Plan the overhead crane, maintenance workshop and visitor corridor
New docs/crane-workshop-tours.md: a 5 t single-girder EOT crane over the whole production compartment (stops at the warehouse fire wall), a machine door and crane-served workshop/machine bay at the ramp end, and a glazed ground-level visitor corridor along the car-park elevation with stations in process order, its own air and acoustic glazing so tours need no PPE. Covers what each changes in the shell (crane-ready frame, hook height under the 7.0 m eave, no full-height cross walls in the crane zone, room lids and crane hatches), safety, costs and open decisions. Propagated: construction RFQ (crane-ready frame, new section 1c, machine door, accessible 1:12 entrance now required), scale zone table (+210 to 280 m2, total ~1,400 to 2,000 m2), facility security, worker safety, roadmap items 9 and 15, total investment added-scope table, README.
This commit is contained in:
1 parent
81185d8013
commit
917a3eb933
8 files changed
+491
-11
No files matched your search
@@ -85,6 +85,12 @@ The detail lives in dedicated documents:
|
||||
control, CCTV, whole-factory HVAC (temperature, humidity, PM), archive and
|
||||
audio protection, fire and life safety, plant monitoring, Thai compliance
|
||||
anchors
|
||||
- [Overhead crane, workshop and visitor corridor](docs/crane-workshop-tours.md):
|
||||
a 5 t crane over the whole production floor to move machines in and
|
||||
out, a crane-served maintenance workshop and machine bay at the ramp
|
||||
end, and a glazed ground-level corridor for guided tours without noise,
|
||||
dust or plating chemistry; what each changes in the building and what
|
||||
it costs
|
||||
- [Process logging and traceability](docs/traceability.md): end-to-end
|
||||
per-order traceability for customers, batch genealogy from audio file to
|
||||
shipment, and the requirements this sets for the factory software
|
||||
@@ -151,6 +157,7 @@ docs/
|
||||
├── suppliers/ Supplier contacts, vendor landscape, supplier map
|
||||
├── biomass.md Biomass fuel strategy and the 60 rai coppice idea
|
||||
├── boi.md BOI promotion strategy and requirements
|
||||
├── crane-workshop-tours.md Overhead crane, workshop, visitor corridor
|
||||
├── digital-factory.md Data platform, NixOS/Clan fleet, acquisition, app
|
||||
├── facility-security.md Security, HVAC, fire and life safety, compliance
|
||||
├── process-flow.md Audio file to delivered record, with all checks
|
||||
|
||||
Reference in new issue
Block a user