No public price index exists; DEDE lists buyers, not prices. Reported market prices: fresh chips 1,350-1,800 THB/t (LH Bank, Mar 2026), rubberwood firewood >1 THB/kg farm gate (OIE RIU 2026, doubled since late 2025), corn residue 2 THB/kg (Sunsweet, Mae Chaem), rice husk ~1.5 THB/kg, pellets 3,000-5,000 THB/t. Planning price 1.35-2 THB/kg delivered, so the mature fuel bill is ~0.6M-1.2M THB/yr (was 0.35M-0.8M): still a quarter to a tenth of electric steam. Prices follow diesel; Ratch Pathana's Pa Sak (Lamphun) buying centre is the local price-setter. Sources filed under docs/finance/biomass/; sustainability.md and README follow.
157 lines
9.3 KiB
Markdown
157 lines
9.3 KiB
Markdown
# Biomass Fuel Strategy
|
|
|
|
If the steam boiler goes the biomass route (see the options in
|
|
[sustainability](sustainability.md) and the Getabec candidate in the
|
|
[utilities CSV](finance/utilities-investment.csv)), the fuel comes from two
|
|
sources: the team's own 60 rai of currently unused land, and northern
|
|
Thailand's agricultural waste market. Figures below are planning estimates,
|
|
plus or minus a wide margin, to be refined against the actual boiler choice
|
|
and duty cycle.
|
|
|
|
## Demand: what the boiler would burn
|
|
|
|
The 400 kg/h boiler is roughly 300 kW thermal at full fire. With the heat
|
|
recovery architecture trimming the load and realistic duty cycles:
|
|
|
|
- Mature plant (semi-auto plus automated lines, two shifts, ~300 days/yr):
|
|
roughly **350 to 400 tonnes of air-dry wood per year** (at ~80% boiler
|
|
efficiency and ~4 kWh/kg air-dry wood)
|
|
- Early operations (one press line, single shift): roughly a quarter of
|
|
that, **~90 to 100 t/yr**
|
|
- Bought as fresh wood chips (~45 % moisture, ~2.6 kWh/kg) the same heat
|
|
is **~540 to 620 t/yr**, which is what the fuel store and the monsoon
|
|
stock have to be sized for (estimate)
|
|
|
|
## The 60 rai: own-grown fuelwood
|
|
|
|
60 rai is 9.6 hectares. Managed as short-rotation coppice (planted once,
|
|
harvested on a 2 to 4 year cycle, regrowing from the stump), fast species
|
|
proven in Thailand (eucalyptus, acacia, leucaena, bamboo) yield roughly 8 to
|
|
14 air-dry tonnes per hectare per year. So the land can sustainably supply
|
|
about **80 to 135 t/yr**:
|
|
|
|
- Enough to cover **most or all of early operations**
|
|
- About **a quarter to a third of mature two-shift demand**
|
|
|
|
That makes the land a meaningful supplement and a strong brand story
|
|
("records pressed with steam from our own trees"), not a complete fuel
|
|
supply. At the market prices below, 80 to 135 t of air-dry wood is worth
|
|
only ~0.1M to 0.25M THB a year (estimate): the land's value is supply
|
|
security and the story, not the fuel bill.
|
|
|
|
### The classification check comes first
|
|
|
|
The land is currently classified as forestry, and in Thailand that carries
|
|
legal weight. Before a single tree enters the fuel plan:
|
|
|
|
- Verify the parcel's actual status: clean Chanote title vs Sor Por Kor vs
|
|
National Forest Reserve. Planting, harvesting, and transporting trees,
|
|
even self-planted ones, can be restricted depending on classification,
|
|
and some species are restricted regardless.
|
|
- If eligible, register the plantation under the forest plantation
|
|
framework, which legalizes grow-and-harvest cycles and the transport
|
|
paperwork.
|
|
- If the parcel carries actual standing forest, it should not be harvested
|
|
for fuel: that would undercut the sustainability commitments the plant is
|
|
built on. Coppice belongs on the degraded or empty portions.
