Plan the overhead crane, maintenance workshop and visitor corridor
New docs/crane-workshop-tours.md: a 5 t single-girder EOT crane over the whole production compartment (stops at the warehouse fire wall), a machine door and crane-served workshop/machine bay at the ramp end, and a glazed ground-level visitor corridor along the car-park elevation with stations in process order, its own air and acoustic glazing so tours need no PPE. Covers what each changes in the shell (crane-ready frame, hook height under the 7.0 m eave, no full-height cross walls in the crane zone, room lids and crane hatches), safety, costs and open decisions. Propagated: construction RFQ (crane-ready frame, new section 1c, machine door, accessible 1:12 entrance now required), scale zone table (+210 to 280 m2, total ~1,400 to 2,000 m2), facility security, worker safety, roadmap items 9 and 15, total investment added-scope table, README.
This commit is contained in:
1 parent
81185d8013
commit
917a3eb933
8 files changed
+491
-11
No files matched your search
@@ -16,6 +16,15 @@ commitments:
|
||||
goggles, and process-specific protection) is mandatory per work area, in
|
||||
line with the equipment vendor's site requirements (exhaust work benches,
|
||||
fire protection) and local regulations.
|
||||
- **Lifting and machine service**: the overhead crane needs trained
|
||||
operators and slingers, a lift plan for every machine move, and the
|
||||
periodic engineer inspections Thai law sets for cranes. A machine is
|
||||
only disconnected and lifted after lockout: electrical isolation, steam
|
||||
vented, hydraulics depressurised including the accumulator. Welding and
|
||||
grinding stay in the workshop's hot-work corner under a permit. Detail
|
||||
in [crane, workshop and tours](crane-workshop-tours.md).
|
||||
- **Visitors** never share the floor's hazards: tours run in a glazed
|
||||
corridor with its own air and no PPE requirement.
|
||||
|
||||
Safety infrastructure (training program, clean-room specification,
|
||||
decontamination workflow) will be planned alongside the equipment, not after
|
||||
|
||||