User, October 2026: the factory is too small and needs room to grow (possibly ten more Classics), one shared hydraulic and air supply, water treatment perhaps in a separate building connected to the galvanics lab, and a fully equipped workshop (maintenance tools, 3D printers, maybe a lathe and a small CNC mill). Model (rebuilt live in FreeCAD 26.3, BIM objects, Params-driven, parametric check plot 135->145 m and factory 112->120 m passed): - plot 135 m (11.4 rai) with a reserve; factory 112 x 25 m, 16 bays, 82 m visitor corridor, fire wall at 90 m; - press hall ~870 m2: two Duplex systems (EX 50 + EX 35), the Classic, ten future Classic positions in two rows on a service trench; - central hydraulics and compressed-air plant room (~62 m2); - water treatment building 12 x 10 m behind galvanics: buried duct (gravity from the +1.2 m floor), covered crossing 6 m clear; - workshop ~200 m2 with benches, tool cabinets, 3D printers, lathe, small CNC mill, drill, saw, welding bay, press, washer, measuring table. Docs: galvanics (water treatment building, proposed), crane doc (workshop fit-out; lathe and CNC mill not yet priced; corridor now 82 m), site-candidates Payap section rewritten, README bullet.
190 lines
11 KiB
Markdown
190 lines
11 KiB
Markdown
# Site Candidates
|
||
|
||
The site strategy is a long lease of raw land on which the purpose-built
|
||
plant is constructed (business plan section 6.1, built from
|
||
`business-plan/build/`). What any site has to offer is unchanged: ~4 rai
|
||
minimum and 6 to 8 rai with expansion, truck access and turning, room for
|
||
the cooling tower and a separated battery enclosure, a 500 to 1,000 kVA
|
||
medium-voltage connection, a slab rated 3 t/m² and a frame able to carry
|
||
the overhead crane ([scale](scale.md),
|
||
[crane, workshop and tours](crane-workshop-tours.md)), factory permission
|
||
for pressing with a steam boiler, and, for Phase 5, permission for an
|
||
electroplating line ([galvanics and stamper prep](equipment/galvanics.md)).
|
||
|
||
## The three candidates
|
||
|
||
| | Mueang Chi, Lamphun | Northern Region Industrial Estate, Lamphun | Payap University land, Chiang Mai |
|
||
|---|---|---|---|
|
||
| Status | Working candidate: the massing model, PV roof design and [construction RFQ](finance/phase1-construction-rfq.md) are sited here | Fallback | New lead (October 2026): the university approached the project and is interested in leasing land to us |
|
||
| Lessor | Private owner | IEAT | Payap University (private, non-profit, founded by the Foundation of the Church of Christ in Thailand) |
|
||
| Plot | 5-0-66.5 rai, 18.4708 N, 98.9642 E, narrow and skewed | Leased estate plots | Not yet identified. The main (Mae Khao) campus is at 18.795 N, 99.033 E |
|
||
| Distance to Chiang Mai old city | ~35 km | Lamphun valley | ~5 km east, on the Chiang Mai–Lampang superhighway |
|
||
| Zoning for factory use | Unverified (agricultural land) | Industrial estate; licensing through the estate | Unverified |
|
||
| Galvanics effluent | Ours to permit; zero discharge | Shared central effluent treatment | Needs the lessor's consent on top of the permit |
|
||
| Neighbours | Agricultural | Industrial | A pharmaceutical facility under construction on the same land |
|
||
|
||
## Payap University (new lead, October 2026)
|
||
|
||
**What we know from the conversation:** Payap University is interested in
|
||
leasing land to the project, and a pharmaceutical facility is under
|
||
construction on the same land. The plot, its size, the title, the term and
|
||
the rent are not known yet.
|
||
|
||
**Public facts.** Payap's main campus, Mae Khao, is at 272 Moo 2, San
|
||
Phranet, San Sai district, on the Chiang Mai–Lampang superhighway. The
|
||
university bought it in 1974 as about 120 acres of low-lying land and has
|
||
since grown it to about 275 acres (~700 rai) with purchases across the ring
|
||
road (Payap's own history page). Its Faculty of Pharmacy put the
|
||
construction of a cosmetics production facility and co-working space out to
|
||
tender in July 2024, and the university has announced a centre for
|
||
producing active compounds from cannabis and medicinal plants by bioreactor
|
||
(RPAH) with an industry sponsor. Whether either of these is the
|
||
pharmaceutical facility on the offered land is to be confirmed.