|
|
|
|
## Filling the gap: the northern biomass market
|
|
|
|
The region fills the remainder easily and cheaply:
|
|
|
|
- **Longan orchard prunings**: Lamphun is Thailand's longan heartland and
|
|
prunings are an established traded fuel
|
|
- **Sawmill and wood-processing residues**
|
|
- **Corn cobs and rice husk**: abundant regional crop wastes; a
|
|
Getabec-class solid-fuel boiler is designed for exactly this fuel mix
|
|
- Buying from local farmers also strengthens the local-sourcing story that
|
|
already runs through packaging and PVC
|
|
|
|
## Fuel prices (market check, October 2026)
|
|
|
|
There is no public price index for biomass fuel in northern Thailand. DEDE
|
|
publishes lists of buyers and sellers (February 2026: 42 registered buyers
|
|
wanting 2.09M t a year), not prices, so the figures below are reported
|
|
market prices from bank research, a government industry unit and the
|
|
press, all checked 7 October 2026. None is a quote to this plant.
|
|
|
|
| Fuel | Reported price | Source | Heat cost (estimate) |
|
|
|---|---|---|---|
|
|
| Wood chips, fresh (45 to 50 % moisture) | 1,350 to 1,800 THB/t delivered | [LH Bank Research, wood pellet outlook](finance/biomass/LHBank_Wood_Pellets_Industry_Outlook_2026-03.pdf), 9 March 2026: 1,700 to 1,800 THB per fresh tonne for export; a power-plant chip quota in Nakhon Ratchasima at 1,350 THB/t, at most 45 % moisture (undated trader post) | ~0.65 to 0.85 THB/kWh |
|
|
| Firewood and rubberwood offcuts, air-dry | over 1 THB/kg at the farm gate, up from 0.55 to 0.70 before late 2025 | [OIE Rubber Intelligence Unit](https://rubber.oie.go.th/Article.aspx?id=66365), 2026; southern rubber belt, so chipping and haulage to Lamphun come on top | ~0.3 to 0.5 THB/kWh before chipping and haulage |
|
|
| Corn cobs and stalk residue | 2 THB/kg, bought from farmers in Mae Chaem (Chiang Mai) | Sunsweet's "no burning, we buy" programme, [Prachachat](https://www.prachachat.net/economic/local-economy/news-1498508), February 2024; an incentive price set to stop field burning | ~0.6 THB/kWh |
|
|
| Rice husk | ~1.5 THB/kg at past demand peaks | [FTI renewable energy group](https://re-fti.org/%E0%B9%84%E0%B8%9F%E0%B8%9F%E0%B9%89%E0%B8%B2%E0%B8%8A%E0%B8%B5%E0%B8%A7%E0%B8%A1%E0%B8%A7%E0%B8%A5%E0%B8%A3%E0%B8%B0%E0%B8%AA%E0%B9%88%E0%B8%B3%E0%B8%A3%E0%B8%B2%E0%B8%84%E0%B8%B2%E0%B9%81%E0%B8%81%E0%B8%A5%E0%B8%9A%E0%B8%9E%E0%B8%B8%E0%B9%88%E0%B8%87/) (undated); power plants compete for it and northern milling volumes are small | ~0.5 THB/kWh |
|
|
| Wood pellets, domestic | 3,000 to 5,000 THB/t | LH Bank Research, March 2026; export FOB averaged 4,482 THB/t in 2025 | ~0.75 to 1.25 THB/kWh |
|
|
|
|
Heat cost assumes an 80 % boiler (85 % on pellets) and ~2.6 kWh/kg for
|
|
fresh chips, ~4 for air-dry wood, ~4.2 for corn cobs, ~3.75 for rice husk
|
|
and ~4.7 for pellets (estimates).
