Planned (October 2026, user): the archive in the office gets mobile archive shelving, A-Z Solutions (Vienna) as the reference (a-z-solutions.eu, checked October 2026: hand wheel or electric drive, lockable, rails need early floor planning; no published prices). facility-security.md, new section under Protecting the irreplaceable: what it holds (fathers and mothers, ~1,200 to 2,400 parts a year; a reference pressing per title only as a proposal), sizing estimates (about 0.2 kg per part, ~3 mm and ~75 kg per shelf metre; in the Payap office's ~4 x 5.75 m room two fixed runs, four double carriages and one aisle hold ~150 shelf metres, ~50,000 parts, 20+ years), what it asks of the building (ground slab at full rating, ~11 kN/m2 under the block; rails in the screed fixed before the floor finish; geared hand wheel; gas, climate, leak sensor, access control; barcoded box addresses), open points (quotes from A-Z and a Thai supplier, storage format from the galvanics vendors, fathers in a second compartment or off site). Mirrors: site-candidates.md (office ground floor), phase 1 RFQ (archive keeps the full slab rating if the slab is zoned), digital-factory.md (archive location as box and shelf position, sets per mother), equipment-suppliers.md (section 8 entry), total-investment.md added scope (to quote, not in the sum).
336 lines
20 KiB
Markdown
336 lines
20 KiB
Markdown
# Site Candidates
|
||
|
||
The site strategy is a long lease of raw land on which the purpose-built
|
||
plant is constructed (business plan section 6.1, built from
|
||
`business-plan/build/`). What any site has to offer is unchanged: ~4 rai
|
||
minimum and 6 to 8 rai with expansion, truck access and turning, room for
|
||
the cooling tower and a separated battery enclosure, a 500 to 1,000 kVA
|
||
medium-voltage connection, a slab rated 3 t/m² and a frame able to carry
|
||
the overhead crane ([scale](scale.md),
|
||
[crane, workshop and tours](crane-workshop-tours.md)), factory permission
|
||
for pressing with a steam boiler, and, for Phase 5, permission for an
|
||
electroplating line ([galvanics and stamper prep](equipment/galvanics.md)).
|
||
|
||
## The three candidates
|
||
|
||
| | Mueang Chi, Lamphun | Northern Region Industrial Estate, Lamphun | Payap University land, Chiang Mai |
|
||
|---|---|---|---|
|
||
| Status | Working candidate: the massing model, PV roof design and [construction RFQ](finance/phase1-construction-rfq.md) are sited here | Fallback | New lead (October 2026): the university approached the project and is interested in leasing land to us. The point it gave fails zoning (checked 14 October 2026); other Payap land not yet checked |
|
||
| Lessor | Private owner | IEAT | Payap University (private, non-profit, founded by the Foundation of the Church of Christ in Thailand) |
|
||
| Plot | 5-0-66.5 rai, 18.4708 N, 98.9642 E, narrow and skewed | Leased estate plots | Point given: 18.7977 N, 99.0383 E; parcel boundary, size and title not yet known. The main (Mae Khao) campus is at 18.795 N, 99.033 E |
|
||
| Distance to Chiang Mai old city | ~35 km | Lamphun valley | ~5 km east, on the Chiang Mai–Lampang superhighway |
|
||
| Zoning for factory use | Unverified (agricultural land) | Industrial estate; licensing through the estate | At the point given: zone ย.7-1, very high density residential, record pressing not permitted (Chiang Mai city plan, 25 May 2026) |
|
||
| Galvanics effluent | Ours to permit; zero discharge | Shared central effluent treatment | Needs the lessor's consent on top of the permit |
|
||
| Neighbours | Agricultural | Industrial | A pharmaceutical facility under construction on the same land |
|
||
|
||
## Payap University (new lead, October 2026)
|
||
|
||
**What we know from the conversation:** Payap University is interested in
|
||
leasing land to the project, and a pharmaceutical facility is under
|
||
construction on the same land. The plot, its size, the title, the term and
|
||
the rent are not known yet.
