Files
cnx_vinyl/README.md
T
grabowski 0a4f47a5cc Split README into topic documents
- README reduced to overview with linked document index
- docs/equipment/pressing-line.md: fleet strategy, Newbilt plan, site reqs
- docs/suppliers/vendor-landscape.md: researched vendor narratives
- docs/sustainability.md: solar, zero-discharge water, materials
- docs/worker-safety.md: training, clean rooms, PPE
- docs/facility-security.md: access control, CCTV, archive/audio protection,
  fire and life safety, plant monitoring, Thai compliance anchors
2026-07-17 12:51:04 +07:00

102 lines
4.4 KiB
Markdown

# CNX Vinyl / Poy Records
A vinyl record factory in planning for the Chiang Mai area of northern
Thailand (site candidates include Lamphun and Lampang provinces). This
repository is the source of truth for the project: planning documents and
cost data today. As the factory takes shape it will also hold the data and
software used to run it.
## Team
- **Simona Meesaiyati**, Project Lead
- **Alexander Grabowski**, Technical Consultant
[buildfor.life](https://buildfor.life) supports the project in a consulting
capacity.
## Vision: Full-Service Production
The goal is the complete vinyl production chain under one roof, from audio
file to delivered record:
1. **Mastering**: audio mastering for vinyl
2. **Lathe cutting**: cutting the master disc
3. **Silvering**: metallizing the cut master
4. **Stamper production**: electroforming nickel stampers in-house
5. **Pressing**: extrusion and pressing of the finished records
6. **Finishing**: trimming, labels, shrink wrapping
7. **Packaging**: folded paper cartons (jackets and sleeves), produced in
collaboration with local packaging manufacturers
8. **Fulfillment**: dropshipping directly to end customers on behalf of
labels and artists, alongside conventional bulk delivery
In-house galvanics (steps 3 and 4) removes the dependency on overseas stamper
suppliers, a common bottleneck for pressing plants, and shortens turnaround
for clients. Partnering with local carton manufacturers keeps packaging
sourcing close to the plant, in line with the local-sourcing preference for
materials. The pressing line is documented in detail; equipment, partners,
and budgets for the other steps are open planning items.
## Project Status
**Planning stage** (as of mid-2026).
- Industry outreach has been ongoing for several years: equipment vendors,
material suppliers, and independent consultants.
- Alexander and Simona will soon travel to
[Making Vinyl](https://makingvinyl.com/) in Haarlem, Netherlands, to gather
further insights from the pressing industry.
- A collaboration with [Resurrec](https://www.resurrec.com/) is under
discussion.
## Planning Documents
The detail lives in dedicated documents:
- [Pressing line equipment plan](docs/equipment/pressing-line.md): the
50/50 automated/semi-automatic fleet strategy, the Newbilt system under
evaluation (≈ €200,500 quoted scope), and site requirements
- [Vendor landscape](docs/suppliers/vendor-landscape.md): researched
candidates for mastering and cutting (Agnew Analog), galvanics equipment
(Plating Power / Digital Matrix), stamper preparation (Sibert), bridge
stamper service (Stamper Discs), and automated presses (Pheenix Alpha)
- [Equipment needs and supplier map](docs/suppliers/equipment-suppliers.md):
the full needs list per production step with supplier tables and contacts
- [Sustainability](docs/sustainability.md): the solar installation (Deye
inverters, 271 kWh Gobel Power battery stack), the zero contaminated water
commitment, and the materials strategy
- [Worker safety](docs/worker-safety.md): safety training, galvanics clean
rooms and decontamination, PPE
- [Facility security and site systems](docs/facility-security.md): access
control, CCTV, archive and audio protection, fire and life safety, plant
monitoring, Thai compliance anchors
## Repository Layout
```
docs/
├── consulting/ Consultancy proposals and overviews
├── equipment/
│ ├── newbilt/ Offers, site requirements, process schematic,
│ │ service rates (vendor PDFs)
│ └── pressing-line.md Press fleet strategy and equipment plan
├── finance/ Project cost overviews
├── suppliers/ Supplier contacts, vendor landscape, supplier map
├── facility-security.md Security, fire and life safety, compliance
├── sustainability.md Energy, water, materials commitments
└── worker-safety.md Training, clean rooms, PPE
```
Vendor PDFs and spreadsheets are primary sources and reflect the state of
negotiations at their file dates. Treat prices and lead times as snapshots,
not commitments.
## Roadmap for This Repo
- Accumulate planning and vendor documents as decisions firm up, including
the mastering, cutting, and galvanics chain
- Add structured data (inventory, orders, production batches) once operations
begin
- Host the software/tooling built to run the factory (tracking, ERP-style
workflows)