Payap scenario: parametric BIM model of the whole plant on a square plot
A separate FreeCAD 26.3 model (the Mueang Chi model is untouched) sites the plant on a 110 m square placeholder plot of Payap land, built from BIM objects (Arch Site, Buildings and Levels, walls, slabs, columns, beams, a ramp, Spaces with computed areas, Equipment). Every object sits on an expression-driven base, so the Params sheet drives plot, setbacks, floor level, building sizes, fire wall line and office gap (checked: plot 110 to 120 m and factory 84 to 90 m, everything followed). - Factory 84 x 25 m, production only, in process order along a 54 m glazed corridor; press hall 465 m2 with the October fleet (two Duplex systems, each EX 50 + EX 35, and the Classic); crane to the fire wall; machine door and 12 m ramp at the north-west corner. - Office building 24 x 15 m, 12 m away on its own slab with a covered link: reception, offices, meeting/training, mastering and cutting, listening, IT, archive. Resolves the crane-zone conflict of the old sketch. - Utility yard behind the press hall (boiler and chiller flagged for re-sizing), gate, truck apron, car park, service road. - site-candidates: new section and plot-fit note; crane doc: conflict resolved, 54 m corridor; README bullet and layout lines; the old sketch is labelled as Mueang Chi with the earlier fleet.
This commit is contained in:
1 parent
3a758fcffb
commit
f2bb7f3d85
6 files changed
+91
-5
No files matched your search
@@ -123,9 +123,17 @@ The detail lives in dedicated documents:
|
|||||||
it costs
|
it costs
|
||||||
- [Production hall layout sketch](docs/production-hall-layout-sketch.png):
|
- [Production hall layout sketch](docs/production-hall-layout-sketch.png):
|
||||||
a rough BIM sketch in FreeCAD (`docs/production-hall-layout-sketch.FCStd`)
|
a rough BIM sketch in FreeCAD (`docs/production-hall-layout-sketch.FCStd`)
|
||||||
of the 60 x 25 m phase 1 hall: zones in process order along the visitor
|
of the 60 x 25 m phase 1 hall at Mueang Chi, with the fleet before
|
||||||
corridor, the crane zone, room-in-room boxes and the main equipment; every
|
October 2026: zones in process order along the visitor corridor, the
|
||||||
position is an estimate
|
crane zone, room-in-room boxes and the main equipment; every position is
|
||||||
|
an estimate
|
||||||
|
- [Payap scenario model](docs/cnx_vinyl_parametric_payap.png): a parametric
|
||||||
|
BIM model in FreeCAD 26.3 (`docs/cnx_vinyl_parametric_payap.FCStd`,
|
||||||
|
[isometric](docs/cnx_vinyl_parametric_payap-iso.png)) of the whole plant
|
||||||
|
on a square placeholder plot of Payap land: an 84 x 25 m production-only
|
||||||
|
factory with the five-press fleet, a separate office building for
|
||||||
|
offices, mastering and IT, the utility yard and site access, all driven
|
||||||
|
by one parameter sheet
|
||||||
- [Process logging and traceability](docs/traceability.md): end-to-end
|
- [Process logging and traceability](docs/traceability.md): end-to-end
|
||||||
per-order traceability for customers, batch genealogy from audio file to
|
per-order traceability for customers, batch genealogy from audio file to
|
||||||
shipment, and the requirements this sets for the factory software
|
shipment, and the requirements this sets for the factory software
|
||||||
@@ -224,13 +232,16 @@ docs/
|
|||||||
├── artist-platform.md Upload, price calculator, fan-funded pressing
|
├── artist-platform.md Upload, price calculator, fan-funded pressing
|
||||||
├── biomass.md Biomass fuel strategy and the 60 rai coppice idea
|
├── biomass.md Biomass fuel strategy and the 60 rai coppice idea
|
||||||
├── boi.md BOI promotion strategy and requirements
|
├── boi.md BOI promotion strategy and requirements
|
||||||
|
├── cnx_vinyl_parametric_payap.FCStd Payap scenario parametric BIM model
|
||||||
|
├── cnx_vinyl_parametric_payap.png Top view of the Payap model
|
||||||
|
├── cnx_vinyl_parametric_payap-iso.png Isometric view of the Payap model
|
||||||
├── crane-workshop-tours.md Overhead crane, workshop, visitor corridor
|
├── crane-workshop-tours.md Overhead crane, workshop, visitor corridor
|
||||||
├── digital-factory.md Data platform, NixOS/Clan fleet, acquisition, app
|
├── digital-factory.md Data platform, NixOS/Clan fleet, acquisition, app
|
||||||
├── facility-security.md Security, HVAC, fire and life safety, compliance
|
├── facility-security.md Security, HVAC, fire and life safety, compliance
|
||||||
├── payap-partnership.md Joint student programmes with Payap University
|
├── payap-partnership.md Joint student programmes with Payap University
|
||||||
├── plant-operation.html Animated plant overview (simulated SCADA)
|
├── plant-operation.html Animated plant overview (simulated SCADA)
|
||||||
├── process-flow.md Audio file to delivered record, with all checks
|
├── process-flow.md Audio file to delivered record, with all checks
|
||||||
├── production-hall-layout-sketch.FCStd Rough BIM layout sketch of the hall
|
├── production-hall-layout-sketch.FCStd Rough BIM sketch, Mueang Chi hall (earlier fleet)
|
||||||
├── production-hall-layout-sketch.png Top view of the sketch
|
├── production-hall-layout-sketch.png Top view of the sketch
|
||||||
├── production-timeline.md Order turnaround, stage by stage
|
├── production-timeline.md Order turnaround, stage by stage
|
||||||
├── project-timeline.md Calendar to first paying release, critical path
|
├── project-timeline.md Calendar to first paying release, critical path
|
||||||
|
|||||||
Binary file not shown.
