Add site massing model for the Mueang Chi candidate parcel
Models the plot and everything on it in FreeCAD, and writes up the decisions the modelling forced. Parcel geometry is traced from the DOL LandsMaps cadastral polygon and reconciled against that portal's own measured edge lengths (40.86 + 26.61 / 166.81 / 42.48 + 14.94 / 152.46 m), which the trace reproduces to within about 1% with 1.67 m of closure error over a 444 m perimeter. Note the mapped extent comes out near 9,570 sqm against a deed area of 8,266 sqm, a ~16% gap that needs a surveyor before any offer. On the site: 60x25 m production building on a 10 degree monopitch, a 45x38 m phase-2 building, roof and carport PV, fire and raw water tanks, a detached boiler/chiller utility yard, perimeter wall and gate, guard house, roofed staff parking, and the loading and fire-access roads. Docs: - scale.md: expansion headroom for a second building, and the detached utility yard, which frees ~126 sqm inside the main shed - sustainability.md: roof orientation study (rotating the building for solar gains under 1 point and costs 4 m of clearance, so it stays aligned to the plot), and a new water supply section - facility-security.md: fire water supply behind the existing suppression design Figures marked as estimates are planning-grade, not engineering calculations; the PV module spec is a generic placeholder, and zoning for factory use on this plot is still unverified.
This commit is contained in:
1 parent
c138177f67
commit
c4d0e08c9f
12 files changed
+205
No files matched your search
@@ -103,6 +103,36 @@ occupied spaces. The design position is zoned suppression:
|
||||
- **Galvanics**: low fire load (aqueous baths); local clean-agent
|
||||
protection for rectifier cabinets is sufficient.
|
||||
|
||||
### Fire water supply
|
||||
|
||||
Sprinklers, water mist, and hose reels are only as good as the water behind
|
||||
them. Mains pressure and flow in Mueang Chi cannot be assumed adequate for a
|
||||
sprinkler demand, so the site carries its own reserve and pumps.
|
||||
|
||||
- **Stored reserve: ~200 m³**, in a dedicated fire water tank (planning
|
||||
figure: 9 m diameter × 4 m, roughly 204 m³ usable above the pump suction).
|
||||
Basis is an Ordinary Hazard Group 2 sprinkler demand of about 1,100 L/min
|
||||
over the design area, plus a 950 L/min hose-stream allowance, held for 90
|
||||
minutes. **This is a planning estimate, not a fire-engineering
|
||||
calculation** — the real number comes out of the hydraulic design.
|
||||
- **Dedicated, not shared**: the reserve is not drawn on by process or
|
||||
sanitary water, and the tank refills automatically.
|
||||
- **Fire pump set**: duty pump, standby pump, and a jockey pump holding
|
||||
ring-main pressure, in a pump house beside the tank. The duty pump needs a
|
||||
power path that survives a plant trip (diesel drive, or a supply ahead of
|
||||
the main breaker) — the BESS is not a substitute.
|
||||
- **Ring main and hydrants** around the building, laid out so an appliance
|
||||
can reach any elevation, with the yard kept clear for access.
|
||||
- **Siting**: the tank stands in the front yard between the road and the
|
||||
building, reachable directly from the frontage without entering the
|
||||
production yard. At 4 m tall it sits well below the building's 7 m low
|
||||
eave, so it never shades the roof PV.
|
||||
|
||||
**Warehouse racking height drives the real number.** If finished-goods
|
||||
storage goes above roughly 3.7 m, the commodity classification and sprinkler
|
||||
design change, and the stored volume grows with them. Fix the racking height
|
||||
before the fire design is frozen, not after.
|
||||
|
||||
The property insurer will drive much of the final specification, so involve
|
||||
them before the design is fixed. The archive gas system and the BESS
|
||||
detection affect room layout and belong in the site design brief early.
|
||||
|
||||
Binary file not shown.
