All derived figures reviewer-recomputed; BESS runtime corrected to the chiller's electrical draw (2-3 h, not 1 h of thermal rating)
130 lines
6.2 KiB
Markdown
130 lines
6.2 KiB
Markdown
# CNX Vinyl / Poy Records
|
|
|
|
A vinyl record factory in planning for the Chiang Mai area of northern
|
|
Thailand (site candidates include Lamphun and Lampang provinces). This
|
|
repository is the source of truth for the project: planning documents and
|
|
cost data today. As the factory takes shape it will also hold the data and
|
|
software used to run it.
|
|
|
|
## Team
|
|
|
|
- **Simona Meesaiyati**, Project Lead
|
|
- **Alexander Grabowski**, Technical Consultant
|
|
|
|
[buildfor.life](https://buildfor.life) supports the project in a consulting
|
|
capacity.
|
|
|
|
## Vision: Full-Service Production
|
|
|
|
The goal is the complete vinyl production chain under one roof, from audio
|
|
file to delivered record:
|
|
|
|
1. **Mastering**: audio mastering for vinyl
|
|
2. **Lathe cutting**: cutting the master disc
|
|
3. **Silvering**: metallizing the cut master
|
|
4. **Stamper production**: electroforming nickel stampers in-house
|
|
5. **Pressing**: extrusion and pressing of the finished records
|
|
6. **Finishing**: trimming, labels, shrink wrapping
|
|
7. **Packaging**: folded paper cartons (jackets and sleeves), produced in
|
|
collaboration with local packaging manufacturers
|
|
8. **Fulfillment**: dropshipping directly to end customers on behalf of
|
|
labels and artists, alongside conventional bulk delivery
|
|
|
|
In-house galvanics (steps 3 and 4) removes the dependency on overseas stamper
|
|
suppliers, a common bottleneck for pressing plants, and shortens turnaround
|
|
for clients. Partnering with local carton manufacturers keeps packaging
|
|
sourcing close to the plant, in line with the local-sourcing preference for
|
|
materials. The pressing line is documented in detail; equipment, partners,
|
|
and budgets for the other steps are open planning items.
|
|
|
|
## Project Status
|
|
|
|
**Planning stage** (as of mid-2026).
|
|
|
|
- Industry outreach has been ongoing for several years: equipment vendors,
|
|
material suppliers, and independent consultants.
|
|
- Alexander and Simona will soon travel to
|
|
[Making Vinyl](https://makingvinyl.com/) in Haarlem, Netherlands, to gather
|
|
further insights from the pressing industry.
|
|
- A collaboration with [Resurrec](https://www.resurrec.com/) is under
|
|
discussion.
|
|
|
|
## Planning Documents
|
|
|
|
The detail lives in dedicated documents:
|
|
|
|
- [Pressing line equipment plan](docs/equipment/pressing-line.md): the
|
|
50/50 automated/semi-automatic fleet strategy, the Newbilt system under
|
|
evaluation (≈ €200,500 quoted scope), and site requirements
|
|
- [Vendor landscape](docs/suppliers/vendor-landscape.md): researched
|
|
candidates for mastering and cutting (Agnew Analog), galvanics equipment
|
|
(Plating Power / Digital Matrix), stamper preparation (Sibert), bridge
|
|
stamper service (Stamper Discs), and automated presses (Pheenix Alpha)
|
|
- [Equipment needs and supplier map](docs/suppliers/equipment-suppliers.md):
|
|
the full needs list per production step with supplier tables and contacts
|
|
- [Sustainability](docs/sustainability.md): the solar installation (Deye
|
|
inverters, 271 kWh Gobel Power battery stack), the zero contaminated water
|
|
commitment, and the materials strategy
|
|
- [Worker safety](docs/worker-safety.md): safety training, galvanics clean
|
|
rooms and decontamination, PPE
|
|
- [Biomass fuel strategy](docs/biomass.md): the 60 rai own-grown coppice
|
|
idea (with the forestry-classification check that comes first), northern
|
|
agricultural waste as the main supply, and the staged electric-to-biomass
|
|
path
|
|
- [BOI investment promotion](docs/boi.md): the promotion strategy (Group B
|
|
base activity plus solar, automation, and R&D measures for the tax value),
|
|
requirements, Northern-region angle, and why BOI approval precedes
|
|
machinery orders
|
|
- [Facility security and site systems](docs/facility-security.md): access
|
|
control, CCTV, whole-factory HVAC (temperature, humidity, PM), archive and
|
|
audio protection, fire and life safety, plant monitoring, Thai compliance
|
|
anchors
|
|
- [Process logging and traceability](docs/traceability.md): end-to-end
|
|
per-order traceability for customers, batch genealogy from audio file to
|
|
shipment, and the requirements this sets for the factory software
|
|
- [Quality automation](docs/quality-automation.md): stamper metrology
|
|
(Keyence-class confocal, profiler, XRF), layered pressed-record QC (100%
|
|
optical inspection, per-cycle press telemetry, sampled automated audio
|
|
comparison), and how it feeds traceability
|
|
- [Process flow](docs/process-flow.md): the whole chain from audio file to
|
|
delivered record as a chart and stage table, with every check and the
|
|
three artist approval gates (printable diagram alongside)
|
|
- [Project scale](docs/scale.md): rough numbers for everything on one page:
|
|
output capacity, building area, land, electrical demand, solar and
|
|
storage, steam and fuel, headcount, and money cross-references
|
|
|
|
## Repository Layout
|
|
|
|
```
|
|
docs/
|
|
├── consulting/ Consultancy proposals and overviews
|
|
├── equipment/
|
|
│ ├── newbilt/ Offers, site requirements, process schematic,
|
|
│ │ service rates (vendor PDFs)
|
|
│ └── pressing-line.md Press fleet strategy and equipment plan
|
|
├── finance/ Project cost overviews
|
|
├── suppliers/ Supplier contacts, vendor landscape, supplier map
|
|
├── biomass.md Biomass fuel strategy and the 60 rai coppice idea
|
|
├── boi.md BOI promotion strategy and requirements
|
|
├── facility-security.md Security, HVAC, fire and life safety, compliance
|
|
├── process-flow.md Audio file to delivered record, with all checks
|
|
├── quality-automation.md Stamper metrology and layered record QC
|
|
├── scale.md Rough project sizing on one page
|
|
├── sustainability.md Energy, water, materials commitments
|
|
├── traceability.md Process logging and per-order traceability
|
|
└── worker-safety.md Training, clean rooms, PPE
|
|
```
|
|
|
|
Vendor PDFs and spreadsheets are primary sources and reflect the state of
|
|
negotiations at their file dates. Treat prices and lead times as snapshots,
|
|
not commitments.
|
|
|
|
## Roadmap for This Repo
|
|
|
|
- Accumulate planning and vendor documents as decisions firm up, including
|
|
the mastering, cutting, and galvanics chain
|
|
- Add structured data (inventory, orders, production batches) once operations
|
|
begin
|
|
- Host the software/tooling built to run the factory (tracking, ERP-style
|
|
workflows)
|