Payap model: Duplex cells at Newbilt sizes; fire water per facility-security
User, October 2026: the Duplex sketch is not to scale, check it against the documents; the fire water tank is too small. Model (changed live in the open FreeCAD 26.3 document): - both Duplex cells rebuilt in the sketched arrangement at the documented sizes: presses 0.95 m square (0.9 m2) turned 45 deg, EX 50 0.5 x 1.0 m (0.5 m2), EX 35 0.4 x 0.8 m and trimmer 0.6 x 0.6 m (estimates), operator position marked; 0.6 to 0.8 m between machines; - fire water: the ~25 m3 yard tank replaced by the facility-security planning tank, 9 m x 4 m (254 m3 gross, ~200 m3 usable), new params fw_dia, fw_h, fw_x, fw_y, at the front by the access road, outside the production yard, on a ring foundation, with a pump house (duty electric, standby diesel, jockey); the yard process water tank is now the 5 x 3 m raw water tank of the phase 1 RFQ. Docs: site-candidates (cell, raw water, fire water bullet), facility-security (the Payap model draws the tank; 6 m racking and twice the floor area make ~200 m3 a floor there).
This commit is contained in:
1 parent
7da64088ce
commit
90697c8cac
5 files changed
+18
-3
No files matched your search
@@ -136,7 +136,12 @@ sprinkler demand, so the site carries its own reserve and pumps.
|
||||
**Warehouse racking height drives the real number.** If finished-goods
|
||||
storage goes above roughly 3.7 m, the commodity classification and sprinkler
|
||||
design change, and the stored volume grows with them. Fix the racking height
|
||||
before the fire design is frozen, not after.
|
||||
before the fire design is frozen, not after. The
|
||||
[Payap scenario model](site-candidates.md#payap-scenario-model-october-2026)
|
||||
draws the 9 m × 4 m tank with its pump house at the front. It also draws
|
||||
6 m warehouse racking and about twice the floor area this figure was
|
||||
based on, a paper store among it, so treat ~200 m³ as a floor there,
|
||||
not as the answer.
|
||||
|
||||
The property insurer will drive much of the final specification, so involve
|
||||
them before the design is fixed. The archive gas system and the BESS
|
||||
|
||||
Reference in new issue