User, 18 Oct 2026: create a setup for the inline optical QC, an aluminium extrusion frame with all sensors and a conveyor mounted to it. - docs/equipment/inline-qc-station/: FreeCAD script (build_station.py) and model (.FCStd) of one station, 1.9 x 0.65 x 1.5 m on 27 m of 40x40 and 3.8 m of 40x80 profile: rim-belt conveyor (two 6 mm PU round belts under the unrecorded rim, open centre), label gate with top and bottom colour cameras on the fly, inspection position with a lift and rotate chuck (75 mm lift, expanding mandrel, belt-driven servo), top and bottom 4k line-scans on opposite radii with coaxial, dark-field and backlights, two warp lasers, optional thermal camera, light-tight black tunnel with door switch, rodless-cylinder reject pusher with chute and bin, outfeed stop, cabinet, PLC, NixOS edge PC, HMI, stack light. - render_station.py renders six views (open and closed iso, front, plan, inspection detail and elevation via clipped temporary documents). - inline-qc-station-bom.csv: 32 lines with sources; USD 16k to 33k per station without the thermal camera. - inline-optical-qc.md: new section "The station setup" (flow table, inspection zone, cycle ~5 to 6 s, control, BOM by group, open points); cost table updated (two launch stations ~USD 50k to 105k, still inside the metrology launch tier); Duplex/Classic flow now via the conveyor. - README bullet and tree.
378 lines
25 KiB
Markdown
378 lines
25 KiB
Markdown
# Inline optical QC: devices for the record inspection station
|
||
|
||
Research note, October 2026. This note works out which devices can do
|
||
layer 1 of [quality automation](../quality-automation.md#layer-1-100-optical-inspection-inline),
|
||
the optical check of every pressed record. Prices come from vendor shops,
|
||
vendor pages or third-party listings, and the source is named each time.
|
||
Anything without a source is marked as an estimate. Nothing here is a
|
||
quote.
|
||
|
||
**Short answer.** Nobody sells a vinyl inspection machine. The template
|
||
is the CD and DVD in-line scanner: spin the disc once under a line-scan
|
||
camera that looks along the radius, with angled lights, and measure the
|
||
height with lasers during the same turn. That can be built from standard
|
||
parts:
|
||
|
||
- a 4k line-scan camera per side, with dark-field and bright-field lights;
|
||
- a colour area camera per side for the label;
|
||
- two laser distance sensors for warp;
|
||
- a servo turntable with a centring chuck;
|
||
- an edge PC running open-source vision software on NixOS.
|
||
|
||
The hardware costs about USD 16k to 33k per station (bill of materials,
|
||
partly estimates). The launch plant needs two stations, one for the Duplex
|
||
cell and one for the Classic. A concept model of the station, an aluminium
|
||
profile frame with a rim-belt conveyor and all sensors mounted to it, is
|
||
in [the station setup](#the-station-setup-frame-conveyor-and-sensors).
|
||
|
||
## What the station has to catch
|
||
|
||
| Defect | How it shows optically | Device | Limit or source |
|
||
|---|---|---|---|
|
||
| Non-fill (PVC did not fill the stamper) | dull, matte patches in the groove band, most often at the outer edge of 180 g records ([AnalogPlanet](https://analogplanet.com/content/what-non-fill-looks)) | line-scan camera, low-angle (dark-field) light | any patch; correlates with audible defects |
|
||
| Stitching and flow lines | lines or streaks in the groove sheen | same | any visible line |
|
||
| Bubbles, inclusions, black specks | dark or bright points; in clear and translucent colours seen best in transmitted light | line-scan with a back light | size threshold set in trials |
|
||
| Debris, scratches, scuffs | bright points or lines in dark-field, dark in bright-field | both lights | size threshold set in trials |
|
||
| Edge trim (burr, wrong diameter) | the record edge in the line-scan image | line-scan | trim drawing |
|
||
| Label wrong, on the wrong side, off-centre, wrinkled, bubbled, misprinted | colour image of the label against the approved artwork from the order | colour area camera, ring or dome light | artwork in ERPNext |
|
||