|
||
|
||
**Public facts.** Payap's main campus, Mae Khao, is at 272 Moo 2, San
|
||
Phranet, San Sai district, on the Chiang Mai–Lampang superhighway. The
|
||
university bought it in 1974 as about 120 acres of low-lying land and has
|
||
since grown it to about 275 acres (~700 rai) with purchases across the ring
|
||
road (Payap's own history page). Its Faculty of Pharmacy put the
|
||
construction of a cosmetics production facility and co-working space out to
|
||
tender in July 2024, and the university has announced a centre for
|
||
producing active compounds from cannabis and medicinal plants by bioreactor
|
||
(RPAH) with an industry sponsor. Whether either of these is the
|
||
pharmaceutical facility on the offered land is to be confirmed.
|
||
|
||
**Zoning at the point Payap gave (checked 14 October 2026).** The point
|
||
18.797678 N, 99.038272 E on the
|
||
[DPT land-use plan map](https://landuseplan.dpt.go.th/map/search?searchType=5&utmType=latlong&lat=18.797677976892462&long=99.0382715469577)
|
||
lies in zone **ย.7-1, very high density residential**, of the **Chiang Mai
|
||
comprehensive city plan in force from 25 May 2026**. The zone allows
|
||
housing, government institutions, utilities and other uses, buildings up to
|
||
23 m, a floor area ratio of 6:1 and 70 % site coverage. It prohibits every
|
||
factory under the Factory Act except the types listed in the plan's annex,
|
||
and it prohibits warehouse and silo businesses. The annex, read for this
|
||
zone:
|
||
|
||
- **Type 107** (CD production; its definition names gramophone records and
|
||
recorded tapes) is not permitted here. The plan permits it only in the
|
||
low density residential, special industrial, agricultural land reform and
|
||
rural and agricultural zones.
|
||
- **Type 72** (radio, sound recording, record players and gramophone
|
||
records) is allowed here only for modification or repair, not production.
|
||
- Plastics products and metal plating are not on this zone's list at all.
|
||
What is listed is small trades: bakeries, printing, musical instruments,
|
||
packing, repair shops.
|
||
|
||
So a record-pressing plant cannot get a factory licence at that point,
|
||
whichever of these types the Department of Industrial Works applies.
|
||
Caveats: a point query does not show the parcel's boundary, and a large
|
||
campus parcel can cross zones; the DPT site says its data is preliminary
|
||
and not a legal reference, so the provincial public works and town planning
|
||
office confirms; and the pharmaceutical facility under construction may sit
|
||
in another zone, hold another factory type, or predate the plan, which is
|
||
worth asking. Because the same plan permits type 107 in its low density
|
||
residential and rural and agricultural zones, other Payap land (the
|
||
purchases across the ring road) is worth checking before the lead is
|
||
dropped. Source record with the zone's full rules and annex:
|
||
[land-listings/payap](land-listings/payap/dpt-zoning-2026-10-14.md).
|
||
|
||
**Why it is worth pursuing.**
|
||
|
||
- **Location.** About 5 km from the old city and 25 to 30 km nearer the
|
||
team, customers and the airport than Mueang Chi. The
|
||
[visitor corridor](crane-workshop-tours.md), the
|
||
[artist platform](artist-platform.md) and hiring all work better in town.
|
||
- **A partner, not only a landlord.** Payap also wants to build new
|
||
student programmes with us in audio engineering (mastering, lathe
|
||
cutting), IT and business administration; that strand has its own page,
|
||
[Payap partnership](payap-partnership.md). Its Faculty of Pharmacy has
|
||
analytical labs that could back the PVC material lab
|
||
([quality automation](quality-automation.md)), and a formal university
|
||
collaboration is the kind of R&D and skills cooperation the
|
||
[BOI](boi.md) merit measures reward; confirm which measure applies.
