Files
cnx_vinyl/README.md
T
grabowski 122d908862 Labels are pressed into the record, not applied at finishing
The docs and the plant page had labelling as a finishing step after the
press. On a record press the bottom label, the cake and the top label go
in between the stampers every cycle and the mold bonds the paper into the
vinyl; the oven only pre-dries them. Corrected everywhere the process is
described:

- process-flow.md: labels are a parallel input to pressing with their own
  row (print inspection, oven, lot per cycle); stage 6 loads label, cake,
  label; stage 7 is trim, sleeve, shrink
- process-flow.drawio (+ regenerated png/pdf): label input now feeds
  stage 6, not stage 7
- README vision list and the business plan source (regenerated docx/pdf):
  pressing paragraph explains the pressed-in label, finishing no longer
  claims to label
- plant-operation.html: label dry oven station feeds two label discs
  into the press with every cake, the cake in the mold shows its labels,
  the cycle log records the label lot, finishing is sleeve + shrink
2026-09-21 16:16:18 +02:00

168 lines
8.6 KiB
Markdown

# CNX Vinyl / Poy Records
A vinyl record factory in planning for the Chiang Mai area of northern
Thailand (site candidates include Lamphun and Lampang provinces). This
repository is the source of truth for the project: planning documents and
cost data today. As the factory takes shape it will also hold the data and
software used to run it.
## Team
- **Simona Meesaiyati**, Project Lead
- **Alexander Grabowski**, Technical Consultant
[buildfor.life](https://buildfor.life) supports the project in a consulting
capacity.
## Vision: Full-Service Production
The goal is the complete vinyl production chain under one roof, from audio
file to delivered record:
1. **Mastering**: audio mastering for vinyl
2. **Lathe cutting**: cutting the master disc
3. **Silvering**: metallizing the cut master
4. **Stamper production**: electroforming nickel stampers in-house
5. **Pressing**: extrusion and pressing of the records, with the labels
pressed in
6. **Finishing**: trimming, sleeving, shrink wrapping
7. **Packaging**: folded paper cartons (jackets and sleeves), produced in
collaboration with local packaging manufacturers
8. **Fulfillment**: dropshipping directly to end customers on behalf of
labels and artists, alongside conventional bulk delivery
In-house galvanics (steps 3 and 4) removes the dependency on overseas stamper
suppliers, a common bottleneck for pressing plants, and shortens turnaround
for clients. Partnering with local carton manufacturers keeps packaging
sourcing close to the plant, in line with the local-sourcing preference for
materials. The pressing line is documented in detail; equipment, partners,
and budgets for the other steps are open planning items.
## Project Status
**Planning stage** (as of mid-2026).
- Industry outreach has been ongoing for several years: equipment vendors,
material suppliers, and independent consultants.
- Alexander and Simona will soon travel to
[Making Vinyl](https://makingvinyl.com/) in Haarlem, Netherlands, to gather
further insights from the pressing industry.
- A collaboration with [ResurRec](https://www.resurrec.com/) is under
discussion.
## Planning Documents
The detail lives in dedicated documents:
- [Roadmap](docs/roadmap.md): next steps in dependency order, from the
three current gates (market validation, BOI, land title check) through
quotes, commitment, build, launch, and expansion
- [Pressing line equipment plan](docs/equipment/pressing-line.md): the
50/50 automated/semi-automatic fleet strategy, the Newbilt system under
evaluation (~USD 232k quoted scope), and site requirements
- [Vendor landscape](docs/suppliers/vendor-landscape.md): researched
candidates for mastering and cutting (Agnew Analog), galvanics equipment
(Plating Power / Digital Matrix), stamper preparation (Sibert), bridge
stamper service (Stamper Discs), and automated presses (Pheenix Alpha)
- [Equipment needs and supplier map](docs/suppliers/equipment-suppliers.md):
the full needs list per production step with supplier tables and contacts
- [Sustainability](docs/sustainability.md): the solar installation (Deye
inverters, 271 kWh Gobel Power battery stack), the zero contaminated water
commitment, and the materials strategy
- [Worker safety](docs/worker-safety.md): safety training, galvanics clean
rooms and decontamination, PPE
- [Biomass fuel strategy](docs/biomass.md): the 60 rai own-grown coppice
idea (with the forestry-classification check that comes first), northern
agricultural waste as the main supply, and the staged electric-to-biomass
path
- [BOI investment promotion](docs/boi.md): the promotion strategy (Group B
