User, October 2026: the office building also houses several showers, a changing room, toilets and a canteen; the office area itself about 150 m2; the building can be multi-storey. Model (office rebuilt live in FreeCAD 26.3; factory and site untouched): - 32 x 15 m on two storeys (off_storey 3.6 m), ~960 m2 of floor, Arch Stairs plus a lift, first floor slab with the stair and lift void; - ground floor: reception and lobby (entrance and link door), canteen ~40 seats with kitchen and servery, changing rooms women and men with 4 showers each and lockers, toilets, mastering and cutting (acoustic lining), listening room, archive; - first floor: offices 147 m2 (16 desks), training room (Payap programmes), meeting room, IT and server, toilets, pantry, flexible room; - factory staff entry relabelled "PPE, WC" (changing is in the office). New docs/cnx_vinyl_parametric_payap-office.png with both floor plans. Docs: site-candidates Payap section (office bullet, staff entry, area ~3,400 m2 footprint / ~3,880 m2 floor), README bullet and layout line.
11 KiB
Site Candidates
The site strategy is a long lease of raw land on which the purpose-built
plant is constructed (business plan section 6.1, built from
business-plan/build/). What any site has to offer is unchanged: ~4 rai
minimum and 6 to 8 rai with expansion, truck access and turning, room for
the cooling tower and a separated battery enclosure, a 500 to 1,000 kVA
medium-voltage connection, a slab rated 3 t/m² and a frame able to carry
the overhead crane (scale,
crane, workshop and tours), factory permission
for pressing with a steam boiler, and, for Phase 5, permission for an
electroplating line (galvanics and stamper prep).
The three candidates
| Mueang Chi, Lamphun | Northern Region Industrial Estate, Lamphun | Payap University land, Chiang Mai | |
|---|---|---|---|
| Status | Working candidate: the massing model, PV roof design and construction RFQ are sited here | Fallback | New lead (October 2026): the university approached the project and is interested in leasing land to us |
| Lessor | Private owner | IEAT | Payap University (private, non-profit, founded by the Foundation of the Church of Christ in Thailand) |
| Plot | 5-0-66.5 rai, 18.4708 N, 98.9642 E, narrow and skewed | Leased estate plots | Not yet identified. The main (Mae Khao) campus is at 18.795 N, 99.033 E |
| Distance to Chiang Mai old city | ~35 km | Lamphun valley | ~5 km east, on the Chiang Mai–Lampang superhighway |
| Zoning for factory use | Unverified (agricultural land) | Industrial estate; licensing through the estate | Unverified |
| Galvanics effluent | Ours to permit; zero discharge | Shared central effluent treatment | Needs the lessor's consent on top of the permit |
| Neighbours | Agricultural | Industrial | A pharmaceutical facility under construction on the same land |
Payap University (new lead, October 2026)
What we know from the conversation: Payap University is interested in leasing land to the project, and a pharmaceutical facility is under construction on the same land. The plot, its size, the title, the term and the rent are not known yet.
Public facts. Payap's main campus, Mae Khao, is at 272 Moo 2, San Phranet, San Sai district, on the Chiang Mai–Lampang superhighway. The university bought it in 1974 as about 120 acres of low-lying land and has since grown it to about 275 acres (~700 rai) with purchases across the ring road (Payap's own history page). Its Faculty of Pharmacy put the construction of a cosmetics production facility and co-working space out to tender in July 2024, and the university has announced a centre for producing active compounds from cannabis and medicinal plants by bioreactor (RPAH) with an industry sponsor. Whether either of these is the pharmaceutical facility on the offered land is to be confirmed.
Why it is worth pursuing.
- Location. About 5 km from the old city and 25 to 30 km nearer the team, customers and the airport than Mueang Chi. The visitor corridor, the artist platform and hiring all work better in town.
- A partner, not only a landlord. Payap also wants to build new student programmes with us in audio engineering (mastering, lathe cutting), IT and business administration; that strand has its own page, Payap partnership. Its Faculty of Pharmacy has analytical labs that could back the PVC material lab (quality automation), and a formal university collaboration is the kind of R&D and skills cooperation the BOI merit measures reward; confirm which measure applies.
- Production is already being built there. If the pharmaceutical facility has factory permission, the land may already have a path through licensing and a medium-voltage supply nearby. Shared infrastructure (MV connection, RO water, effluent treatment) is worth asking about.
What could rule it out (check in this order, before any design work):
- Zoning. The plot's colour in the Chiang Mai comprehensive city plan and whether it allows a record-pressing factory with a steam boiler and, later, electroplating. A pharmaceutical or cosmetics plant and an electroplating line are different factory classes, so the neighbour's permit proves little. Ask the provincial public works and town planning office, as for Mueang Chi.
- Can the university lease to a company? Title type (Chanote needed), university council approval, and whether campus land of a private higher-education institution carries restrictions on commercial leases. This is a question for Thai counsel, together with the lease terms the business plan already requires (registered 30-year lease with renewal, building ownership, mortgageable).
- The pharmaceutical neighbour. A GMP facility is sensitive to dust, smoke and fumes. Ours: the boiler stack (biomass smoke next to a pharmaceutical plant in town would be a hard sell, which favours electric or LPG steam; see biomass), galvanics extraction, PVC extrusion fumes, press noise and truck traffic. Agree emission and buffer rules in the lease rather than after the first complaint.
