Feedwater heat recovery: economizer, condensate, then HP-1
Deploy test site / deploy (push) Successful in 48s
Deploy test site / deploy (push) Successful in 48s
The order to investigate for a fired boiler (biomass such as rice husk, or LPG): first a flue-gas economizer, second as much clean, hot condensate back to T-1 as possible, third the heat pump HP-1 where the press return has enough heat and the combined heating and cooling economics justify it. - Diagram: new ECON-1 (option, fired boilers only) between the feed pumps and the boiler manifold, with a bypass for an electric bank and the flue-gas path from the boilers; feed in 90 to 95 C, outlet and stack temperature are vendor figures. HP-1 is now drawn as an option and labelled the third measure. AT conductivity on the condensate return to T-1; off-spec condensate goes to the warm tank. - Found in Newbilt's offer 240620-04: steam and cooling water share the mould channels, with one steam/water outlet valve and steam trap per mould, so the condensate is only as clean as the cooling loop. Noted in the T-1 detail, sustainability.md and as a Newbilt RFQ question. - With most condensate returned (about 15 % flashes at atmospheric pressure, estimate) the feed tank needs only a fraction of the ~70 kW that heating all make-up takes, so HP-1 may not pay. - RFQ: economizer outlet feed and stack temperature, corrosion limit, pressure drop; rice husk ash is high in silica and abrasive, so fouling, cleaning, wear protection and a bypass. - sustainability.md: the order, before the exclusions. biomass.md: new "Recovering heat at the boiler". Checked headless (scripts/pw_sc_check.py): 33 boxes, 20 tags, no overlap or overflow, no unstyled pipes, no card or page overflow at 1600, 1258 and 390 px in all four cases, every box opens its detail, no errors.
This commit is contained in:
1 parent
b1c18cb040
commit
cb5809e73c
3 files changed
+45
-12
No files matched your search
@@ -137,6 +137,21 @@ reusing it before generating anything new:
|
||||
(electric, LPG, or biomass), it supplies just the last step to 180 °C /
|
||||
10 bar from already-hot feedwater.
|
||||
|
||||
**Order to investigate the feedwater heat recovery (October 2026).** For a
|
||||
fired boiler (biomass such as rice husk, or LPG): first a flue-gas
|
||||
economizer, recovering combustion heat into the boiler feedwater where the
|
||||
flue-gas temperature and corrosion limits allow; second, as much clean, hot
|
||||
condensate back to the feed tank as possible; third, the feedwater heat
|
||||
pump above, where the press cooling return has enough heat and the
|
||||
combined heating and cooling economics justify it. Each step shrinks the
|
||||
next one's job: with most condensate returned the feed tank needs only a
|
||||
fraction of the ~70 kW that heating all make-up would take (estimate), and
|
||||
an electric boiler has no flue gas at all. One caution on condensate: the
|
||||
press moulds take steam and cooling water through the same channels, with
|
||||
one outlet valve and steam trap per mould (Newbilt offer 240620-04), so the
|
||||
returned condensate is only as clean as the cooling loop; it is monitored
|
||||
and diverted when off-spec ([steam and cooling](steam-cooling.html)).
|
||||
|
||||
Two honest exclusions, checked and ruled out:
|
||||
|
||||
- **Heat pumps cannot make the final steam**: commercial steam-generating
|
||||
|
||||
Reference in new issue