Binary file not shown.
|
After Width: | Height: | Size: 228 KiB |
Binary file not shown.
|
After Width: | Height: | Size: 230 KiB |
Binary file not shown.
|
After Width: | Height: | Size: 164 KiB |
Binary file not shown.
|
After Width: | Height: | Size: 214 KiB |
Binary file not shown.
|
After Width: | Height: | Size: 41 KiB |
Binary file not shown.
|
After Width: | Height: | Size: 105 KiB |
@@ -39,6 +39,72 @@ The HVAC budget in the utilities CSV already assumes ~1,500 m² conditioned.
|
||||
Single story throughout: all heavy equipment needs ground-slab floor
|
||||
loading (multiple tons per m²).
|
||||
|
||||
### Detached utility yard, parking, and what that moves
|
||||
|
||||
The massing model puts the boiler and chiller in a **detached utility yard**
|
||||
alongside the main building rather than inside it, which is what the boiler's
|
||||
own-room requirement in [facility security](facility-security.md) and biomass
|
||||
fuel delivery both push toward:
|
||||
|
||||
| | Area | Height |
|
||||
|---|---|---|
|
||||
| Boiler hall | 66 m² | 6.0 m |
|
||||
| Biomass fuel store | 42 m² | 5.0 m |
|
||||
| Chiller room | 60 m² | 5.0 m |
|
||||
| Cooling tower (outdoor pad) | 10 m² | 3.5 m |
|
||||
| Flue stack | — | 14 m |
|
||||
|
||||
Boiler plus chiller at 126 m² lands inside the 100 to 150 m² the zone table
|
||||
allows — but moving them out of the main shed frees that floor for
|
||||
production, so either the main building shrinks by ~126 m² or the program
|
||||
grows into it. Decide which before the building is priced.
|
||||
|
||||
Staff parking is roofed, in the front yard clear of the loading route:
|
||||
**10 car bays** (25 × 6 m canopy) and **~30 scooter spaces** (14 × 5 m),
|
||||
carrying a further **~32 kWp** of PV on their canopies. At 4.1 m and 3.5 m
|
||||
they sit below the main building's 7.0 m low eave, so they cannot shade it.
|
||||
|
||||
### Expansion headroom: a second building
|
||||
|
||||
Tested against the candidate Mueang Chi parcel, in the massing model at
|
||||
`factory_building_rough.FCStd`. The whole zone table above fits inside one
|
||||
60 × 25 m building, so a second one is expansion **beyond** the current
|
||||
program — doubling pressing capacity, or moving finished goods out to free
|
||||
production floor — not a gap in it.
|
||||
|
||||
| | Phase 1 | Phase 2 | Total |
|
||||
|---|---|---|---|
|
||||
| Footprint | 60 × 25 m — 1,500 m² | 45 × 38 m — 1,710 m² | 3,210 m² |
|
||||
| Roof PV | ~247 kWp | ~251 kWp | **~498 kWp** |
|
||||
| Tightest boundary clearance | 15.7 m | 3.0 m | |
|
||||
|
||||
- **45 × 38 m is the sweet spot.** The plot narrows going south, so past
|
||||
~45 m of length the width falls away faster than length adds: 40 m gives
|
||||
1,607 m², 45 m gives 1,723 m², 50 m drops to 1,558 m², and beyond 65 m
|
||||
nothing useful fits.
|
||||
- **A 20 m yard** between the buildings covers fire separation and shared
|
||||
loading off the phase 1 circulation road.
|
||||
- **Roof form: two-bay sawtooth, shaded rows deliberately left empty.**
|
||||
A single 38 m monopitch would be the best solar answer — 28 panel rows,
|
||||
none shaded, ~17% more yield than what is drawn — but it needs a **13.7 m**
|
||||
high wall. The sawtooth holds the high side to **10.35 m**, at a cost: each
|
||||
bay falls toward ESE onto the next bay's 3.35 m riser, so the bottom rows
|
||||
sit in shadow (the lowest is blocked below a 53° sun profile angle). Those
|
||||
two rows on the first bay are left empty rather than populated, which
|
||||
trades ~8% of the roof's yield for clean strings, no mismatch losses, and
|
||||
a maintenance walkway. Building height won this trade; revisit it if
|
||||
cladding a 13.7 m wall turns out cheaper than the lost generation.
