diff --git a/docs/cnx_vinyl_parametric_payap-iso.png b/docs/cnx_vinyl_parametric_payap-iso.png index aee7ba5..2e751c1 100644 Binary files a/docs/cnx_vinyl_parametric_payap-iso.png and b/docs/cnx_vinyl_parametric_payap-iso.png differ diff --git a/docs/cnx_vinyl_parametric_payap.FCStd b/docs/cnx_vinyl_parametric_payap.FCStd index cd6aed7..5c6ea83 100644 Binary files a/docs/cnx_vinyl_parametric_payap.FCStd and b/docs/cnx_vinyl_parametric_payap.FCStd differ diff --git a/docs/cnx_vinyl_parametric_payap.png b/docs/cnx_vinyl_parametric_payap.png index 4b318ca..567962c 100644 Binary files a/docs/cnx_vinyl_parametric_payap.png and b/docs/cnx_vinyl_parametric_payap.png differ diff --git a/docs/facility-security.md b/docs/facility-security.md index 9dd0e97..a19714e 100644 --- a/docs/facility-security.md +++ b/docs/facility-security.md @@ -136,7 +136,12 @@ sprinkler demand, so the site carries its own reserve and pumps. **Warehouse racking height drives the real number.** If finished-goods storage goes above roughly 3.7 m, the commodity classification and sprinkler design change, and the stored volume grows with them. Fix the racking height -before the fire design is frozen, not after. +before the fire design is frozen, not after. The +[Payap scenario model](site-candidates.md#payap-scenario-model-october-2026) +draws the 9 m × 4 m tank with its pump house at the front. It also draws +6 m warehouse racking and about twice the floor area this figure was +based on, a paper store among it, so treat ~200 m³ as a floor there, +not as the answer. The property insurer will drive much of the final specification, so involve them before the design is fixed. The archive gas system and the BESS diff --git a/docs/site-candidates.md b/docs/site-candidates.md index 155813a..0d5b2aa 100644 --- a/docs/site-candidates.md +++ b/docs/site-candidates.md @@ -146,7 +146,10 @@ and every equipment envelope is an estimate. ([pressing line](equipment/pressing-line.md)). - **Press hall** (~870 m²): two Duplex systems, each two HRP 12 presses with an EX 50 and an EX 35, the Classic, and ten more Classic - positions in two rows. + positions in two rows. Each Duplex is one operator's cell of about + 5 × 3 m at Newbilt's machine sizes: presses either side turned + towards the operator, the extruders behind him, one trimmer in front + ([pressing line](equipment/pressing-line.md)). - **One shared hydraulic and compressed-air supply**: a central plant room (~62 m²) at the west end of the press hall, and a service trench along the press rows for the hydraulic ring main, compressed air, @@ -199,13 +202,20 @@ and every equipment envelope is an estimate. - **Utility yard** behind the press hall, across a 6 m lane: - boiler house with chimney and a covered fuel store; - chiller and cooling tower; - - process and fire water tanks; + - a raw water tank (5 m × 3 m, as in the phase 1 RFQ); - PEA transformer; - a pipe bridge that drops into the service trench. Boiler, chiller and transformer are drawn at the one-Duplex sizes. They need re-sizing for five presses, and again if the Classics are added ([scale](scale.md)). +- **Fire water** at the front, reachable from the frontage without + entering the production yard + ([facility security](facility-security.md#fire-water-supply)): a + 9 m × 4 m tank (~200 m³ usable, planning figure) on a ring foundation, + with a pump house for the duty (electric), standby (diesel) and jockey + pumps. The model's 6 m warehouse racking and its larger buildings will + raise the volume; the hydraulic design sets it. - **Access**: - one gate on the south side opens onto a truck apron in front of the dock doors;