| Off-centre hole (eccentricity) | the groove band edges trace a sine wave in the unwrapped image when the hole sits off the spiral centre | line-scan, fit of the lead-in and the finishing groove | 0.2 mm hole to groove spiral (IEC 98-1987, DIN 45547-1981, as [tabulated here](http://www7a.biglobe.ne.jp/~yosh/standards_table.htm)); Stamper Discs aims below 0.1 mm on the record and 0.05 mm on the stamper ([Stamper Discs, 2025](https://www.stamperdiscs.com/the-physical-attributes-of-a-stamper-eccentricity/)) |
|
||
| Centre hole size | hole diameter in a backlit image, or a go/no-go mandrel | area camera (optional) | 7.24 mm, -0/+0.09 mm (same table) |
|
||
| Warp: edge run-out and dish | height change over one turn | two laser distance sensors, or one laser line profiler | Mobineko rejects above 0.5 mm (black), 1.0 mm (colour) or 1.5 mm (special effects) edge run-out per turn, or above 2 mm (black) or 3 mm (colour) between edge and centre ([Mobineko](https://mobineko.com/vinyl-quality-standards)) |
|
||
| Colour off the approved test pressing | colour values against the first approved records of the job | calibrated colour camera | tolerance set per job |
|
||
| Record temperature at unload (process signal, optional) | temperature map | thermal camera | trend against warp |
|
||
|
||
No camera can see a wrong master cut into good-looking grooves, or clicks
|
||
from defects smaller than its resolution. Those stay with the sampled
|
||
audio comparison (layer 3). Optical and audio checks complement each other.
|
||
|
||
## Who does this already
|
||
|
||
- **No vinyl product.** A search in October 2026 found no inline
|
||
inspection machine for vinyl records on sale. The presses do not offer
|
||
one either. The Newbilt Classic's feature list stops at automatic
|
||
unloading, the spindle stack, cycle recording and OPC UA
|
||
([Newbilt Classic](https://vinyl-pressing-plants.com/blog/newbilt-classic-12-inch-vinyl-record-press)).
|
||
- **CD and DVD lines had it, and that is the template.** Dr. Schenk's ISM
|
||
in-line scanner ([brochure, 2007](https://www.drschenk.com/fileadmin/user_files/brochures/13-other_applications/optical_media_inspection/ism_inline_scanner.pdf)):
|
||
- a 2048-pixel, 12-bit line-scan camera with LED lights;
|
||
- one turn in 600 ms or less, 20 µm radial resolution;
|
||
- radial and tangential disc deformation measured at 1,000 points;
|
||
- a defect classifier, on embedded Linux.
|
||
|
||
Basler began in this market in 1990 for PolyGram in Hanover
|
||
([IMVE](https://imveurope.com/feature/caught-camera)) and sold the
|
||
optical-media business to Xiris in 2009
|
||
([Vision Systems Design](https://vision-systems.com/cameras-accessories/article/16747762/basler-sells-optical-media-business-continues-focus-on-camera-markets)).
|
||
A vinyl record is a bigger, black, grooved disc, but the method carries
|
||
over.
|
||
- **Precision Record Pressing (Ontario), 2023.** Their in-house AQA system
|
||
takes the first and second record of each order. Surface-scanning
|
||
cameras built into the lids of modified turntables scan both records,
|
||
then both are played in sync and compared with the master
|
||
([PRP](https://www.precisionpressing.com/blog/news-prp-announces-new-automated-quality-assurance-system)).
|
||
It works on samples and is not for sale, but it is the closest vinyl
|
||
precedent.
|
||
- **Czech Technical University, Prague.** A bachelor thesis built an
|
||
automated optical defect check for LPs in LabVIEW and ran lighting
|
||
experiments ([CTU thesis](https://dspace.cvut.cz/entities/publication/11505711-6ce1-4b87-904d-a1421d91cf9f)).
|
||
A 2018 paper from the same faculty identified defects with a wavelet
|
||
method and classified them with KNN, and got 57 % of records right
|
||
([CTU, 2018](https://starfos.tacr.cz/en/vysledky-vyzkumu/RIV%2F68407700%3A21230%2F18%3A00321872)).
|
||
- **Plants check by hand today.** Mobineko measures flatness with a
|
||
micrometer gauge and a laser level on a modified turntable
|
||
([Mobineko](https://mobineko.com/vinyl-quality-standards)). Third Man
|
||
checks flatness and label orientation by eye as records leave the press
|
||
([WIRED](https://www.wired.com/video/watch/how-vinyl-records-are-made-with-third-man-records)).
