grabowski eac45eb234 Lacquer blank 70 EUR and cutting engineer 50,000 THB a month
Deploy test site / deploy (push) Successful in 39s
Team figures, October 2026:
- revenue-model.md: a lacquer blank costs about 70 EUR, one per side, so
  ~160 USD a two-sided title before recuts; a cutting engineer costs about
  50,000 THB a month;
- fleet calculator: the lacquer assumption is now in EUR (70, one per
  side, converted at 1.155 USD per EUR; styli and recuts not included)
  and the cutting engineer 50,000 THB a month, both marked as team
  figures instead of estimates. At the defaults lacquers come to ~54k USD
  a year and direct cost to 1.88 USD a record (was 1.86).
2026-10-10 20:12:26 +07:00
grabowski ce1d71e0b5 Fleet calculator: material, energy and labour cost, revenue and P&L
Deploy test site / deploy (push) Successful in 36s
User, October 2026: add calculation for material cost, PVC, carton,
chemicals, labour etc. and revenue from sales.

New "Money a year" card (and a "Prices and money" input card):
- revenue: standard records at the standard price, specials with the
  premium, title services per title (revenue-model.md 3.50 to 4.60
  blended, +0.60 to 1.70, 580 to 1,730 USD a title);
- materials and packaging: PVC from the compound tonnage (rejects in,
  trim back as regrind), labels per pressed record, inner sleeves,
  printed jackets, shrink wrap, shipping cartons (estimate), maintenance;
- stamper making: lacquer blanks and styli per side (estimate), nickel,
  silver and chemistry per electroformed part (revenue model: 60 to 150
  USD a three-generation set);
- energy from the fleet: machines, chiller and compressors at the hours
  run plus an estimated base load, roof PV off, PEA 3.2.2 blended rate and
  demand charge; steam from the presses running time at the biomass heat
  price (biomass.md); the start fleet lands in scale.md 4.3 to 6.4M THB;
- loaded labour per role (revenue-model.md wages; cutting engineer an
  estimate), headcount now also counts QC, maintenance and cutting;
- overheads, EBITDA, depreciation of capex (total-investment.md start
  fleet plan plus or minus each Duplex system and Classic), operating
  profit, payback; per-record cost bar;
- Adverse / Central / Favourable presets from the revenue model ranges,
  USD / THB / EUR display; ladder gains revenue and EBITDA columns.
At the defaults (1 M records, 20 % specials): revenue 4.42M USD, direct
cost 1.86 USD a record (revenue model central 1.94), EBITDA 2.23M.

README bullet; revenue-model.md links the calculator from its operating
picture.
2026-10-10 19:41:08 +07:00
grabowski c50417668b Press fleet: two Newbilt Duplex systems with an extruder per press, plus a Classic
The current plan (user decision, October 2026) replaces the 50/50 target
(two semi-automatic presses and two Pheenix AD12s) with an all-Newbilt
fleet of five presses: two Duplex systems in Newbilt's two-extruder
configuration (two HRP 12 presses, an extruder each, one hydraulic unit)
and one Classic fully automatic press.

- pressing-line.md: new "Current plan" section (fleet table, what it
  means, phasing from the Single 2.1 as the first half of system 1,
  re-quote questions); site requirements per Duplex system.
- scale.md: capacity table and basis (368 to 448 records/h, ~1.06 to 1.5M
  a year on two shifts, same range as before); pressing electrical row;
  steam and cooling flagged, not re-based: five presses draw ~750 to 900
  kg/h of steam and up to ~625 kW of cooling at Newbilt's per-press
  figures, against the 400 kg/h / 250 kW sized for one Duplex.
- total-investment.md: fleet change as an added-scope row (system 2
  ~230k-300k and the Classic ~290k-460k, estimates; -60k / -160k against
  the two blocks it replaces); headline unchanged until the re-base.
- roadmap items 4, 5 and 24, revenue model mature row, crane doc (the
  Classic's weight now decides 5 t or 3.2 t), vendor landscape (AD12 is
  the comparison for the Classic), README.

The business plan docx is not regenerated.
2026-10-10 16:05:27 +07:00
grabowski 4607a4da58 Plan the artist platform: price calculator and fan-funded pressing
New docs/artist-platform.md: upload master and artwork with automatic
audio, artwork and rights checks; an itemised price calculator for every
customer (per-title vs per-copy lines, price-per-copy curve, lead time
from the production-timeline quote table, versioned price list); and
fan-funded campaigns that press and dropship per fan once the goal is
reached, refund otherwise. Covers goal maths, payments (charge into a
ring-fenced account, CNX as seller of record, legal opinion first; the
Qrates failure as the design rule), repress pre-orders, architecture on
the cnx-factory stack with the public side on a fleet machine, PDPA,
phasing (calculator public early as a run-size probe, campaigns only
after first releases ship), cost and open decisions.

