docs/equipment/pheenix-alpha/: the four Pheenix Alpha electroforming flyers (2024: PASU silvering, PPPU pre-plating, PDPU dual-cell plating, PMPB passivation bench), renamed from their download hashes. docs/equipment/sibert/: the VSP, VSF and VSC technical specifications (2021), plus Sibert's 2008-09 optical-disc SPS literature and the 2008 Blu-ray stamper characteristics paper in sps-optical-disc-2009/. Two byte-identical duplicates in the download were dropped. New docs/equipment/galvanics.md, the metal-path counterpart to pressing-line.md: datasheet tables for both ranges and what they change. Pheenix is a second turnkey galvanics vendor next to Digital Matrix and can quote lacquer-to-record as one vendor; neither range includes water treatment. Utilities from the sheets (~27 kVA connected per line, DI water, 12-20 C cooling water, extraction sizes), ~5.6 m2 of footprint, and a cell count estimate (one PDPU at the low end, two at the high end). The Sibert machines are single-phase, 200/250/600 kg on castors, centre manually and list no data interface; the VSC locates on the punched hole; the finisher's water carries nickel. Weights, cycle times, prices and mould fit are listed as quote questions. Backlinks and small updates: README (bullet, layout tree, vendor list), roadmap items 6 and 23, vendor landscape, supplier map, exhibitor briefing (on-file notes, Sibert three-phase question answered), digital factory (Pheenix PLC data, Sibert data question, RFQ clause 5), quality automation (hardness on the centre slug, BD paper as the acceptance-spec model), sustainability (finisher water), total investment block label (numbers unchanged), scale (galvanics feeder note), crane weight table, process flow, pressing-line stamper-fit question, plant page detail lines.
81 lines
5.5 KiB
Markdown
81 lines
5.5 KiB
Markdown
# Production Process Flow: Audio File to Delivered Record
|
|
|
|
The complete chain with every check and approval gate. Three gates involve
|
|
the artist or label directly (marked as approval gates); everything else is
|
|
internal QC. Every step writes to the [traceability
|
|
database](traceability.md); the instruments behind the checks are specified
|
|
in [quality automation](quality-automation.md), the machines for stages 4
|
|
to 6 in [galvanics and stamper prep](equipment/galvanics.md) and the
|
|
[pressing line](equipment/pressing-line.md).
|
|
|
|
A printable diagram of this flow lives alongside this document:
|
|
[process-flow.drawio](process-flow.drawio) (editable),
|
|
[process-flow.png](process-flow.png), and
|
|
[process-flow.pdf](process-flow.pdf).
|
|
|
|
Orders reach stage 1 either directly or through the
|
|
[artist platform](artist-platform.md), where the upload, the automatic
|
|
audio and artwork checks and gate 1 happen before a fan-funded campaign
|
|
is allowed to go live.