|
After Width: | Height: | Size: 331 KiB |
Binary file not shown.
Binary file not shown.
|
After Width: | Height: | Size: 204 KiB |
@@ -297,6 +297,18 @@ conflict to resolve: with the workshop at the ramp end, reception and the
|
|||||||
cutting room sit under the bridge's travel too, against point 6 above
|
cutting room sit under the bridge's travel too, against point 6 above
|
||||||
(cutting room outside the crane zone).
|
(cutting room outside the crane zone).
|
||||||
|
|
||||||
|
The Payap scenario model
|
||||||
|
([cnx_vinyl_parametric_payap.FCStd](cnx_vinyl_parametric_payap.FCStd),
|
||||||
|
[top view](cnx_vinyl_parametric_payap.png); see
|
||||||
|
[site candidates](site-candidates.md#payap-scenario-model-october-2026))
|
||||||
|
resolves that conflict. Mastering and cutting, the offices and IT move
|
||||||
|
into a separate office building, so only production sits under the
|
||||||
|
crane. The tour then starts in the office building, at the cutting-room
|
||||||
|
window and the listening room, and crosses a covered link into a 54 m
|
||||||
|
corridor, inside the 45 to 55 m assumed below. The model also draws the
|
||||||
|
five-press fleet of October 2026; the sketch above still shows the
|
||||||
|
earlier fleet (one Duplex and two Classics).
|
||||||
|
|
||||||
### How it is built
|
### How it is built
|
||||||
|
|
||||||
- **Room-in-room**: a glazed wall on the production side, a solid roof at
|
- **Room-in-room**: a glazed wall on the production side, a solid roof at
|
||||||
|
|||||||
+64
-1
@@ -86,7 +86,9 @@ pharmaceutical facility on the offered land is to be confirmed.
|
|||||||
above ground for the loading docks, helps but is not a flood
|
above ground for the loading docks, helps but is not a flood
|
||||||
assessment.
|
assessment.
|
||||||
5. **Plot fit.** Shape and size against the 60 × 25 m building, the
|
5. **Plot fit.** Shape and size against the 60 × 25 m building, the
|
||||||
detached utility yard and the phase 2 footprint (6 to 8 rai).
|
detached utility yard and the phase 2 footprint (6 to 8 rai). The
|
||||||
|
Payap scenario model below fits the whole plant on a 110 m square
|
||||||
|
(7.6 rai) as drawn.
|
||||||
6. **Galvanics on a campus.** Phase 5 electroplating needs the lessor's
|
6. **Galvanics on a campus.** Phase 5 electroplating needs the lessor's
|
||||||
written consent; the zero-discharge design
|
written consent; the zero-discharge design
|
||||||
([sustainability](sustainability.md)) becomes a lease condition, not
|
([sustainability](sustainability.md)) becomes a lease condition, not
|
||||||
@@ -102,3 +104,64 @@ Nothing has been re-sited. The parametric model, PV roof study, RFQ and
|
|||||||
the fleet site code `lpn` in the [digital factory](digital-factory.md)
|
the fleet site code `lpn` in the [digital factory](digital-factory.md)
|
||||||
stay on Mueang Chi until a Payap plot is known and has passed checks 1
|
stay on Mueang Chi until a Payap plot is known and has passed checks 1
|
||||||
and 2.