|
||
- **Production is already being built there.** If the pharmaceutical
|
||
facility has factory permission, the land may already have a path
|
||
through licensing and a medium-voltage supply nearby. Shared
|
||
infrastructure (MV connection, RO water, effluent treatment) is worth
|
||
asking about.
|
||
|
||
**What could rule it out** (check in this order, before any design work):
|
||
|
||
1. **Zoning.** Failed at the point Payap gave (zone ย.7-1, above). For any
|
||
other plot: its zone in the Chiang Mai comprehensive city plan and whether it allows a record-pressing factory with a steam boiler and,
|
||
later, electroplating. A pharmaceutical or cosmetics plant and an
|
||
electroplating line are different factory classes, so the neighbour's
|
||
permit proves little. Ask the provincial public works and town planning
|
||
office, as for Mueang Chi.
|
||
2. **Can the university lease to a company?** Title type (Chanote needed),
|
||
university council approval, and whether campus land of a private
|
||
higher-education institution carries restrictions on commercial leases.
|
||
This is a question for Thai counsel, together with the lease terms the
|
||
business plan already requires (registered 30-year lease with renewal,
|
||
building ownership, mortgageable).
|
||
3. **The pharmaceutical neighbour.** A GMP facility is sensitive to dust,
|
||
smoke and fumes. Ours: the boiler stack (biomass smoke next to a
|
||
pharmaceutical plant in town would be a hard sell, which favours
|
||
electric or LPG steam; see [biomass](biomass.md)), galvanics extraction,
|
||
PVC extrusion fumes, press noise and truck traffic. Agree emission and
|
||
buffer rules in the lease rather than after the first complaint.
|
||
4. **Flooding.** Payap describes the Mae Khao land as low-lying when bought.
|
||
Check the plot against the 2024 flood extents; the design's floor, 1.2 m
|
||
above ground for the loading docks, helps but is not a flood
|
||
assessment.
|
||
5. **Plot fit.** Shape and size against the 60 × 25 m building, the
|
||
detached utility yard and the phase 2 footprint (6 to 8 rai). The
|
||
Payap scenario model below needs a 150 m square (14.1 rai) as drawn,
|
||
with room for ten more Classics, a colour store and a reserve.
|
||
6. **Galvanics on a campus.** Phase 5 electroplating needs the lessor's
|
||
written consent; the zero-discharge design
|
||
([sustainability](sustainability.md)) becomes a lease condition, not
|
||
only a commitment.
|
||
|
||
**Questions for the next meeting with Payap:** which plot (map, size,
|
||
title deed number), its zoning and current use; what the pharmaceutical
|
||
facility is, who operates it and when it opens; what utilities it brings
|
||
(MV, water, wastewater); lease term, rent, renewal and building ownership;
|
||
what collaboration the university wants in return.
|
||
|
||
Nothing has been re-sited. The parametric model, PV roof study, RFQ and
|
||
the fleet site code `lpn` in the [digital factory](digital-factory.md)
|
||
stay on Mueang Chi until a Payap plot is known and has passed checks 1
|
||
and 2. The point Payap gave on 14 October 2026 fails check 1.
|
||
|
||
### Payap scenario model (October 2026)
|
||
|
||
To see the plant on Payap land before a plot is known, a separate
|
||
parametric BIM model sites it on a simple square plot:
|
||
[cnx_vinyl_parametric_payap.FCStd](cnx_vinyl_parametric_payap.FCStd)
|
||
(top view [PNG](cnx_vinyl_parametric_payap.png),
|
||
[isometric](cnx_vinyl_parametric_payap-iso.png)), built in FreeCAD 26.3
|
||
from BIM walls, slabs, columns, stairs, spaces and equipment. Every size
|
||
and position hangs off its `Params` spreadsheet (plot side, setbacks,
|
||
floor level, building sizes, fire wall and crane lines, upper floor
|
||
level, office and water treatment gaps), so the square can be swapped for
|
||
the real plot once Payap names one. It is a layout sketch: every position
|
||
and every equipment envelope is an estimate.