|
||||
A 7° single pitch (11.7 m high side) sits between the two if wanted.
|
||||
- **Coverage stays comfortable**: 3,210 m² is 39% of the deed area (34% of
|
||||
the mapped extent), well under the 50 to 60% typically allowed.
|
||||
- **The two roofs together clear 500 kWp**, which removes the need for the
|
||||
ground-mount solar assumed further down this page.
|
||||
|
||||
Two caveats. Phase 2's tightest corner sits **3.0 m** from the boundary and
|
||||
must be checked against the local ผังเมือง setback rule before it is taken as
|
||||
real. And the plot's zoning for factory use is still unverified — that gates
|
||||
phase 1 every bit as much as phase 2.
|
||||
|
||||
## Land: factory plot
|
||||
|
||||
Industrial plots typically allow 50 to 60% building coverage, and the site
|
||||
|
||||
@@ -42,6 +42,62 @@ at 10 bar / 180 °C) and the 250 kW cooling system.
|
||||
- System sizing (kWp, storage, grid-connection model) is open until the site
|
||||
is chosen.
|
||||
|
||||
### Roof design for PV (candidate Mueang Chi site)
|
||||
|
||||
Sized against the candidate 5-0-66.5 rai parcel in Mueang Chi (18.4708 N,
|
||||
98.9642 E), whose narrow skewed shape fixes how the building can sit. Two
|
||||
findings drove the roof form:
|
||||
|
||||
- **Orientation barely matters at this latitude.** An annual geometric
|
||||
clear-sky model puts the optimum fixed tilt near 18° facing due south, but
|
||||
the response is very flat — at 10° tilt, swinging the azimuth from due
|
||||
south to ESE costs under 2%. Rotating the building toward due south would
|
||||
gain **under one percentage point** of yield while cutting boundary
|
||||
clearance from 16 m to 12 m. The building therefore stays aligned with the
|
||||
plot, which also keeps truck circulation on the site's long axis.
|
||||
- **Roof form matters more than orientation.** The plot puts the long axis on
|
||||
a 212° bearing, so a symmetric gable would strand half the array on a
|
||||
WNW-facing slope worth only ~94% of ideal. A **monopitch roof at 10°,
|
||||
falling toward ESE**, puts the entire roof on one plane at ~98% of ideal
|
||||
and yields a single uninterrupted rectangular array field — simpler
|
||||
racking, stringing, and roof penetrations.
|
||||
|
||||
10° was chosen over a shallower pitch deliberately: the yield difference
|
||||
between 6° and 10° is under 0.2%, but northern Thailand's dry-season dust and
|
||||
burning haze make self-cleaning in the rains worth more than the ~1.8 m of
|
||||
extra building height the steeper pitch costs.
|
||||
|
||||
| Item | Figure |
|
||||
|---|---|
|
||||
| Sloped roof plane | ~1,520 m² |
|
||||
| Module assumed | generic 580 W, 2,278 × 1,134 mm (~225 W/m²) |
|
||||
| Modules (1 m perimeter strip, walkway every 4 rows) | 425 |
|
||||
| Installed capacity | **~247 kWp** |
|
||||
| Array coverage of the roof plane | 72% |
|
||||
| Expected yield | **~335 to 360 MWh/yr** |
|
||||
| Share of mature two-shift use (1,000 to 1,500 MWh/yr) | ~25 to 35% |
|
||||
|
||||
**No module has been selected.** The 580 W / 2,278 × 1,134 mm figure is a
|
||||
generic placeholder for the current large-format n-type TOPCon class (the
|
||||
size and power band shared by Trina Vertex, JA Solar DeepBlue, Longi Hi-MO
|
||||
and Jinko Tiger Neo in their 570 to 600 W ratings), chosen so the layout
|
||||
count is realistic. Capacity scales almost linearly with whatever module is
|
||||
actually procured: the roof fits ~425 modules of that footprint, so a 550 W
|
||||
module gives ~234 kWp and a 620 W module ~264 kWp. String sizing must then be
|
||||
matched to the Deye inverters' MPPT voltage window before anything is fixed.