|
||
|
||
## The station
|
||
|
||
**How it works.** The record goes onto a centring chuck: a mandrel
|
||
expands in the 7.24 mm hole and a ring supports the label area. A servo
|
||
turntable with an encoder turns it once in about 1 s. Both sides are
|
||
imaged during that one turn, one camera set above and one below. The
|
||
lights are strobed on alternate lines, so the same turn gives a
|
||
dark-field, a bright-field and a transmitted-light image. Stacking line
|
||
images from one turn into one picture is standard multi-light line-scan
|
||
practice (estimate for this application; to prove in trials). The PC
|
||
unwraps each image into a strip of radius against angle, which makes
|
||
rings straight lines and an off-centre hole a sine wave.
|
||
|
||
| Function | Device, per side unless noted | Examples | Price signal |
|
||
|---|---|---|---|
|
||
| Surface | 4k monochrome line-scan camera along the radius, with a lens, plus a dark-field and a bright-field line light | Basler racer 2 r2L4096 (GigE, 14 to 29 kHz); Hikrobot MV-CL042-91GM (GigE, 4096 × 7 µm pixels, 28 kHz, 80 kHz in high-bandwidth mode, GenICam, Linux; [datasheet](https://www.innosmart.bg/en/catalog/product/by-id/MV-CL042-91GM)); Cognex In-Sight 3800 Line Scan (smart camera, 4K at 84 kHz, encoder inputs, AI tools on board; [specs](https://www.cognex.com/products/machine-vision/2d-machine-vision-systems/in-sight-3800-line-scan/specifications)) | Basler 4k GigE line-scan from USD 857 to 1,088 in Basler's web shop ([price listing](https://cards.keenable.ai/w/01a14ab8-9648-7191-8286-bc5956857428)); lens USD 300 to 800 and line lights USD 500 to 1,500 each (estimates) |
|
||
| Transmitted light | a diffuse line light under the record for the top camera | any line-light maker | USD 500 to 1,500 (estimate) |
|
||
| Label | 5 to 8 MP colour area camera with a ring or dome light | Basler ace 2 a2A2840-14gcPRO | USD 1,119 (Basler web shop, same listing) |
|
||
| Warp, simple | two laser distance sensors under the record, at the outer edge and at mid radius | Micro-Epsilon optoNCDT 1420 | from EUR 470 list ([Micro-Epsilon](https://www.micro-epsilon.com/insights/optoncdt-1220-1320-1420/)); ILD1420-25 about USD 1,600 at a reseller ([Radwell](https://www.radwell.ca/Buy/MICRO%20EPSILON/MICRO%20EPSILON/ILD1420-25)) |
|
||
| Warp and thickness, full map (alternative) | laser line profiler across the radius, giving a full height map | Keyence LJ-X8000 (warpage and flatness tools, compensates eccentricity; [Keyence](https://keyence.com/products/measure/laser-2d/lj-x8000)); LMI Gocator 2500 (up to 10 kHz, blue laser; [LMI](https://lmi3d.com/2500-high-speed-3d-laser-profile-sensors/)); Micro-Epsilon scanCONTROL | no list price found; USD 8k to 20k (estimate) |
|
||
| Thermal (optional) | infrared camera over the unload position | Optris Xi 400 (80 Hz, line-scan mode) | from EUR 1,950 ([Optris](https://optris.com/products/thermal-cameras/compact-line/xi-400/)); USD 2,995 at a US reseller ([moviTHERM](https://movitherm.com/product/optris-xi-400-infrared-camera/)) |
|
||
| Compute | edge PC with a GPU, NixOS | any industrial PC | USD 2k to 4k (estimate) |
|
||
| Mechanics | servo turntable, centring chuck, encoder, frame, light shield, reject gate, stack light | local machine builder | USD 4k to 10k (estimate) |
|
||
|
||
**Resolution.** These are worked figures for a 160 mm field and a 4,096-pixel line:
|
||
|
||
- **Radial:** about 39 µm per pixel.
|
||
- **Along the groove, at 14 kHz and one turn per second:** about 66 µm per line at the outer edge (146 mm radius) and 22 µm at the label edge. At 28 kHz these halve.