|
||
|
||
- **Plot**: 150 × 150 m (22,500 m², 14.1 rai), road assumed on the south
|
||
side, 6 m setbacks (placeholder). That is about twice the 6 to 8 rai of
|
||
[scale](scale.md): the factory keeps room for ten more Classics and a
|
||
colour store, and the plot keeps a reserve in front for a second hall
|
||
or a PV field.
|
||
- **Factory, production floor only**: 128 × 25 m at floor level +1.2 m,
|
||
16 frame bays, in process order along a 98 m glazed visitor corridor.
|
||
From west to east:
|
||
- staff entry (PPE, WC);
|
||
- workshop and spares, with the machine door and a 12 m vehicle ramp
|
||
at the north-west corner;
|
||
- the galvanics clean room with a chemical day store, open to stamper
|
||
prep (no wall between them);
|
||
- PVC lab, regrind and conveying, the electrical room;
|
||
- the colour store;
|
||
- the press hall;
|
||
- the two-storey finishing and print block;
|
||
- behind the fire wall at 106 m, the warehouse and dispatch with two
|
||
dock doors.
|
||
|
||
Inside it:
|
||
- **Colour store** (~180 m²): pallet racking for the tens of colours
|
||
that special designs need, about 100 positions on four levels
|
||
(estimate), with weighing and mixing and a vacuum conveying station
|
||
([pressing line](equipment/pressing-line.md)).
|
||
- **Press hall** (~870 m²): two Duplex systems, each two HRP 12 presses
|
||
with an EX 50 and an EX 35, the Classic, and ten more Classic
|
||
positions in two rows. Each Duplex is one operator's cell of about
|
||
5 × 3 m at Newbilt's machine sizes: presses either side turned
|
||
towards the operator, the extruders behind him, one trimmer in front
|
||
([pressing line](equipment/pressing-line.md)).
|
||
- **One shared hydraulic and compressed-air supply**: a central plant
|
||
room (~62 m²) at the west end of the press hall, and a service trench
|
||
along the press rows for the hydraulic ring main, compressed air,
|
||
steam and cooling water.
|
||
- **Finishing and print block**, 14 × 25 m on two levels, beyond the
|
||
end of the crane runway
|
||
([plans](cnx_vinyl_parametric_payap-block.png)).
|
||
- Ground floor: trim and optical inspection, the QC lab, and
|
||
packaging (~170 m²) with packing tables, shrink wrap and a pallet
|
||
wrapper next to the fire shutter into the warehouse.
|
||
- Upper floor at +3.8 m: a print room kept in reserve (in-house
|
||
printing is not decided; jackets come from a print partner today,
|
||
[production timeline](production-timeline.md)), the print stock
|
||
(paper, board) and the packaging materials (sleeves, inner bags,
|
||
mailers, cartons).
|
||
- A stair and a goods lift connect the floors. Heavy compound stays
|
||
on the ground floor.
|
||
- The workshop (~200 m²) is fully equipped, with 3D printers, a lathe
|
||
and a small CNC mill among the tools
|
||
([crane, workshop and tours](crane-workshop-tours.md)).
|
||
- The 5 t crane runs from the west wall to the end of the press hall.
|
||
- **PVC silos** (proposed), outside on the north side of the lane:
|
||
- two for black, two for standard colours, ~50 m³ each (estimate);
|
||
- a big-bag filling station;
|
||
- buried conveying lines to the colour store.
|
||
- **Water treatment building**, separate, 12 × 10 m at ground level
|
||
directly behind galvanics: zero-discharge effluent treatment, the DI
|
||
water plant and the chemical store. A buried duct carries the effluent
|
||
by gravity from the galvanics floor, and a covered crossing (6 m clear
|
||
for trucks) joins the galvanics door
|
||
([galvanics](equipment/galvanics.md)).