- Flooding. Payap describes the Mae Khao land as low-lying when bought. Check the plot against the 2024 flood extents; the design's floor, 1.2 m above ground for the loading docks, helps but is not a flood assessment.
- Plot fit. Shape and size against the 60 × 25 m building, the detached utility yard and the phase 2 footprint (6 to 8 rai). The Payap scenario model below needs a 135 m square (11.4 rai) as drawn, with room for ten more Classics and a reserve.
- Galvanics on a campus. Phase 5 electroplating needs the lessor's written consent; the zero-discharge design (sustainability) becomes a lease condition, not only a commitment.
Questions for the next meeting with Payap: which plot (map, size, title deed number), its zoning and current use; what the pharmaceutical facility is, who operates it and when it opens; what utilities it brings (MV, water, wastewater); lease term, rent, renewal and building ownership; what collaboration the university wants in return.
Nothing has been re-sited. The parametric model, PV roof study, RFQ and
the fleet site code lpn in the digital factory
stay on Mueang Chi until a Payap plot is known and has passed checks 1
and 2.
Payap scenario model (October 2026)
To see the plant on Payap land before a plot is known, a separate
parametric BIM model sites it on a simple square plot:
cnx_vinyl_parametric_payap.FCStd
(top view PNG,
isometric), built in FreeCAD 26.3
from BIM walls, slabs, columns, spaces and equipment. Every size and
position hangs off its Params spreadsheet (plot side, setbacks, floor
level, building sizes, fire wall line, office and water treatment gaps),
so the square can be swapped for the real plot once Payap names one. It
is a layout sketch: every position and every equipment envelope is an
estimate.
-
Plot: 135 × 135 m (18,225 m², 11.4 rai), road assumed on the south side, 6 m setbacks (placeholder). That is more than the 6 to 8 rai of scale: the factory keeps room for ten more Classics, and the plot keeps a reserve in front for a second hall or a PV field.
-
Factory, production floor only: 112 × 25 m at floor level +1.2 m, 16 frame bays, in process order along an 82 m glazed visitor corridor. From west to east: staff entry (PPE, WC); workshop and spares, with the machine door and a 12 m vehicle ramp at the north-west corner; galvanics clean room with a chemical day store; stamper prep, PVC lab, material area and the electrical room; the press hall; trim and optical inspection, QC lab, and finishing and packaging. Behind the fire wall at 90 m are the warehouse and dispatch with two dock doors.
- The press hall (~870 m²) holds two Duplex systems, each two HRP 12 presses with an EX 50 and an EX 35, the Classic, and ten more Classic positions in two rows (pressing line).
- One shared hydraulic and compressed-air supply: a central plant room (~62 m²) at the west end of the press hall, and a service trench along the press rows for the hydraulic ring main, compressed air, steam and cooling water.
- The workshop (~200 m²) is fully equipped, with 3D printers, a lathe and a small CNC mill among the tools (crane, workshop and tours).
- The 5 t crane runs from the west wall to the fire wall.
-
Water treatment building, separate, 12 × 10 m at ground level directly behind galvanics: zero-discharge effluent treatment, the DI water plant and the chemical store. A buried duct carries the effluent by gravity from the galvanics floor, and a covered crossing (6 m clear for trucks) joins the galvanics door (galvanics).
-
Office building, isolated from the factory floor: 32 × 15 m on two storeys, ~960 m² of floor (floor plans). It stands 12 m south of the factory on its own slab and structure, joined by a covered link that lands at the start of the visitor corridor. A stair and a lift connect the floors.
- Ground floor, for staff and the studio: reception and lobby, a canteen for about 40 with its kitchen, changing rooms for women and men with four showers each, toilets, mastering and cutting with an inner acoustic lining, the listening room and the archive. Staff change here before crossing to the factory, whose staff entry keeps only PPE and a WC.
- First floor: the offices (~150 m²), a meeting and training room (the Payap programmes), a meeting room, the IT and server room, toilets, a pantry, and a flexible room for a second classroom or more offices.
- The lathe sits on the ground slab, away from press vibration and outside the crane zone.
-
Utility yard behind the press hall, across a 6 m lane:
- boiler house with chimney and a covered fuel store;
- chiller and cooling tower;
- process and fire water tanks;
- PEA transformer;
- a pipe bridge that drops into the service trench.
Boiler, chiller and transformer are drawn at the one-Duplex sizes. They need re-sizing for five presses, and again if the Classics are added (scale).
-
Access:
- one gate on the south side opens onto a truck apron in front of the dock doors;
- an access road runs along the south boundary to the car park, with a footpath to the office;
- a lane behind the factory serves the yard, the water treatment building and the ramp. The low-loader's swept path at the ramp still needs checking.
-
Area: about 2,800 m² of factory, 480 m² of office footprint (~960 m² on two floors) and 120 m² of water treatment, so ~3,400 m² under roof plus the boiler house, and ~3,880 m² of floor. That is well above the 1,400 to 2,000 m² of the scale zone table, which held one Duplex and an automated zone with the offices inside.
- Two thirds of the difference is the press hall with its expansion floor.
- Warehouse and dispatch (~530 m²) are drawn above that table's 300 to 500 m² for packaging and finished goods.
All of it is an estimate to settle against the real plot.
The Mueang Chi model and everything sited on it stay as they are.