Backlinks from README, process flow, production timeline, revenue model,
digital factory and roadmap items 1 and 20; total investment added-scope
table gains the platform line.
2026-10-02 17:37:32 +02:00
grabowski 1bbef055c4 Remove em dashes where the replacement is unambiguous
The project has a standing style rule against em dashes that was missed
when these docs were written. This removes the 42 occurrences where the
substitution is mechanical and cannot change meaning:

- table cells using an em dash as a placeholder, now a hyphen
- em dashes immediately followed by a conjunction or subordinator
  (but, and, or, so, though, while, which, where, because, since),
  where a comma is simply correct

115 remain. Those join independent clauses, where a comma would create a
splice and a colon often reads wrong, so each needs a judgement call
rather than a pattern. A blanket regex over them was attempted and
reverted: it produced double colons and broken sentences.
2026-08-06 15:31:09 +07:00
grabowski caa38dcd0b Rebuild the operating roll-up and labour cost from components
Both were flagged in the review and deferred; fixing them properly
changes what the model says.

Labour
- The 0.23-0.40 USD/record line implied 44,000-63,000 THB per head per
  month, far above northern Thai production rates.
- Rebuilt from headcount and wages: 13-19 direct production staff
  (operators, galvanics, QC, maintenance) at loaded northern Thai rates
  gives 3.7M-5.4M THB/yr, or 0.08-0.16 USD per record. Build-up shown.
- Mastering and cutting engineers excluded as title-services labour;
  admin and sales moved to overheads where they belong.
- Stamper amortisation widened to 0.03-0.12 to match the in-house
  marginal cost assumed elsewhere on the page.
- Direct cost total is now 1.30-2.58 USD (43-85 THB).

Operating roll-up
- The old EBITDA and operating-profit figures did not reconcile with
  their own components and showed no loss case anywhere. Replaced with
  a three-scenario table built from the components, each column
  internally consistent, with cash overheads and depreciation separated.
- The adverse case is EBITDA-positive but does NOT cover depreciation:
  operating profit -0.32M USD at 1.0M records on the low price and high
  cost. The previous figures quoted 0.6-1.2M and hid this entirely.
  Utilisation and price realisation decide solvency, not just upside.
- The favourable case is not credible and that is a finding about the
  cost table rather than the business: 69% EBITDA margin against
  industry norms of 15-25%, and 47% even at the centre. The direct cost
  table counts only per-record consumables and direct payroll. Named
  what is missing (indirect labour, scrap above the reject allowance,
  water and effluent, inbound freight, inventory carrying, sales
  commission) and marked the adverse column as the honest one until
  those lines exist.
- Payback restated per scenario: never / 2.3-4.4 yr / 1.0-1.8 yr. The
  old "5 to 8 years" came from the pre-correction margin.
- FX sensitivity and the utilisation bullet updated to match.

The table is a sensitivity, not a forecast, and now says so.
2026-08-06 12:52:14 +07:00
grabowski 4deaa2c57c Correct errors found by review; hedge unmarked inferences
A four-agent review audited arithmetic, cross-document consistency,
epistemic honesty and style. It found substantially more than the
manual pass in the previous commit. Errors that changed conclusions,
not decimals:

Arithmetic
- production-timeline: the headline lead times did not reconcile with
  the stage table on the same page. Launch is 22-49 days (was 21-39),
  mature 11.5-22 (was 14-20), repress 6.5-11.5. Including gates,
  launch is 6-17 weeks, not 8-14.
- Consequence: at 17 weeks the launch configuration is at parity with
  EU/US plants, not ahead of them. The page now compares quote to
  quote rather than a stage sum to a quoted lead time, and says so.
- The galvanics turnaround saving is 1.5-5 weeks, not 3-5.
- scale.md Duplex capacity 300-600k/yr did not reproduce from its own
  stated basis; corrected to 175-540k. production-timeline disagreed
  with scale.md on the same fleet; both now agree.
- "300 units is under an hour of pressing" was out by an order of
  magnitude on the semi-auto line: 5-8 hours.
- project-timeline carried two totals for the same quantity. Now
  27-33 months throughout, with the Gantt's two ordering breaks fixed.
- scale.md: 300 kWp covers 28-45% of consumption, not 20-35%; roof PV
  stated as both 150-200 and 247 kWp for the same roof; parking canopy
  dimensions and PV disagreed with the RFQ.
- RFQ: fire tank stated 200 m3 where both its geometry (254 m3) and
  its own mass (250 t) say 250. Drainage now gives total sealed area
  66%, not the 46% paving figure, since that is what attenuation needs.
- Galvanics payback used only the top of the saving range: 1-5 years,
  not 1-4.

