 150 m2; the building can be multi-storey. Model (office rebuilt live in FreeCAD 26.3; factory and site untouched): - 32 x 15 m on two storeys (off_storey 3.6 m), ~960 m2 of floor, Arch Stairs plus a lift, first floor slab with the stair and lift void; - ground floor: reception and lobby (entrance and link door), canteen ~40 seats with kitchen and servery, changing rooms women and men with 4 showers each and lockers, toilets, mastering and cutting (acoustic lining), listening room, archive; - first floor: offices 147 m2 (16 desks), training room (Payap programmes), meeting room, IT and server, toilets, pantry, flexible room; - factory staff entry relabelled "PPE, WC" (changing is in the office). New docs/cnx_vinyl_parametric_payap-office.png with both floor plans. Docs: site-candidates Payap section (office bullet, staff entry, area ~3,400 m2 footprint / ~3,880 m2 floor), README bullet and layout line.
This commit is contained in:
1 parent
4263fbbd9b
commit
0700c14b5c
6 files changed
+29
-15
No files matched your search
Binary file not shown.
|
Before Width: | Height: | Size: 365 KiB After Width: | Height: | Size: 387 KiB |
Binary file not shown.
|
After Width: | Height: | Size: 115 KiB |
Binary file not shown.
Binary file not shown.
|
Before Width: | Height: | Size: 249 KiB After Width: | Height: | Size: 252 KiB |
+22
-11
@@ -125,7 +125,7 @@ estimate.
|
||||
plot keeps a reserve in front for a second hall or a PV field.
|
||||
- **Factory, production floor only**: 112 × 25 m at floor level +1.2 m,
|
||||
16 frame bays, in process order along an 82 m glazed visitor corridor.
|
||||
From west to east: staff entry and lockers; workshop and spares, with
|
||||
From west to east: staff entry (PPE, WC); workshop and spares, with
|
||||
the machine door and a 12 m vehicle ramp at the north-west corner;
|
||||
galvanics clean room with a chemical day store; stamper prep, PVC lab,
|
||||
material area and the electrical room; the press hall; trim and optical
|
||||
@@ -149,14 +149,24 @@ estimate.
|
||||
by gravity from the galvanics floor, and a covered crossing (6 m clear
|
||||
for trucks) joins the galvanics door
|
||||
([galvanics](equipment/galvanics.md)).
|
||||
- **Office building, isolated from the factory floor**: 24 × 15 m, single
|
||||
storey, 12 m south of the factory on its own slab and structure, joined
|
||||
by a covered link that lands at the start of the visitor corridor.
|
||||
- It holds reception, offices, a meeting and training room (the
|
||||
[Payap programmes](payap-partnership.md)), mastering and cutting with
|
||||
an inner acoustic lining, the listening room, the IT and server room,
|
||||
the archive, and WC and kitchen.
|
||||
- The lathe sits away from press vibration and outside the crane zone.
|
||||
- **Office building, isolated from the factory floor**: 32 × 15 m on two
|
||||
storeys, ~960 m² of floor
|
||||
([floor plans](cnx_vinyl_parametric_payap-office.png)). It stands 12 m
|
||||
south of the factory on its own slab and structure, joined by a covered
|
||||
link that lands at the start of the visitor corridor. A stair and a lift
|
||||
connect the floors.
|
||||
- Ground floor, for staff and the studio: reception and lobby, a canteen
|
||||
for about 40 with its kitchen, changing rooms for women and men with
|
||||
four showers each, toilets, mastering and cutting with an inner
|
||||
acoustic lining, the listening room and the archive. Staff change here
|
||||
before crossing to the factory, whose staff entry keeps only PPE and a
|
||||
WC.
|
||||
- First floor: the offices (~150 m²), a meeting and training room (the
|
||||
[Payap programmes](payap-partnership.md)), a meeting room, the IT and
|
||||
server room, toilets, a pantry, and a flexible room for a second
|
||||
classroom or more offices.
|
||||
- The lathe sits on the ground slab, away from press vibration and
|
||||
outside the crane zone.
|
||||
- **Utility yard** behind the press hall, across a 6 m lane:
|
||||
- boiler house with chimney and a covered fuel store;
|
||||
- chiller and cooling tower;
|
||||
@@ -175,8 +185,9 @@ estimate.
|
||||
- a lane behind the factory serves the yard, the water treatment
|
||||
building and the ramp. The low-loader's swept path at the ramp still
|
||||
needs checking.
|
||||
- **Area**: about 2,800 m² of factory, 360 m² of office and 120 m² of
|
||||
water treatment, so ~3,280 m² under roof plus the boiler house. That is
|
||||
- **Area**: about 2,800 m² of factory, 480 m² of office footprint (~960
|
||||
m² on two floors) and 120 m² of water treatment, so ~3,400 m² under roof
|
||||
plus the boiler house, and ~3,880 m² of floor. That is
|
||||
well above the 1,400 to 2,000 m² of the [scale](scale.md) zone table,
|
||||
which held one Duplex and an automated zone with the offices inside.
|
||||
- Two thirds of the difference is the press hall with its expansion
|
||||
|
||||
Reference in new issue