|
and 2.
|
||||||
|
|
||||||
|
### Payap scenario model (October 2026)
|
||||||
|
|
||||||
|
To see the plant on Payap land before a plot is known, a separate
|
||||||
|
parametric BIM model sites it on a simple square plot:
|
||||||
|
[cnx_vinyl_parametric_payap.FCStd](cnx_vinyl_parametric_payap.FCStd)
|
||||||
|
(top view [PNG](cnx_vinyl_parametric_payap.png),
|
||||||
|
[isometric](cnx_vinyl_parametric_payap-iso.png)), built in FreeCAD 26.3
|
||||||
|
from BIM walls, slabs, columns, spaces and equipment. Every size and
|
||||||
|
position hangs off its `Params` spreadsheet (plot side, setbacks, floor
|
||||||
|
level, building sizes, fire wall line, office gap), so the square can be
|
||||||
|
swapped for the real plot once Payap names one. It is a layout sketch:
|
||||||
|
every position and every equipment envelope is an estimate.
|
||||||
|
|
||||||
|
- **Plot**: 110 × 110 m (12,100 m², 7.6 rai, inside the 6 to 8 rai of
|
||||||
|
[scale](scale.md)), road assumed on the south side, 6 m setbacks
|
||||||
|
(placeholder).
|
||||||
|
- **Factory, production floor only**: 84 × 25 m at floor level +1.2 m,
|
||||||
|
in process order along a 54 m glazed visitor corridor. From west to
|
||||||
|
east: staff entry and lockers; workshop and spares, with the machine
|
||||||
|
door and a 12 m vehicle ramp at the north-west corner; galvanics clean
|
||||||
|
room and water treatment; stamper prep, PVC lab and material area;
|
||||||
|
compressed air and electrical; the press hall; trim and optical
|
||||||
|
inspection, QC lab, and finishing and packaging. Behind the fire wall
|
||||||
|
at 62 m are the warehouse and dispatch with two dock doors.
|
||||||
|
- The press hall (465 m²) holds two Duplex systems, each two HRP 12
|
||||||
|
presses with an EX 50 and an EX 35, and the Classic
|
||||||
|
([pressing line](equipment/pressing-line.md)).
|
||||||
|
- The 5 t crane runs from the west wall to the fire wall
|
||||||
|
([crane, workshop and tours](crane-workshop-tours.md)).
|
||||||
|
- **Office building, isolated from the factory floor**: 24 × 15 m, single
|
||||||
|
storey, 12 m south of the factory on its own slab and structure, joined
|
||||||
|
by a covered link that lands at the start of the visitor corridor.
|
||||||
|
- It holds reception, offices, a meeting and training room (the
|
||||||
|
[Payap programmes](payap-partnership.md)), mastering and cutting with
|
||||||
|
an inner acoustic lining, the listening room, the IT and server room,
|
||||||
|
the archive, and WC and kitchen.
|
||||||
|
- The lathe sits away from press vibration and outside the crane zone.
|
||||||
|
- **Utility yard** behind the press hall, across a 6 m service lane:
|
||||||
|
- boiler house with chimney and a covered fuel store;
|
||||||
|
- chiller and cooling tower;
|
||||||
|
- process and fire water tanks;
|
||||||
|
- PEA transformer;
|
||||||
|
- a pipe bridge to the press hall.
|
||||||
|
|
||||||
|
Boiler and chiller are drawn at the one-Duplex sizes and need
|
||||||
|
re-sizing for five presses ([scale](scale.md)).
|
||||||
|
- **Access**: one gate on the south side opens onto a truck apron in front
|
||||||
|
of the dock doors, with the car park in front of the office and a
|
||||||
|
service road round the east end to the yard and the ramp.
|
||||||
|
- **Area**: about 2,100 m² of factory plus 360 m² of office, so ~2,460 m²
|
||||||
|
under roof. That is above the 1,400 to 2,000 m² of the [scale](scale.md)
|
||||||
|
zone table, which held one Duplex and an automated zone with the offices
|
||||||
|
inside.
|
||||||
|
- The press hall matches the new fleet.
|
||||||
|
- Warehouse and dispatch (~530 m²) are drawn above that table's 300 to
|
||||||
|
500 m² for packaging and finished goods.
|
||||||
|
|
||||||
|
Both are estimates to settle against the real plot.
|
||||||
|
|
||||||
|
The Mueang Chi model and everything sited on it stay as they are.
|
||||||