grabowski 9ed51f4b22 Factory console and customer order status: investor demo
Deploy test site / deploy (push) Successful in 51s
New page docs/factory-console.html (site /demos/factory/): the factory
application of digital-factory.md on a simulated plant day, with a
switch to the customer portal of the same orders.

Factory console (sidebar: Floor, Orders, Quality, Lab, Metal, Ledger):
- floor: five presses of the launch fleet (two Newbilt Duplex systems,
  one Classic) with the mounted order, live good / rejected counters,
  stamper plays against life, cycle time and steam; KPIs for the day;
  live optical inspection stream with record keys; alerts (stops, lab
  holds, stampers near end of life, listening reviews, long gate waits);
  stations (cutting, galvanics, stamper prep, lab, packing); orders by
  stage; good records per day
- orders list with stage filters and search; order detail with stage
  track, approvals, metal genealogy and stamper metrology, press run
  telemetry, compound lot certificate, rejects by reason, audio samples,
  packing and shipping, and the order's events
- press detail with telemetry sparklines; quality (rejects by reason,
  yield per press, audio comparison); lab (compound lots with results
  against illustrative limits, one lot on hold with re-dry and retest,
  regrind batches, hoppers); metal (baths, mounted stampers, metrology,
  archive); hash-chained event log

Customer portal (four demo customers: pressing now, waiting to approve
the test pressing, in plating, delivered): progress through every step
and the three gates, copies pressed so far with the latest copies and
their record keys, approving the test pressing books the press slot
(greedy plan of the queue gives the start time and press), and a quality
report that fills in step by step: files, lacquers, metal parts with
metrology, test pressings, the compound lot's lab results, pressing and
inspection, listening checks, packing.

Simulation: 60 days warmed up at load (about 0.7 s), then 1x to 3600x.
Stages and durations from the production timeline, Newbilt cycle times,
two shifts 06:00 to 22:00, unplanned stops, stamper life 1,000 to 2,000
plays, audio sampling first-off plus about 1 in 50 (1 in 25 near end of
life), compound lots through the lab gate and release test pressing.
All orders, values and IDs are simulated; limits are illustrative.

Linked from digital-factory.md (the factory application), traceability.md
(customer-facing view), the README and the landing page.
2026-10-16 10:17:19 +07:00
grabowski 607f6631a7 Make a record: investor demo of the artist platform, end-user flow
Deploy test site / deploy (push) Successful in 53s
New static page docs/make-a-record.html (test site /demos/make-a-record/):
the artist platform as a customer would see it, polished for presenting.

- five steps (design, music and art, price, fan funding, track) with a
  sticky stage: to-scale mock-up (record spins at 33 1/3 or 45 rpm on
  hover), spec chips, price per copy, ship month and the next action
- design as option cards and swatches; options that do not apply stay
  visible and disabled (weight and gatefold off 12", colour pickers for
  black vinyl)
- masters and artwork read in the browser as in the detailed demo, side
  bars per side, checks in plain words, approval 1 of 3
- price with the curve, itemised lines folded under one summary, lead time
  as two bars (approvals, then the 7 to 9 week quote)
- fan funding: goal, break-even and what the artist keeps, money rules;
  the campaign on a phone with a pre-order ticker, funded or missed ends,
  production timeline with the artist's approvals, updates feed
- record passport for one delivered copy (stamper, press, cycle time and
  side; stage dates; optical inspection and sampled audio), per
  traceability.md and quality-automation.md, IDs simulated; repress card
- "Investor notes" switch with the business case per step (market
  research, vault, short-run economics and the Thai price gap, plant-owned
  vs broker and the Qrates lesson, traceability and represses); guided
  tour of about a minute (#tour, #notes in the URL)
- light/dark theme shared with the other pages; phone layout with a
  bottom bar

Same price list (demo-0.1) and stage table as artist-order.html, so the
defaults reproduce the artist platform example: 37,836 THB per title,
232 THB per copy at 100, break-even 41, goal 100, 548 THB kept a copy.

artist-platform.md: investor demo paragraph. traceability.md: the record
passport as the per-copy customer view. README bullet and layout line,
site DEMOS line and landing-page entry.
2026-10-15 16:13:29 +07:00
grabowski c56d403da0 Record the Making Vinyl feedback on traceability
Most people the team talked to in Haarlem were strongly interested in the
full-traceability approach. For Sibert it was one of the reasons to talk to
us at all; without it their representative would strongly advise against
the plan, and seeing buildfor.life's development and data work convinced
him the project comes from the right direction.

Exhibitor briefing gets an "After the show" section (feedback, what has
been filed since); traceability.md opens with the market signal; roadmap
item 1 notes it as supply-side evidence, with buyer prices still missing;
README project status updated (show attended, Payap lead).
2026-10-03 21:39:45 +02:00
grabowski 0fb60bcbb5 Add digital factory systems plan (NixOS fleet as one Clan)
New docs/digital-factory.md: every system needed for environmental,
machine, QC and genealogy data to land in one database keyed to one
record identity. Standing decision: all services run on NixOS machines
declared and deployed as a single clan.lol inventory (mesh, backups,
host monitoring, secrets from clan services).

Covers machine list and roles, VLAN zoning, Telegraf/MQTT acquisition
source by source with the RFQ clause for each, environment sensor zones,
QC instrument integration paths, the factory application modules and
entities, alerting tiers, backup and retention, security, procurement
clauses, build order aligned with the roadmap phases, rough cost and
open questions.

README index and layout tree updated; roadmap item 17 and the
traceability spec link to the new document.
2026-09-21 21:06:42 +02:00
grabowski 808e3e34b8 Add quality automation spec: stamper metrology and layered record QC
- Keyence-class instrument stack for father/mother/stamper analysis
  (VK-X confocal sampled zones, VR-6000 wide-area, XRF thickness) with
  genealogy integration via middleware
- Three-layer pressed-record QC: 100% inline optical inspection,
  per-cycle press telemetry, sampled automated audio comparison
- Honest limits documented: no turnkey products exist for the optical
  and audio layers; 100% audio QC impossible at press speed
2026-07-17 13:56:45 +07:00
grabowski 0b79c4fb73 Add whole-factory HVAC requirement and process traceability spec
- facility-security.md: continuous temperature/humidity/PM control, zoned
  filtration, burning-season PM2.5 design point, HVAC in PV/battery sizing
- traceability.md: end-to-end per-order customer traceability, batch
  genealogy, log-at-source principles, machine data access as a
  procurement requirement
2026-07-17 13:05:46 +07:00