Inference marked as inference
- The 22,000 THB stamper figure is an invoice RESIDUAL. It carries
  lacquer cutting, test pressings, setup and margin, so it is an upper
  bound on the stamper component, not a measurement. Everything derived
  from it now says so, and a line-itemised invoice is the top question.
- The saving was also benchmarked against the wrong supplier: CNX buys
  from Stamper Discs, not a Thai reseller. Stated as 175-665 USD until
  that quote exists.
- The stamper-bottleneck hypothesis now names its alternatives. Jacket
  print runs would produce the same symptom and would constrain CNX
  equally, which would remove the competitive read entirely.
- Competitor capacity relabelled as nameplate times an assumed OEE,
  with the assumed shift pattern stated; all rows on one 300-day basis.
- The fixed/variable decomposition keeps the shape and drops the point
  estimates: the solve point inside the flat 1000-3000 tier is
  arbitrary and moves the fixed component by nearly half.
- "Nobody in Thailand plates" reduced to "we have found no evidence",
  with a desk check named as the action.
- Cut the USD 450-700k valuation of a competitor's presses entirely.
  It extrapolated a semi-auto quote onto a different machine, ignored
  the used market, and supported no decision.
- The collaboration payback divided capex by revenue where the same
  page uses contribution elsewhere: 5-10 years, not 1-3.

Missing caveats added
- No financing is committed or modelled anywhere in this repo;
  project-timeline previously asserted money was not a constraint.
- Leasing cannot pull the launch forward on its own, since the press
  chain governs and construction has float against it.
- The whole competitive analysis is one buyer, one plant, one
  afternoon, and the primary evidence is not archived in the repo.
- ResurRec is a competitor and may decline to buy from a new entrant.
2026-08-06 12:35:37 +07:00
grabowski 20c8d283d5 Rebase costs on USD/THB; add timelines and first market data
Currency
- Base currency moves from EUR to USD and THB throughout. Rates at
  5 Aug 2026: 1 USD = 33 THB, 1 EUR = 1.155 USD, 1 GBP = 1.35 USD.
  EUR/THB lands at ~38, so existing THB research needed no change.
- Vendor quotes keep their original currency with a USD/THB equivalent
  alongside, so they stay checkable against the source PDFs.
- Full vision ~4.7-8.9M USD; phased entry ~1.7-2.9M USD.

New documents
- production-timeline.md: order turnaround stage by stage. Launch
  8-14 weeks, mature 5-10, repress 2-3. Quantifies the in-house
  galvanics turnaround claim the repo had asserted without a number,
  and flags artwork as an unmodelled fourth approval gate.
- project-timeline.md: calendar to first paying release, ~Q4 2028.
  Critical path is BOI certificate to press order to build to
  commissioning. Two findings: Newbilt build time is absent from the
  repo yet carries ~40% of the schedule, and the BOI rule may be
  over-serialised since duty exemption attaches at importation rather
  than at contract signature.

First market data (ResurRec, Bangkok)
- Invoice-derived prices, a factory tour, and a confirmed fleet of one
  Newbilt Classic 12" automatic plus one semi-automatic.
- Price ladder recorded at 300/500/1000-3000/3000+ units. Decomposes
  to roughly 34-50k THB fixed per title and 535-780 THB variable per
  unit, which is 4-7x the price this model assumes.
- The incumbent presses 230-350k records/yr but buys every stamper as
  an import. That single constraint plausibly explains their 150-unit
  floor, their flat discount ladder and their large-run lead time, and
  it is what an in-house galvanics line attacks. Logged as an open
  question on whether galvanics should move from phase 5 to phase 1.
- Inferences are marked as inferences; the whole set is one buyer and
  one plant, and the model is deliberately left unrebased until a
  second data point exists.

Corrections
- Gross margin arithmetic did not follow from its own inputs. Restated
  as ~1.95 USD at the midpoint with the 0.75-3.15 spread shown; the
  previous "40 to 55%" was not supported.
- Direct cost low total 1.50 to 1.45 USD; contingency THB high 40M
  to 38M.
- README indexes the construction RFQ, which was missing.
2026-08-06 12:22:40 +07:00
grabowski 195dbff1f4 Add revenue model: 3.2M-5.9M EUR/yr at full capacity, per-record economics
Blended pressing price, direct cost breakdown, margin, EBITDA and payback
bands; all arithmetic reviewer-recomputed; adverse payback corner stated
honestly alongside mid assumptions
2026-07-17 17:56:23 +07:00