|
||
- **What that sees:** millimetre-sized non-fill, flow lines and specks of about 0.1 mm and up. It does not resolve single grooves.
|
||
- **How defects show:** the camera sees how the groove field scatters light, so a defect has to change that scatter. That is why lighting trials come first, as in the CTU thesis.
|
||
|
||
**Eccentricity.** At the 0.1 mm target, the sine wave in the unwrapped
|
||
image is about 2.6 pixels high. A sub-pixel fit along the lead-in edge
|
||
and the finishing groove (106.4 ± 0.8 mm diameter in IEC 98) over about
|
||
14,000 lines should repeat within 10 to 20 µm. That figure is an estimate
|
||
and has to be shown in trials. The chuck has to centre on the hole
|
||
exactly, because the station measures the groove spiral against the
|
||
chuck.
|
||
|
||
**Throughput.**
|
||
|
||
| | Duplex cell | Classic |
|
||
|---|---|---|
|
||
| Output | a record every 15 to 20 s from its two presses (at 30 to 40 s per press; Newbilt quotes about 30 s, and the [fleet calculator](../fleet-calculator.html) takes 3 records a minute as 40 s) | a 180 g record every 28 s (Newbilt) |
|
||
| Station time per record | about 1 s of scan plus 2 to 3 s to load and unload (estimate) | same |
|
||
|
||
That leaves slack at both stations. One central station could in
|
||
principle take the launch plant's 5 to 6 records a minute. A station at
|
||
each cell needs no conveyor and catches a non-fill streak within a cycle
|
||
or two. The calculator's iso view draws a conveyor to one optical
|
||
station; that drawing is schematic.
|
||
|
||
## The station setup: frame, conveyor and sensors
|
||
|
||
A concept model of one station, drawn in FreeCAD from the script
|
||
[`build_station.py`](inline-qc-station/build_station.py) (views from
|
||
[`render_station.py`](inline-qc-station/render_station.py); model file
|
||
[`inline-qc-station.FCStd`](inline-qc-station/inline-qc-station.FCStd)).
|
||
It is a layout to take to a machine builder, not a fabrication drawing:
|
||
the profiles are drawn as plain 40 mm bars and the bought parts as their
|
||
outline boxes.
|
||
|
||

|
||
|
||
*Records run from the infeed (back left, a translucent red special on
|
||
the belts) through the light-tight tunnel to the reject pusher and the
|
||
outfeed stop (front right). The cabinet sits under the outfeed, the
|
||
reject bin behind it.*
|
||
|
||
**Frame.** The frame is built from 40 × 40 mm 8-slot aluminium profile
|
||
(27 m in 37 pieces) on two 40 × 80 mm base beams, with eight levelling
|
||
feet. It is 1.9 m long, 0.65 m wide and 1.5 m high, plus the stack
|
||
light. The reject bin adds 0.4 m behind it. Records travel at 900 mm,
|
||
a normal working height.
|
||
|
||
The middle 0.8 m is a tunnel closed with black panels on all sides
|
||
(4.3 m²), because the line-scans need their own light only. The front
|
||
panel is a door with a safety switch. The records enter and leave
|
||
through low slots in the end walls. The reject zone has a clear polycarbonate guard.
|
||
All camera and light brackets clamp into the slots, so heights and angles
|
||
can be moved during the lighting trials.
|
||
|
||
**Conveyor.** Two 6 mm PU round belts run under the record's rim, 148.5 mm
|
||
from the centre line. That is outside the recorded area: a 12" record is
|
||
301.6 mm across and its grooves end at 292.6 mm at most (IEC 98, as
|
||
[tabulated here](http://www7a.biglobe.ne.jp/~yosh/standards_table.htm)).
|
||
The belt therefore touches only the raised edge that records are made to
|
||
stand on, never a groove. The centre stays open, so cameras and the chuck
|
||
can reach the record from below.
|
||
|
||
The belts run on UHMW slide strips and are driven by one shaft at the
|
||
outfeed end. Side guides with a flared mouth centre the record at the
|
||
infeed. Supported on two rim lines, a warm 180 g record sags about 1 mm
|
||
in the middle (beam estimate); the trials should confirm that this does
|
||
no harm. For 10" and 7" records the belt spacing moves in on a slide;
|
||
the model shows the 12" setting.