|
||
|
||
**Why it is worth pursuing.**
|
||
|
||
- **Location.** About 5 km from the old city and 25 to 30 km nearer the
|
||
team, customers and the airport than Mueang Chi. The
|
||
[visitor corridor](crane-workshop-tours.md), the
|
||
[artist platform](artist-platform.md) and hiring all work better in town.
|
||
- **A partner, not only a landlord.** Payap also wants to build new
|
||
student programmes with us in audio engineering (mastering, lathe
|
||
cutting), IT and business administration; that strand has its own page,
|
||
[Payap partnership](payap-partnership.md). Its Faculty of Pharmacy has
|
||
analytical labs that could back the PVC material lab
|
||
([quality automation](quality-automation.md)), and a formal university
|
||
collaboration is the kind of R&D and skills cooperation the
|
||
[BOI](boi.md) merit measures reward; confirm which measure applies.
|
||
- **Production is already being built there.** If the pharmaceutical
|
||
facility has factory permission, the land may already have a path
|
||
through licensing and a medium-voltage supply nearby. Shared
|
||
infrastructure (MV connection, RO water, effluent treatment) is worth
|
||
asking about.
|
||
|
||
**What could rule it out** (check in this order, before any design work):
|
||
|
||
1. **Zoning.** The plot's colour in the Chiang Mai comprehensive city plan
|
||
and whether it allows a record-pressing factory with a steam boiler and,
|
||
later, electroplating. A pharmaceutical or cosmetics plant and an
|
||
electroplating line are different factory classes, so the neighbour's
|
||
permit proves little. Ask the provincial public works and town planning
|
||
office, as for Mueang Chi.
|
||
2. **Can the university lease to a company?** Title type (Chanote needed),
|
||
university council approval, and whether campus land of a private
|
||
higher-education institution carries restrictions on commercial leases.
|
||
This is a question for Thai counsel, together with the lease terms the
|
||
business plan already requires (registered 30-year lease with renewal,
|
||
building ownership, mortgageable).
|
||
3. **The pharmaceutical neighbour.** A GMP facility is sensitive to dust,
|
||
smoke and fumes. Ours: the boiler stack (biomass smoke next to a
|
||
pharmaceutical plant in town would be a hard sell, which favours
|
||
electric or LPG steam; see [biomass](biomass.md)), galvanics extraction,
|
||
PVC extrusion fumes, press noise and truck traffic. Agree emission and
|
||
buffer rules in the lease rather than after the first complaint.
|
||
4. **Flooding.** Payap describes the Mae Khao land as low-lying when bought.
|
||
Check the plot against the 2024 flood extents; the design's floor, 1.2 m
|
||
above ground for the loading docks, helps but is not a flood
|
||
assessment.
|
||
5. **Plot fit.** Shape and size against the 60 × 25 m building, the
|
||
detached utility yard and the phase 2 footprint (6 to 8 rai). The
|
||
Payap scenario model below needs a 135 m square (11.4 rai) as drawn,
|
||
with room for ten more Classics and a reserve.
|
||
6. **Galvanics on a campus.** Phase 5 electroplating needs the lessor's
|
||
written consent; the zero-discharge design
|
||
([sustainability](sustainability.md)) becomes a lease condition, not
|
||
only a commitment.
|
||
|
||
**Questions for the next meeting with Payap:** which plot (map, size,
|
||
title deed number), its zoning and current use; what the pharmaceutical
|
||
facility is, who operates it and when it opens; what utilities it brings
|
||
(MV, water, wastewater); lease term, rent, renewal and building ownership;
|
||
what collaboration the university wants in return.
|
||
|
||
Nothing has been re-sited. The parametric model, PV roof study, RFQ and
|
||
the fleet site code `lpn` in the [digital factory](digital-factory.md)
|
||
stay on Mueang Chi until a Payap plot is known and has passed checks 1
|
||
and 2.
|
||
|
||
### Payap scenario model (October 2026)
|
||
|
||
To see the plant on Payap land before a plot is known, a separate
|
||
parametric BIM model sites it on a simple square plot:
|
||
[cnx_vinyl_parametric_payap.FCStd](cnx_vinyl_parametric_payap.FCStd)
|
||
(top view [PNG](cnx_vinyl_parametric_payap.png),
|
||
[isometric](cnx_vinyl_parametric_payap-iso.png)), built in FreeCAD 26.3
|
||
from BIM walls, slabs, columns, spaces and equipment. Every size and
|
||
position hangs off its `Params` spreadsheet (plot side, setbacks, floor
|
||
level, building sizes, fire wall line, office and water treatment gaps),
|
||
so the square can be swapped for the real plot once Payap names one. It
|
||
is a layout sketch: every position and every equipment envelope is an
|
||
estimate.