|
||
- **Office building, isolated from the factory floor**: 32 × 15 m on two
|
||
storeys, ~960 m² of floor
|
||
([floor plans](cnx_vinyl_parametric_payap-office.png)). It stands 12 m
|
||
south of the factory on its own slab and structure, joined by a covered
|
||
link that lands at the start of the visitor corridor. A stair and a lift
|
||
connect the floors.
|
||
- Ground floor, for staff and the studio: reception and lobby, a canteen
|
||
for about 40 with its kitchen, changing rooms for women and men with
|
||
four showers each, toilets, mastering and cutting with an inner
|
||
acoustic lining, the listening room and the archive (mobile shelving
|
||
on the ground slab, [facility security](facility-security.md#archive-room-mobile-shelving)).
|
||
Staff change here
|
||
before crossing to the factory, whose staff entry keeps only PPE and a
|
||
WC.
|
||
- First floor: the offices (~150 m²), a meeting and training room (the
|
||
[Payap programmes](payap-partnership.md)), a meeting room, the IT and
|
||
server room, toilets, a pantry, and a flexible room for a second
|
||
classroom or more offices.
|
||
- The lathe sits on the ground slab, away from press vibration and
|
||
outside the crane zone.
|
||
- **Utility yard** behind the press hall, across a 6 m lane:
|
||
- boiler house with chimney and a covered fuel store;
|
||
- chiller and cooling tower;
|
||
- a raw water tank (5 m × 3 m, as in the phase 1 RFQ);
|
||
- PEA transformer;
|
||
- a pipe bridge that drops into the service trench.
|
||
|
||
Boiler, chiller and transformer are drawn at the one-Duplex sizes. They
|
||
need re-sizing for five presses, and again if the Classics are added
|
||
([scale](scale.md)).
|
||
- **Fire water** at the front, reachable from the frontage without
|
||
entering the production yard
|
||
([facility security](facility-security.md#fire-water-supply)): a
|
||
9 m × 4 m tank (~200 m³ usable, planning figure) on a ring foundation,
|
||
with a pump house for the duty (electric), standby (diesel) and jockey
|
||
pumps. The model's 6 m warehouse racking and its larger buildings will
|
||
raise the volume; the hydraulic design sets it.
|
||
- **Access**:
|
||
- one main gate on the south side, as in the
|
||
[phase 1 RFQ](finance/phase1-construction-rfq.md): piers and two 5 m
|
||
sliding leaves, 10 m clear;
|
||
- the guard house beside it on the gate's north-west side, 4 × 3 m with
|
||
a WC and air conditioning, and a boom barrier just inside the gate
|
||
that car and truck traffic both pass;
|
||
- an 8 m gate road to a truck apron and dock face in front of the dock
|
||
doors. The apron is 32 m deep, about twice the 16.5 m of an
|
||
articulated truck reversing to a dock (estimate), and joins the
|
||
service road round the east end. That makes ~2,150 m² of heavy-duty
|
||
paving, against 1,608 m² for apron, dock face and internal road in
|
||
the Mueang Chi RFQ;
|
||
- an access road runs along the south boundary to the car park, with
|
||
a footpath to the office;
|
||
- a lane behind the factory serves the yard, the silos, the water
|
||
treatment building and the ramp. The low-loader's swept path at the
|
||
ramp still needs checking.
|
||
- **Area**: about 3,200 m² of factory plus a 350 m² upper floor, a 480 m²
|
||
office footprint (~960 m² on two floors) and 120 m² of water treatment:
|
||
~3,800 m² under roof plus the boiler house, and ~4,630 m² of floor.
|
||
That is about twice the 1,400 to 2,000 m² of the [scale](scale.md) zone
|
||
table, which held one Duplex and an automated zone with the offices
|
||
inside.