|
|
|
|
What it means for the plan:
|
|
|
|
- **Planning price: 1.35 to 2 THB/kg delivered**, which is ~0.5 to 0.9 THB
|
|
per kWh of heat. The earlier assumption of 1 to 2 THB/kg of air-dry wood
|
|
(~0.3 to 0.6 THB/kWh) was too low at the bottom: the cheap end is
|
|
farm-gate wood, not chipped fuel at the plant gate. At maturity the fuel
|
|
bill is **~0.6M to 1.2M THB a year** (~0.15M to 0.3M early), still a
|
|
quarter to a tenth of electric steam (see
|
|
[grid tariff](sustainability.md#grid-tariff-pea-and-what-it-decides))
|
|
- **Prices are rising and follow diesel.** With diesel near 40 THB/L in
|
|
2026, chip traders feeding power plants parked trucks and cut purchases
|
|
([Thai Post](https://www.thaipost.net/district-news/971839/), 30 March
|
|
2026), and rubberwood firewood roughly doubled since late 2025. Haulage
|
|
is a large share of a delivered tonne, so source within ~50 km and write
|
|
a diesel clause into the fuel contract rather than a fixed price
|
|
- **Supply is not the constraint.** Lamphun alone produces more than
|
|
900,000 t of farm residues a year (Maejo University, via
|
|
[ThaiPublica](https://thaipublica.org/2026/08/lamphun-reduce-pm2-5-agricultural-waste-biomass-fuel/),
|
|
August 2026) against the plant's ~600 t. Buying them also counts against
|
|
the burning season, which is part of the story
|
|
- **The local price-setter is in Mueang Lamphun.** Ratch Pathana's
|
|
[biomass buying centre](https://www.ratchpathana.com/th/our-businesses/related-and-other-businesses/biomass-business)
|
|
at Pa Sak, Mueang Lamphun, buys wood waste, sawdust and corn cobs from
|
|
farmers for Saha Cogen Green's 9.6 MW, 25 t/h steam cogeneration plant
|
|
in the Saha Group Lamphun industrial park. It is the reference price to
|
|
ask for and the main competitor for the same fuel. Further out, Clover
|
|
Power at Wang Chin (Phrae) buys chips, corn husks and cobs, and bamboo
|
|
([DEDE buyer list](finance/biomass/DEDE_biomass_buyers_2026-02.pdf),
|
|
February 2026)
|
|
- **Next step:** written quotes from the Pa Sak centre and two or three
|
|
chip suppliers within 50 km, priced by moisture content (an oven-dry
|
|
tonne carries roughly twice the heat of a fresh one), before the boiler
|
|
decision
|
|
|
|
## Logistics on site
|
|
|
|
To reflect in the facility planning: a fuel storage shed (biomass
|
|
must be kept dry; monsoon-season storage sizing matters more than dry
|
|
season), chipping for coppice wood, ash handling, and the emissions stack
|
|
that comes with solid fuel. These are the capex/opex adders that the
|
|
biomass premium in the utilities CSV (roughly 4M to 7M THB for the boiler
|
|
package vs 2.5M to 4M electric/gas) partially reflects; fuel handling and
|
|
storage are additional.
|
|
|
|
## Decision framing
|
|
|
|
- Biomass makes the steam genuinely renewable and pairs with cheap northern
|
|
fuel, at the cost of higher capex, fuel logistics, ash, and an emissions
|
|
point
|
|
- The 60 rai tilts the economics and the story further toward biomass, but
|
|
only after the land-title check clears
|
|
- The electric boiler remains the alternative: cleanest permitting, no fuel
|
|
logistics, but effectively grid-powered steam at a ~300 kW draw. On
|
|
PEA's time-of-use tariff that costs ~4.7M to 5.5M THB a year at mature
|
|
load against ~0.6M to 1.2M of fuel for biomass, and ~1.4M to 1.7M
|
|
against ~0.15M to 0.3M at early load, because the demand charge follows
|
|
the boiler's full-power draw (estimates; see the
|
|
[grid tariff](sustainability.md#grid-tariff-pea-and-what-it-decides)).
|
|
The electric boiler is the more efficient machine; biomass is the far
|
|
cheaper heat
|
|
- A staged path is possible: start electric (fast, clean permitting), plant
|
|
the coppice now (first harvest in 2 to 4 years), and add the biomass
|
|
boiler at the automated-line expansion when demand and the fuel supply
|
|
have both matured. At the tariff above that is a permitting and logistics
|
|
choice, not a cost one: every year on electric steam costs roughly 1.1M
|
|
to 4.9M THB more than biomass, so the switch should come as soon as the
|
|
permit and a fuel contract are in place
|