base activity plus solar, automation, and R&D measures for the tax value),
requirements, Northern-region angle, and why BOI approval precedes
machinery orders
- [Facility security and site systems](docs/facility-security.md): access
control, CCTV, whole-factory HVAC (temperature, humidity, PM), archive and
audio protection, fire and life safety, plant monitoring, Thai compliance
anchors
- [Process logging and traceability](docs/traceability.md): end-to-end
per-order traceability for customers, batch genealogy from audio file to
shipment, and the requirements this sets for the factory software
- [Quality automation](docs/quality-automation.md): stamper metrology
(Keyence-class confocal, profiler, XRF), layered pressed-record QC (100%
optical inspection, per-cycle press telemetry, sampled automated audio
comparison), and how it feeds traceability
- [Process flow](docs/process-flow.md): the whole chain from audio file to
delivered record as a chart and stage table, with every check and the
three artist approval gates (printable diagram alongside)
- [Plant operation page](docs/plant-operation.html): a single static page
animating the whole plant as a simulated SCADA overview, from PVC intake
and the material lab through extruder, press, trim, optical inspection,
finishing, packaging and fulfillment, with the metal path, utilities and
energy alongside; open it in a browser, every station is clickable
- [Production timeline](docs/production-timeline.md): how long an order
takes stage by stage, launch vs mature configuration, the repress fast
path, and what lead time can honestly be quoted to a customer
- [Project timeline](docs/project-timeline.md): the calendar from today to
first paying release, the BOI-to-machinery critical path, and where the
float actually sits
- [Project scale](docs/scale.md): rough numbers for everything on one page:
output capacity, building area, land, electrical demand, solar and
storage, steam and fuel, headcount, and money cross-references
- [Total investment](docs/finance/total-investment.md): the full-vision
roll-up (~4.7M to 8.9M USD) and the ~1.7M to 2.9M USD phased entry, with
the basis of every block
- [Phase 1 construction RFQ](docs/finance/phase1-construction-rfq.md):
the spec sheet for asking a contractor to price the phase 1 buildings
and site works, with quantities taken from the parametric BIM model
- [Revenue model](docs/finance/revenue-model.md): rough full-capacity
revenue (~3.7M to 6.8M USD/yr), direct cost and margin per record, and
the levers and caveats behind the numbers
- [Business plan](docs/business-plan/CNX-Vinyl-Business-Plan.docx): the
investor-facing roll-up of everything above, built from
`docs/business-plan/build/` (run `python build_plan.py` to regenerate
after the numbers move). Draft 0.1 carries the land-lease decision, the
cassette and CD scope, and Ploy Printing as packaging partner and
intended co-investor
## Repository Layout
```
docs/
├── business-plan/
│ ├── CNX-Vinyl-Business-Plan.docx Investor business plan (generated)
│ └── build/ Python source of the plan; regenerate with
│ build_plan.py
├── consulting/ Consultancy proposals and overviews
├── equipment/
│ ├── newbilt/ Offers, site requirements, process schematic,
│ │ service rates (vendor PDFs)
│ └── pressing-line.md Press fleet strategy and equipment plan
├── finance/ Project cost overviews, revenue model,
│ construction RFQ
├── suppliers/ Supplier contacts, vendor landscape, supplier map
├── biomass.md Biomass fuel strategy and the 60 rai coppice idea
├── boi.md BOI promotion strategy and requirements
├── facility-security.md Security, HVAC, fire and life safety, compliance
├── process-flow.md Audio file to delivered record, with all checks
├── production-timeline.md Order turnaround, stage by stage
├── project-timeline.md Calendar to first paying release, critical path
├── quality-automation.md Stamper metrology and layered record QC
├── roadmap.md Next steps in dependency order
├── scale.md Rough project sizing on one page
├── sustainability.md Energy, water, materials commitments
├── traceability.md Process logging and per-order traceability
└── worker-safety.md Training, clean rooms, PPE
```
Vendor PDFs and spreadsheets are primary sources and reflect the state of
negotiations at their file dates. Treat prices and lead times as snapshots,
not commitments.
## What This Repo Will Grow to Hold
- Accumulate planning and vendor documents as decisions firm up, including
the mastering, cutting, and galvanics chain
- Add structured data (inventory, orders, production batches) once operations
begin
- Host the software/tooling built to run the factory (tracking, ERP-style
workflows)