|
||
|
||
| Station | Position from the infeed end | What happens |
|
||
|---|---|---|
|
||
| Infeed | 200 mm | the operator (Duplex) or the unloader (Classic) puts the record down; a presence sensor starts the cycle |
|
||
| Label gate | 520 mm | both colour cameras flash the labels on the fly through the open centre (exposure about 20 µs, under 10 µm blur at 0.5 m/s); the top camera also reads the dead-wax code that ties the record to its stamper, and so to its press and cycle (readability to test, as in [digital factory](../digital-factory.md)) |
|
||
| Inspection | 880 mm | a through-beam on the leading edge stops the belts; the chuck lifts the record 75 mm off them (the pad waits below the belt plane), expands the mandrel in the 7.24 mm hole and turns it once in about 1 s |
|
||
| Reject | 1,320 mm | a pneumatic rodless cylinder on a bridge pushes a reject sideways by its edge onto a felt-lined chute at the back and into the bin |
|
||
| Outfeed | 1,715 mm | good records wait at a soft end stop; the station holds the next one while the outfeed is full |
|
||
|
||

|
||
|
||

|
||
|
||
**Inspection zone.** The record is shown lifted on the chuck. The two
|
||
line-scans look at opposite radii along the conveyor axis, because no
|
||
belt crosses that line:
|
||
|
||
- **Top camera:** reads the downstream radius, from 50 to 155 mm, from
|
||
330 mm above. A coaxial line light sits under it, two dark-field line
|
||
lights sit at 20° either side, and a diffuse backlight below the
|
||
record gives transmitted light for clear colours.
|
||
- **Bottom camera:** reads the upstream radius from below with the same
|
||
set of lights.
|
||
- **Bottom dark-field lights:** these sit outside the record's footprint,
|
||
above the rails, so the conveyed record passes them. They light the
|
||
underside at about 8°, true dark-field.
|
||
- **Warp lasers:** two lasers under the record trace circles at 90 and
|
||
130 mm radius during the turn.
|
||
- **Spindle drive:** the spindle servo's encoder clocks both line-scans
|
||
and the lasers.
|
||
- **Lift drive:** the lift is a guided pneumatic cylinder, and the
|
||
spindle is belt-driven from a servo set to the side. That keeps the
|
||
bottom camera's view cone clear, which the elevation shows.
|
||
- **Thermal camera (option):** hangs at the tunnel entry.
|
||
|
||
**Cycle per record (estimate).**
|
||
|
||
| Step | Time |
|
||
|---|---|
|
||
| Convey to the inspection position | 1.5 to 2.5 s |
|
||
| Lift and clamp | 0.5 s |
|
||
| One turn, with run-up and stop | 1.3 s |
|
||
| Lower | 0.3 s |
|
||
| Convey out, with a push if rejected | 1 to 2 s |
|
||
| **Total** | **about 5 to 6 s** |
|
||
|
||
A Duplex cell delivers a record every 15 to 20 s and the Classic one
|
||
every 28 s. The PC finishes the verdict while the record is lowered and
|
||
carried to the pusher.
|
||
|
||
**Control.** A small PLC (Mitsubishi FX5U or Delta class, both common in
|
||
Thailand) runs the conveyor, lift, mandrel, spindle and pusher, plus the
|
||
safety circuit (e-stop, door switch, safety relay). The NixOS edge PC
|
||
under the outfeed takes the four GigE cameras on PoE, the lasers and the
|
||
light controllers. It sends pass or fail with a reason to the PLC, and
|
||
the result string and images to the factory system (see
|
||
[digital factory](../digital-factory.md)). Utilities are 230 V single
|
||
phase at about 1 kW and 6 bar compressed air (estimates).
|
||
|
||

|
||
|
||

|
||
|
||

|
||
|
||
**Bill of materials.** The line-by-line list with sources is in
|
||
[`inline-qc-station-bom.csv`](inline-qc-station/inline-qc-station-bom.csv).