|
||
|
||
- **Plot**: 135 × 135 m (18,225 m², 11.4 rai), road assumed on the south
|
||
side, 6 m setbacks (placeholder). That is more than the 6 to 8 rai of
|
||
[scale](scale.md): the factory keeps room for ten more Classics, and the
|
||
plot keeps a reserve in front for a second hall or a PV field.
|
||
- **Factory, production floor only**: 112 × 25 m at floor level +1.2 m,
|
||
16 frame bays, in process order along an 82 m glazed visitor corridor.
|
||
From west to east: staff entry and lockers; workshop and spares, with
|
||
the machine door and a 12 m vehicle ramp at the north-west corner;
|
||
galvanics clean room with a chemical day store; stamper prep, PVC lab,
|
||
material area and the electrical room; the press hall; trim and optical
|
||
inspection, QC lab, and finishing and packaging. Behind the fire wall at
|
||
90 m are the warehouse and dispatch with two dock doors.
|
||
- The press hall (~870 m²) holds two Duplex systems, each two HRP 12
|
||
presses with an EX 50 and an EX 35, the Classic, and **ten more
|
||
Classic positions** in two rows
|
||
([pressing line](equipment/pressing-line.md)).
|
||
- **One shared hydraulic and compressed-air supply**: a central plant
|
||
room (~62 m²) at the west end of the press hall, and a service trench
|
||
along the press rows for the hydraulic ring main, compressed air,
|
||
steam and cooling water.
|
||
- The workshop (~200 m²) is fully equipped, with 3D printers, a lathe
|
||
and a small CNC mill among the tools
|
||
([crane, workshop and tours](crane-workshop-tours.md)).
|
||
- The 5 t crane runs from the west wall to the fire wall.
|
||
- **Water treatment building**, separate, 12 × 10 m at ground level
|
||
directly behind galvanics: zero-discharge effluent treatment, the DI
|
||
water plant and the chemical store. A buried duct carries the effluent
|
||
by gravity from the galvanics floor, and a covered crossing (6 m clear
|
||
for trucks) joins the galvanics door
|
||
([galvanics](equipment/galvanics.md)).
|
||
- **Office building, isolated from the factory floor**: 24 × 15 m, single
|
||
storey, 12 m south of the factory on its own slab and structure, joined
|
||
by a covered link that lands at the start of the visitor corridor.
|
||
- It holds reception, offices, a meeting and training room (the
|
||
[Payap programmes](payap-partnership.md)), mastering and cutting with
|
||
an inner acoustic lining, the listening room, the IT and server room,
|
||
the archive, and WC and kitchen.
|
||
- The lathe sits away from press vibration and outside the crane zone.
|
||
- **Utility yard** behind the press hall, across a 6 m lane:
|
||
- boiler house with chimney and a covered fuel store;
|
||
- chiller and cooling tower;
|
||
- process and fire water tanks;
|
||
- PEA transformer;
|
||
- a pipe bridge that drops into the service trench.
|
||
|
||
Boiler, chiller and transformer are drawn at the one-Duplex sizes. They
|
||
need re-sizing for five presses, and again if the Classics are added
|
||
([scale](scale.md)).
|
||
- **Access**:
|
||
- one gate on the south side opens onto a truck apron in front of the
|
||
dock doors;
|
||
- an access road runs along the south boundary to the car park, with
|
||
a footpath to the office;
|
||
- a lane behind the factory serves the yard, the water treatment
|
||
building and the ramp. The low-loader's swept path at the ramp still
|
||
needs checking.
|
||
- **Area**: about 2,800 m² of factory, 360 m² of office and 120 m² of
|
||
water treatment, so ~3,280 m² under roof plus the boiler house. That is
|
||
well above the 1,400 to 2,000 m² of the [scale](scale.md) zone table,
|
||
which held one Duplex and an automated zone with the offices inside.
|
||
- Two thirds of the difference is the press hall with its expansion
|
||
floor.
|
||
- Warehouse and dispatch (~530 m²) are drawn above that table's 300 to
|
||
500 m² for packaging and finished goods.
|
||
|
||
All of it is an estimate to settle against the real plot.
|
||
|
||
The Mueang Chi model and everything sited on it stay as they are.
|