diff --git a/README.md b/README.md index 42eda5b..2321bdb 100644 --- a/README.md +++ b/README.md @@ -132,10 +132,12 @@ The detail lives in dedicated documents: [isometric](docs/cnx_vinyl_parametric_payap-iso.png)) of the whole plant on a square placeholder plot of Payap land: a 112 x 25 m production-only factory with the five-press fleet, room for ten more Classics and one - shared hydraulic and air plant, a separate office building for offices, - mastering and IT, a separate water treatment building next to - galvanics, the utility yard and site access, all driven by one - parameter sheet + shared hydraulic and air plant, a separate two-storey office building + ([floor plans](docs/cnx_vinyl_parametric_payap-office.png): canteen, + changing rooms and showers, mastering and listening below; ~150 m² of + offices, training room and IT above), a separate water treatment + building next to galvanics, the utility yard and site access, all + driven by one parameter sheet - [Process logging and traceability](docs/traceability.md): end-to-end per-order traceability for customers, batch genealogy from audio file to shipment, and the requirements this sets for the factory software @@ -237,6 +239,7 @@ docs/ ├── cnx_vinyl_parametric_payap.FCStd Payap scenario parametric BIM model ├── cnx_vinyl_parametric_payap.png Top view of the Payap model ├── cnx_vinyl_parametric_payap-iso.png Isometric view of the Payap model +├── cnx_vinyl_parametric_payap-office.png Office building floor plans ├── crane-workshop-tours.md Overhead crane, workshop, visitor corridor ├── digital-factory.md Data platform, NixOS/Clan fleet, acquisition, app ├── facility-security.md Security, HVAC, fire and life safety, compliance diff --git a/docs/cnx_vinyl_parametric_payap-iso.png b/docs/cnx_vinyl_parametric_payap-iso.png index 6c11a24..a9cfeff 100644 Binary files a/docs/cnx_vinyl_parametric_payap-iso.png and b/docs/cnx_vinyl_parametric_payap-iso.png differ diff --git a/docs/cnx_vinyl_parametric_payap-office.png b/docs/cnx_vinyl_parametric_payap-office.png new file mode 100644 index 0000000..7e41b91 Binary files /dev/null and b/docs/cnx_vinyl_parametric_payap-office.png differ diff --git a/docs/cnx_vinyl_parametric_payap.FCStd b/docs/cnx_vinyl_parametric_payap.FCStd index 0a531cb..6ec83c4 100644 Binary files a/docs/cnx_vinyl_parametric_payap.FCStd and b/docs/cnx_vinyl_parametric_payap.FCStd differ diff --git a/docs/cnx_vinyl_parametric_payap.png b/docs/cnx_vinyl_parametric_payap.png index 4d74816..6afbaa5 100644 Binary files a/docs/cnx_vinyl_parametric_payap.png and b/docs/cnx_vinyl_parametric_payap.png differ diff --git a/docs/site-candidates.md b/docs/site-candidates.md index 7f40927..66230a5 100644 --- a/docs/site-candidates.md +++ b/docs/site-candidates.md @@ -125,7 +125,7 @@ estimate. plot keeps a reserve in front for a second hall or a PV field. - **Factory, production floor only**: 112 × 25 m at floor level +1.2 m, 16 frame bays, in process order along an 82 m glazed visitor corridor. - From west to east: staff entry and lockers; workshop and spares, with + From west to east: staff entry (PPE, WC); workshop and spares, with the machine door and a 12 m vehicle ramp at the north-west corner; galvanics clean room with a chemical day store; stamper prep, PVC lab, material area and the electrical room; the press hall; trim and optical @@ -149,14 +149,24 @@ estimate. by gravity from the galvanics floor, and a covered crossing (6 m clear for trucks) joins the galvanics door ([galvanics](equipment/galvanics.md)). -- **Office building, isolated from the factory floor**: 24 × 15 m, single - storey, 12 m south of the factory on its own slab and structure, joined - by a covered link that lands at the start of the visitor corridor. - - It holds reception, offices, a meeting and training room (the - [Payap programmes](payap-partnership.md)), mastering and cutting with - an inner acoustic lining, the listening room, the IT and server room, - the archive, and WC and kitchen. - - The lathe sits away from press vibration and outside the crane zone. +- **Office building, isolated from the factory floor**: 32 × 15 m on two + storeys, ~960 m² of floor + ([floor plans](cnx_vinyl_parametric_payap-office.png)). It stands 12 m + south of the factory on its own slab and structure, joined by a covered + link that lands at the start of the visitor corridor. A stair and a lift + connect the floors. + - Ground floor, for staff and the studio: reception and lobby, a canteen + for about 40 with its kitchen, changing rooms for women and men with + four showers each, toilets, mastering and cutting with an inner + acoustic lining, the listening room and the archive. Staff change here + before crossing to the factory, whose staff entry keeps only PPE and a + WC. + - First floor: the offices (~150 m²), a meeting and training room (the + [Payap programmes](payap-partnership.md)), a meeting room, the IT and + server room, toilets, a pantry, and a flexible room for a second + classroom or more offices. + - The lathe sits on the ground slab, away from press vibration and + outside the crane zone. - **Utility yard** behind the press hall, across a 6 m lane: - boiler house with chimney and a covered fuel store; - chiller and cooling tower; @@ -175,8 +185,9 @@ estimate. - a lane behind the factory serves the yard, the water treatment building and the ramp. The low-loader's swept path at the ramp still needs checking. -- **Area**: about 2,800 m² of factory, 360 m² of office and 120 m² of - water treatment, so ~3,280 m² under roof plus the boiler house. That is +- **Area**: about 2,800 m² of factory, 480 m² of office footprint (~960 + m² on two floors) and 120 m² of water treatment, so ~3,400 m² under roof + plus the boiler house, and ~3,880 m² of floor. That is well above the 1,400 to 2,000 m² of the [scale](scale.md) zone table, which held one Duplex and an automated zone with the offices inside. - Two thirds of the difference is the press hall with its expansion