|
||
- Most of the difference is the press hall with its expansion floor,
|
||
the colour store and the finishing and print block.
|
||
- Warehouse and dispatch (~530 m²) are drawn above that table's 300 to
|
||
500 m² for packaging and finished goods.
|
||
|
||
All of it is an estimate to settle against the real plot.
|
||
|
||
### Roof, PV and parking canopies (Part and Draft model, October 2026)
|
||
|
||
A second model of the same scenario,
|
||
[cnx_vinyl_parametric_payap_parts.FCStd](cnx_vinyl_parametric_payap_parts.FCStd)
|
||
([isometric](cnx_vinyl_parametric_payap_parts.png),
|
||
[top view](cnx_vinyl_parametric_payap_parts-top.png)), is built from plain
|
||
Part solids and Draft (arrays, labels, dimensions) instead of BIM objects,
|
||
on the same `Params` sheet, and adds the roof, the PV and the parking
|
||
canopies. Module counts are expressions on the sheet (`pv_roof_n`,
|
||
`pv_cp_n`, `pv_kwp`), so the drawing and the kWp change together when a
|
||
parameter does.
|
||
|
||
- **Roof**: monopitch at 10° with the low eave (7.0 m) on the south side
|
||
and the high side 11.4 m above the floor on the north, the geometry of
|
||
the [phase 1 RFQ](finance/phase1-construction-rfq.md) and the
|
||
[sustainability](sustainability.md) roof study. On this plot (road
|
||
assumed south) the whole field faces south; once Payap names a plot,
|
||
its bearing sets the azimuth and the yield derate. The fire wall rises
|
||
with the roof, 0.5 m above it.
|
||
- **Rooftop PV**: 901 modules of the generic 580 W placeholder, ~523 kWp,
|
||
in 17 rows (blocks of four with a walkway, 1 m edge strip, as in the
|
||
sustainability study): 45 columns west of the fire wall and 8 east of
|
||
it, with 2.5 m of roof kept clear over the wall (estimate; check the
|
||
Thai code and the insurer).
|
||
- **Parking canopies**, both in the car park clear of the footpath:
|
||
- car canopy, 10 bays, 27.7 × 7.0 m at 4.1 m: 72 modules;
|
||
- scooter canopy, 30 spaces, 13.7 × 5.5 m at 3.5 m: 22 modules.
|
||
|
||
Together ~54 kWp. Covering the canopies fully gives more than the
|
||
~40 kWp the RFQ states. The RFQ heights are read as the high side; at
|
||
the 10° tilt used for self-cleaning (estimate for the canopies) the low
|
||
side clears 2.9 m (cars) and 2.5 m (scooters).
|
||
- **Total ~577 kWp**: at 1,400 to 1,500 kWh/kWp/yr that is about 810 to
|
||
870 MWh a year before any azimuth derate, roughly 55 to 85 % of the
|
||
1,000 to 1,500 MWh mature two-shift use ([scale](scale.md)). Three
|
||
things follow before this size is fixed:
|
||
- at midday the array can exceed the plant's load (weekends, single
|
||
shift), so PEA's export terms decide whether the surplus is sold or
|
||
curtailed;
|
||
- the 271 kWh battery is sized for ride-through, not to absorb it;
|
||
- the BOI solar measure caps eligible spend per MW ([BOI](boi.md)).
|
||
|
||
FreeCAD 26.3.0 RC1 does not pass a cell edit on to the parts that read
|
||
the cell (a normal recompute updates only the sheet). After editing
|
||
`Params`, run the macro [CNX_apply_Params.FCMacro](CNX_apply_Params.FCMacro)
|
||
(copy it to the FreeCAD macro folder): it touches every object that reads
|
||
the sheet and recomputes. Tested with factory length, roof pitch, car bays
|
||
and walkway width; the drawn module count matches the sheet each time.
|
||
|
||
The Mueang Chi model and everything sited on it stay as they are.
|