|
||||
|
||||
Caveat on method: the tilt/azimuth comparison is a geometric clear-sky model,
|
||||
so it is reliable for **ranking** orientations but not for absolute energy.
|
||||
The kWh/kWp figure behind the yield column is the regional 1,400 to 1,500
|
||||
kWh/kWp/yr assumption, derated to ~98% for the ESE azimuth. Confirm against
|
||||
PVGIS or a TMY dataset before committing capital.
|
||||
|
||||
This supersedes the older "150 to 200 kWp on a ~1,500 m² roof" figure in
|
||||
[scale](scale.md), which assumed lower module power density; current
|
||||
large-format modules reach roughly 225 W/m². Roughly 70 m of plot depth
|
||||
remains undeveloped behind the building for ground-mount, which matters if
|
||||
the electric-boiler route is chosen.
|
||||
|
||||
### Energy efficiency architecture: recover before generating
|
||||
|
||||
The deepest efficiency in this plant comes from its own thermodynamics: the
|
||||
@@ -89,6 +145,47 @@ diesel means a fuel tank with price exposure. The electric and biomass paths
|
||||
avoid a fossil tank on the property entirely, which matters for both the
|
||||
sustainability commitments and the BOI story.
|
||||
|
||||
## Water supply
|
||||
|
||||
The zero-discharge commitment below governs water *leaving* the plant. It
|
||||
says nothing about water arriving, and that side is still open: **no source
|
||||
has been confirmed for the candidate site** — PWA mains, a licensed deep
|
||||
well, or both. That choice drives storage, treatment, and part of the
|
||||
utilities budget.
|
||||
|
||||
Estimated demand at mature two-shift operation (16 h/day):
|
||||
|
||||
| Draw | m³/day |
|
||||
|---|---|
|
||||
| Cooling tower evaporation | 6.0 |
|
||||
| Cooling tower blowdown (4 cycles of concentration) | 2.0 |
|
||||
| Boiler makeup + blowdown (80% condensate return) | 1.6 |
|
||||
| Galvanics rinse, after the recycling below | 3.0 |
|
||||
| Domestic, canteen, showers (25 staff) | 2.0 |
|
||||
| **Total** | **~15, call it ~20 with margin** |
|
||||
|
||||
The cooling tower is over half of it — worth remembering when the heat
|
||||
recovery above is sized, because every kW the feedwater heat pump lifts off
|
||||
the chiller is also water the tower does not evaporate.
|
||||
|
||||
Storage is **two tanks, not one**:
|
||||
|
||||
- **Fire reserve ~200 m³** — dedicated, never drawn on by process or
|
||||
domestic, per [facility security](facility-security.md).
|
||||
- **Raw/process ~50 m³ usable** (5 m dia × 3 m) — roughly 2.5 days at peak,
|
||||
feeding a softening/RO skid for boiler feedwater and dosing for the tower.
|
||||
|
||||
A **combined ~250 m³ tank**, with the fire volume protected by taking the
|
||||
process suction from a higher level, is cheaper and has a real side benefit:
|
||||
process turnover stops the fire reserve going stagnant. Worth pricing — but
|
||||
only the fire design and the insurer can approve it, so the split above
|
||||
stands as the safe default until they do.
|
||||
|
||||
Open items: confirm the source, its yield and its quality (a well needs a
|
||||
licence and a pump test; hardness and iron set the treatment spec), and
|
||||
settle whether racking height pushes the fire reserve past 200 m³ before
|
||||
either tank is ordered.
|
||||
|
||||
## Zero contaminated water
|
||||
|
||||
The reference process schematic shows a conventional open "dirty water"
|
||||
|
||||
Reference in new issue