New static page docs/make-a-record.html (test site /demos/make-a-record/): the artist platform as a customer would see it, polished for presenting. - five steps (design, music and art, price, fan funding, track) with a sticky stage: to-scale mock-up (record spins at 33 1/3 or 45 rpm on hover), spec chips, price per copy, ship month and the next action - design as option cards and swatches; options that do not apply stay visible and disabled (weight and gatefold off 12", colour pickers for black vinyl) - masters and artwork read in the browser as in the detailed demo, side bars per side, checks in plain words, approval 1 of 3 - price with the curve, itemised lines folded under one summary, lead time as two bars (approvals, then the 7 to 9 week quote) - fan funding: goal, break-even and what the artist keeps, money rules; the campaign on a phone with a pre-order ticker, funded or missed ends, production timeline with the artist's approvals, updates feed - record passport for one delivered copy (stamper, press, cycle time and side; stage dates; optical inspection and sampled audio), per traceability.md and quality-automation.md, IDs simulated; repress card - "Investor notes" switch with the business case per step (market research, vault, short-run economics and the Thai price gap, plant-owned vs broker and the Qrates lesson, traceability and represses); guided tour of about a minute (#tour, #notes in the URL) - light/dark theme shared with the other pages; phone layout with a bottom bar Same price list (demo-0.1) and stage table as artist-order.html, so the defaults reproduce the artist platform example: 37,836 THB per title, 232 THB per copy at 100, break-even 41, goal 100, 548 THB kept a copy. artist-platform.md: investor demo paragraph. traceability.md: the record passport as the per-copy customer view. README bullet and layout line, site DEMOS line and landing-page entry.
3.8 KiB
Process Logging and Traceability
Every step of production is logged continuously, so that every record is traceable end to end for the customer. This is a set requirement, and it is the core specification for the factory software this repository will eventually host.
It is also the part of the plan the industry responds to. At Making Vinyl Europe 2026 most people the team talked to were strongly interested in it, and Sibert's representative named it as a reason to work with a newcomer he would otherwise have advised against building a plant; buildfor.life's development and data work settled the question for him (see the exhibitor briefing).
What a customer can trace
For any order, the customer can follow the full chain:
- Audio intake: file received, checksums, versions, who handled it, approval trail
- Mastering: session log, engineer, settings, customer approvals
- Cutting: lacquer IDs, lathe parameters, stylus used, inspection result
- Galvanics: silvering and plating batch IDs, bath chemistry logs, father/mother/stamper genealogy (which stamper came from which mother from which father), or the external stamper supplier and batch if bridged
- Pressing: press ID, operator, shift, mold and stamper IDs, cycle parameters (temperatures, pressures, cycle times), PVC compound lot and virgin/recycled mix, label lot
- Quality control: test pressing approvals, inspection results, reject counts and reasons (the automated instrument layers feeding this are specified in quality automation)
- Finishing and packaging: trimming, sleeving, carton lot, packaging partner batch
- Fulfillment: warehouse location, shipment or dropshipping consignment, carrier tracking per end customer
Principles
- Log at the source: machine data comes from the machine (the presses and the plating rectifiers expose PLC data; the AD12 supports remote monitoring), not from manual transcription. Manual steps get simple operator check-ins, not paperwork.
- Batch and genealogy first: every physical artifact (lacquer, father, mother, stamper, press run, box) gets an ID, and every ID knows its parents. A customer complaint about one record resolves to a specific stamper, press, shift, and compound lot.
- Environment attached: the whole-factory HVAC monitoring (temperature, humidity, PM per zone) is logged on the same timeline, so any production window can be correlated with plant conditions.
- Immutable and retained: logs are append-only and retained for the life of the customer relationship; stamper genealogy is retained as long as the archive holds the metal parts.
- Customer-facing view: traceability is a product feature, not an internal file. Customers get a per-order view (portal or report) covering the chain above, without exposing other customers' data. The investor demo make a record shows the per-copy version a fan reaches from the code printed on the sleeve, the record passport: stamper, press, cycle time and side, with the stage dates and the inspection result (IDs simulated).
Open design work
- Data model for batch genealogy across all eight steps
- Which PLC/machine interfaces each vendor exposes (ask Newbilt, Pheenix Alpha, and Digital Matrix during procurement, before purchase)
- Retention, backup, and PDPA handling for operator-linked records
- Whether test-pressing approval workflows live in the same system from day one
This system should be specified alongside equipment procurement: machine data access is a purchasing requirement, not an afterthought. The systems that implement this specification (machines, networks, collectors, database, application) are planned in digital-factory.md.