|
||
By group, per station:
|
||
|
||
| Group | USD | Main parts |
|
||
|---|---|---|
|
||
| Frame | 0.7k to 1.5k | 27 m of 40 × 40, 3.8 m of 40 × 80, brackets, feet |
|
||
| Enclosure and guards | 0.3k to 0.7k | black panels, polycarbonate, door switch |
|
||
| Conveyor | 0.5k to 1.4k | round belts, pulleys, slide strips, drive |
|
||
| Handling | 2.0k to 4.9k | guided lift cylinder, 200 W spindle servo, spindle head with mandrel, rodless cylinder, pneumatics |
|
||
| Vision | 7.7k to 12.5k | 2 line-scans, 2 colour cameras, lenses, 2 coaxial, 4 dark-field and 2 backlights, 2 ring lights, controllers |
|
||
| Sensors | 1.3k to 4.0k | 2 laser distance sensors, presence and stop sensors |
|
||
| Control | 3.5k to 7.8k | PLC, edge PC with GPU, HMI, safety, cabinet and wiring |
|
||
| **Total** | **16k to 33k (0.53M to 1.08M THB)** | thermal camera (USD 2.1k to 3.0k) not included |
|
||
|
||
**Open points for the machine builder.**
|
||
|
||
1. **Sag:** confirm that the rim-only support does not mark or bend warm
|
||
records.
|
||
2. **Static:** fresh PVC attracts dust, so an ionising bar at the infeed
|
||
may be needed. Otherwise the station counts dust it attracted itself.
|
||
3. **Classic hand-off:** where and how the Classic's unloader sets the
|
||
record down.
|
||
4. **Belt width:** a quick-change spacing for 10" and 7" records.
|
||
5. **Space in the cell:** check that the 1.9 m length fits the 5 × 3 m
|
||
Duplex cell next to the trimmer.
|
||
|
||
## Where it sits
|
||
|
||
- **Duplex cell.** The station sits after the edge trimmer, in front of
|
||
the operator, before the spindle. The flow per record:
|
||
1. The operator puts the trimmed record on the infeed conveyor.
|
||
2. A presence sensor starts the cycle.
|
||
3. A stack light and the HMI show green or red.
|
||
4. A reject is pushed into a bin, and the HMI shows the reason; a good
|
||
record waits at the outfeed for the spindle.
|
||
|
||
The operator still sees every record, so the visual check stays as it
|
||
is today.
|
||
- **Classic.** The Classic unloads by itself onto the spindle stack. Ask
|
||
Newbilt whether the unload handling can set the record down on the
|
||
station's infeed instead; a conveyor takes a record dropped within a few
|
||
millimetres, which is easier than hitting a chuck. If that does not
|
||
work, use a fixed area camera over the unload position. That covers
|
||
surface and label, and leaves warp and eccentricity to samples.
|
||
- **Warm records.** Records leave the press warm and settle in the stack;
|
||
24 hours of cooling is the usual practice
|
||
([Stamper Discs](https://stamperdiscs.com/horns-and-quality-issues-in-vinyl-record-pressing)).
|
||
The warp reading at the press is therefore an early warning. Release on
|
||
warp uses sampled cooled records, measured on a second station of the
|
||
same design in the QC lab.
|
||
|
||
## Two software routes
|
||
|
||
| | Smart camera or vendor controller | Open, PC-based |
|
||
|---|---|---|
|
||
| Examples | Cognex In-Sight 3800 with edge learning (about USD 8,500 a unit in a [third-party listing](https://robotomated.com/explore/manufacturing/cognex-insight-3800)); Keyence CV-X or XG-X with LumiTrax, which separates shape from surface pattern on shiny parts ([Keyence](https://www.keyence.com/landing/vision/lumitrax-lighting.jsp)); CV-X controllers listed at about USD 5,400 to 5,500 on resale sites ([BigGo](https://biggo.com/s/cv-x%20keyence)); Keyence quotes only locally | GenICam cameras (Basler, Hikrobot, or Keyence's VJ series) with:<br>- Aravis for acquisition (LGPL-2.1, GigE Vision and USB3 Vision, packaged in nixpkgs as 0.8.35; [GitHub](https://github.com/AravisProject/aravis), [MyNixOS](https://mynixos.com/nixpkgs/package/aravis)), or Harvester (Apache-2.0, needs the camera maker's GenTL producer; [GitHub](https://github.com/genicam/harvesters));<br>- OpenCV;<br>- anomalib for learned defect detection (Apache-2.0, PatchCore and others; [PyPI](https://pypi.org/project/anomalib/)) |
|
||
| For | fast set-up, vendor support, tested tools | we own the code and the data, no licence per unit, fits the NixOS stack and the service offer to other plants ([digital factory](../digital-factory.md)) |
|
||
| Against | closed, Windows set-up tools; the polar unwrap, eccentricity fit and per-job learning still have to be built on top | we build and maintain it; the first station takes longer |
|
||
|
||
Keyence's VJ series sits between the two. It sells Keyence GigE cameras
|
||
and LumiTrax lights for PC-based software, with GenICam, OpenCV and
|
||
HALCON listed as supported
|
||
([Keyence VJ](https://keyence.com/ss/products/vision/vj)).