|
|
|
|
```mermaid
|
|
flowchart TD
|
|
A[1. Audio intake] --> G1{Artist gate:<br/>master plan approved}
|
|
G1 --> B[2. Vinyl mastering]
|
|
B --> G2{Artist gate:<br/>master approved}
|
|
G2 --> C[3. Lathe cutting<br/>lacquer]
|
|
C --> D[4. Silvering and<br/>electroforming<br/>father, mother, stampers]
|
|
D --> E[5. Stamper prep<br/>punch, back-finish, coin]
|
|
E --> F[6. Pressing]
|
|
PVC[PVC compound intake] --> LAB[Material lab gate] --> F
|
|
REG[Regrind stream] --> LAB
|
|
LBL[Labels: print inspected,<br/>pre-dried in oven] --> F
|
|
F --> G3{Artist gate:<br/>test pressing approved}
|
|
G3 --> F2[Production run]
|
|
F2 --> H[7. Finishing<br/>trim, sleeve, shrink]
|
|
H --> I[8. Packaging<br/>and assembly]
|
|
CART[Cartons and sleeves<br/>from local partners] --> PQC[Packaging incoming QC] --> I
|
|
I --> J[9. Fulfillment<br/>warehouse, bulk, dropshipping]
|
|
|
|
A -.-> QA1[Checksums, format,<br/>technical QA]
|
|
C -.-> QA3[Groove microscope,<br/>test cut, dead-wax<br/>scribe and fiducial]
|
|
D -.-> QA4[Bath logs, XRF thickness,<br/>metrology on sampled zones,<br/>mother listening check,<br/>laser back marks]
|
|
E -.-> QA5[Concentricity,<br/>dimensional, visual]
|
|
F2 -.-> QA6[Press telemetry per cycle,<br/>100% optical inspection,<br/>sampled audio comparison]
|
|
I -.-> QA8[Matrix code vs jacket<br/>barcode scan, barcode<br/>verification]
|
|
```
|
|
|
|
## Stage by stage
|
|
|
|
| # | Stage | Internal checks | Approval gate |
|
|
|---|---|---|---|
|
|
| 1 | Audio intake | File checksums and format verification; technical QA (levels, clipping, side length vs format) | Artist/label confirms the master plan |
|
|
| 2 | Vinyl mastering | Engineer QA of the vinyl master | Artist/label approves the master |
|
|
| 3 | Lathe cutting | Groove inspection under microscope; test cut evaluation; dead-wax matrix scribe and angular fiducial applied (cold mechanical scribe, never laser) | |
|
|
| 4 | Silvering and electroforming | Bath chemistry logs per batch; XRF nickel thickness per part; confocal/profiler groove metrology on sampled radial zones; mother listening check (mothers are playable); laser Data Matrix marks on part backs | |
|
|
| 5 | Stamper prep | Concentricity and dimensional checks after punch, back-finish, and coining; visual inspection | |
|
|
| M | PVC intake (parallel input) | Material lab gate per lot: certificate of analysis, moisture, heat stability, color, density, granulate physicals; new lots released only by test pressing; regrind stream passes its own contamination gate before joining the 80/20 mix | |
|
|
| L | Labels (parallel input) | Print inspection of each label lot against the approved proof; labels pre-dried in the oven before they go to the press (moisture in the paper causes bubbles); label lot logged per press cycle | |
|
|
| 6 | Pressing | Bottom label, cake and top label are loaded between the stampers every cycle, so the labels are pressed into the record; press telemetry logged every cycle; then per record: 100% inline optical inspection (including label identity and centering); sampled automated audio comparison against the source master | Artist/label approves the test pressing before the production run |
|
|
| 7 | Finishing | Trimming quality; inner sleeving; shrink wrap on sampling basis | |
|
|
| 8 | Packaging | Incoming carton QC per delivery (dimensions, print Delta E against approved proof, seam strength, inner sleeve scuff check); assembly verification by scanning the runout matrix code against the jacket barcode; barcode verification on every unit | |
|
|
| 9 | Fulfillment | Consignment assembly against the order's bill of materials; carrier tracking recorded per shipment or per dropshipped end customer | |
|
|
|
|
## Reading the chain
|
|
|
|
- **The three artist gates** are the customer-facing milestones: master plan,
|
|
approved master, approved test pressing. Nothing proceeds past a gate
|
|
without a recorded approval, and the approvals live in the same
|
|
traceability record as the physical process data.
|
|
- **Identity travels with the product**: the dead-wax scribe from stage 3
|
|
propagates through every metal generation and appears on every pressed
|
|
record, which is what lets stage 9 verify that the right record is in the
|
|
right jacket.
|
|
- **Materials join the chain with their own gates**: PVC lots, regrind
|
|
batches and label lots enter at pressing, cartons and sleeves at
|
|
packaging, and their lot IDs attach to every record and order they touch.
|
|
- **A complaint resolves backwards**: any single record traces to its
|
|
stamper, press, cycle, operator, compound lot, and packaging lot, and from
|
|
the stamper back through mother and father to the lacquer and the approved
|
|
master it came from.
|