|
||
|
||
Recommendation: take the open route for the station itself. Before that,
|
||
ask Keyence Thailand for its free demo and test report on sample records
|
||
with LumiTrax. It costs nothing, teaches us the lighting, and gives a
|
||
benchmark for our own result.
|
||
|
||
## Colour and special records
|
||
|
||
Specials are planned at 60 % or more of output, and they are the hard
|
||
part:
|
||
|
||
- **Marbled and splatter:** the pattern is random, so a fixed golden image
|
||
cannot work. The model learns each job from its first approved records
|
||
and flags what differs. That is few-shot anomaly detection, for example
|
||
PatchCore in anomalib, with the operator confirming the first flags.
|
||
- **Clear and translucent colours:** transmitted light shows bubbles and
|
||
specks well.
|
||
- **Picture discs:** they need the label-style print comparison over the
|
||
whole face.
|
||
- **Black:** the easiest.
|
||
|
||
Expect more false rejects on specials in the first months (estimate). The
|
||
reject rates in the [factory console](../factory-console.html) demo are
|
||
simulated.
|
||
|
||
## Cost
|
||
|
||
| Item | Estimate |
|
||
|---|---|
|
||
| Hardware per station, from the [bill of materials](inline-qc-station/inline-qc-station-bom.csv) | USD 16k to 33k (0.53M to 1.08M THB) |
|
||
| First station: frame build and machined parts, lighting trials, software, training data | 2 to 4 person-months, USD 15k to 40k (our own team with a local machine builder) |
|
||
| Launch plant: two stations, Duplex cell and Classic | about USD 50k to 105k (1.6M to 3.5M THB) |
|
||
|
||
All three figures are estimates; the bill of materials names a source for each priced line. They fit inside the existing metrology
|
||
launch-tier line, USD 170k to 460k for XRF, inline vision and the audio
|
||
station ([total investment](../finance/total-investment.md)). The plan
|
||
prices therefore do not change. That line has no published split, so the
|
||
vision share is not yet confirmed.
|
||
|
||
## Where to buy in Thailand
|
||
|
||
| Brand | Channel | Status |
|
||
|---|---|---|
|
||
| Keyence | Keyence (Thailand), direct sales | free demos and test reports, as Keyence offers in other markets ([Keyence](https://www.keyence.eu/landing/lpc/surface-defect-detection.jsp)); confirm locally |
|
||
| Basler | LINX KK (Thailand), Basler's only official distributor in Thailand ([LINX](https://linx.co.th/en)) | |
|
||
| Cognex | local distributor | still to name |
|
||
| Hikrobot | local distributor or the Chinese route | still to name |
|
||
| Micro-Epsilon, LMI, Optris | local distributor | still to name |
|
||
|
||
## Next steps
|
||
|
||
1. **Lighting trials.** Get a dozen records with known defects from a
|
||
partner plant: non-fill, stitching, bubbles, an off-centre one, and a
|
||
splatter colour. Test them with a borrowed line-scan camera and two
|
||
lights.
|
||
2. **Keyence test.** Ask Keyence Thailand for a test report on the same
|
||
records.
|
||
3. **Newbilt.** Ask about the Classic unload hand-off. Also ask for the
|
||
cycle counter over OPC UA, so every result carries the record key
|
||
(stamper, press, cycle, side; see [digital factory](../digital-factory.md)).
|
||
4. **Warp sensors.** Choose between two point lasers and a line profiler
|
||
once the trials show whether a thickness map is worth the extra cost.
|
||
5. **Acceptance test.** Write it before ordering. It should cover the
|
||
detection rate per defect class on the trial set, the false-reject
|
||
rate on good records (black and specials apart), and every result
|
||
matched to its record key.
|