Payap model v4: colour store, silos, two-storey finishing and print block

User, October 2026: ground-floor colour store plus outdoor silos; a
two-storey block at the east end with packaging below and printing plus
print and packaging stock above; in-house printing not decided, so the
print room is reserved only.

Model (rebuilt live in FreeCAD 26.3 after checking a copy of the saved
file for user edits; parametric check plot 150->160 m and upper floor
3.8->4.2 m passed):
- factory 128 x 25 m, plot 150 m (14.1 rai), corridor 98 m, fire wall
  at 106 m, new params crane_x (runway end = press hall end, 92 m) and
  mezz_z (+3.8 m);
- galvanics open to stamper prep (wall kept only on the material area
  and electrical side);
- colour store 10 m bay (~180 m2): two racking rows, ~100 pallet
  positions on 4 levels (estimate), weighing and mixing, vacuum
  conveying station; indoor silos replaced by regrind bins;
- 4 outdoor PVC silos (2 black, 2 standard colours, ~50 m3 each,
  estimate), big-bag filling station, buried conveying lines;
- finishing and print block 14 x 25 m: ground floor trim, optical
  inspection, QC, packaging (tables, shrink wrap, pallet wrapper), stair
  (Arch Stairs) and goods lift; upper floor print room (reserved), print
  stock, packaging materials.
New docs/cnx_vinyl_parametric_payap-block.png with both block levels.

Docs: site-candidates Payap section rewritten (areas ~3,800 m2 under
roof, ~4,630 m2 of floor), crane doc (98 m corridor, runway ends at the
press hall), README bullet and layout line.
This commit is contained in:
grabowski committed 2026-10-10 17:21:44 +07:00
1 parent d9f3a4b88e
commit 83840d45dc
7 files changed
+77 -39

No files matched your search

+7 -3
View File
@@ -130,9 +130,12 @@ The detail lives in dedicated documents:
- [Payap scenario model](docs/cnx_vinyl_parametric_payap.png): a parametric - [Payap scenario model](docs/cnx_vinyl_parametric_payap.png): a parametric
BIM model in FreeCAD 26.3 (`docs/cnx_vinyl_parametric_payap.FCStd`, BIM model in FreeCAD 26.3 (`docs/cnx_vinyl_parametric_payap.FCStd`,
[isometric](docs/cnx_vinyl_parametric_payap-iso.png)) of the whole plant [isometric](docs/cnx_vinyl_parametric_payap-iso.png)) of the whole plant
on a square placeholder plot of Payap land: a 112 x 25 m production-only on a square placeholder plot of Payap land: a 128 x 25 m production-only
factory with the five-press fleet, room for ten more Classics and one factory with the five-press fleet, room for ten more Classics, one
shared hydraulic and air plant, a separate two-storey office building shared hydraulic and air plant, a colour store with outdoor silos and a
two-storey finishing and print block
([plans](docs/cnx_vinyl_parametric_payap-block.png)), a separate
two-storey office building
([floor plans](docs/cnx_vinyl_parametric_payap-office.png): canteen, ([floor plans](docs/cnx_vinyl_parametric_payap-office.png): canteen,
changing rooms and showers, mastering and listening below; ~150 m² of changing rooms and showers, mastering and listening below; ~150 m² of
offices, training room and IT above), a separate water treatment offices, training room and IT above), a separate water treatment
@@ -240,6 +243,7 @@ docs/
├── cnx_vinyl_parametric_payap.png Top view of the Payap model ├── cnx_vinyl_parametric_payap.png Top view of the Payap model
├── cnx_vinyl_parametric_payap-iso.png Isometric view of the Payap model ├── cnx_vinyl_parametric_payap-iso.png Isometric view of the Payap model
├── cnx_vinyl_parametric_payap-office.png Office building floor plans ├── cnx_vinyl_parametric_payap-office.png Office building floor plans
├── cnx_vinyl_parametric_payap-block.png Finishing and print block plans
├── crane-workshop-tours.md Overhead crane, workshop, visitor corridor ├── crane-workshop-tours.md Overhead crane, workshop, visitor corridor
├── digital-factory.md Data platform, NixOS/Clan fleet, acquisition, app ├── digital-factory.md Data platform, NixOS/Clan fleet, acquisition, app
├── facility-security.md Security, HVAC, fire and life safety, compliance ├── facility-security.md Security, HVAC, fire and life safety, compliance
Binary file not shown.

After

Width:  |  Height:  |  Size: 232 KiB

Binary file not shown.

Before

Width:  |  Height:  |  Size: 387 KiB

After

Width:  |  Height:  |  Size: 384 KiB

Binary file not shown.
Binary file not shown.

Before

Width:  |  Height:  |  Size: 252 KiB

After

Width:  |  Height:  |  Size: 285 KiB

+6 -2
View File
@@ -319,9 +319,13 @@ The Payap scenario model
resolves that conflict. Mastering and cutting, the offices and IT move resolves that conflict. Mastering and cutting, the offices and IT move
into a separate office building, so only production sits under the into a separate office building, so only production sits under the
crane. The tour then starts in the office building, at the cutting-room crane. The tour then starts in the office building, at the cutting-room
window and the listening room, and crosses a covered link into an 82 m window and the listening room, and crosses a covered link into a 98 m
corridor. That is longer than the 45 to 55 m assumed below, because the corridor. That is longer than the 45 to 55 m assumed below, because the
press hall keeps room for ten more Classics. The model also draws the press hall keeps room for ten more Classics and a colour store sits
before it. In that model the crane runway ends at the press hall:
finishing and packaging sit beyond it in a two-storey block with the
print room and stocks upstairs, which the crane cannot serve, so loads
there move by forklift and goods lift. The model also draws the
five-press fleet of October 2026; the sketch above still shows the five-press fleet of October 2026; the sketch above still shows the
earlier fleet (one Duplex and two Classics). earlier fleet (one Duplex and two Classics).
+64 -34
View File
@@ -87,8 +87,8 @@ pharmaceutical facility on the offered land is to be confirmed.
assessment. assessment.
5. **Plot fit.** Shape and size against the 60 × 25 m building, the 5. **Plot fit.** Shape and size against the 60 × 25 m building, the
detached utility yard and the phase 2 footprint (6 to 8 rai). The detached utility yard and the phase 2 footprint (6 to 8 rai). The
Payap scenario model below needs a 135 m square (11.4 rai) as drawn, Payap scenario model below needs a 150 m square (14.1 rai) as drawn,
with room for ten more Classics and a reserve. with room for ten more Classics, a colour store and a reserve.
6. **Galvanics on a campus.** Phase 5 electroplating needs the lessor's 6. **Galvanics on a campus.** Phase 5 electroplating needs the lessor's
written consent; the zero-discharge design written consent; the zero-discharge design
([sustainability](sustainability.md)) becomes a lease condition, not ([sustainability](sustainability.md)) becomes a lease condition, not
@@ -112,37 +112,66 @@ parametric BIM model sites it on a simple square plot:
[cnx_vinyl_parametric_payap.FCStd](cnx_vinyl_parametric_payap.FCStd) [cnx_vinyl_parametric_payap.FCStd](cnx_vinyl_parametric_payap.FCStd)
(top view [PNG](cnx_vinyl_parametric_payap.png), (top view [PNG](cnx_vinyl_parametric_payap.png),
[isometric](cnx_vinyl_parametric_payap-iso.png)), built in FreeCAD 26.3 [isometric](cnx_vinyl_parametric_payap-iso.png)), built in FreeCAD 26.3
from BIM walls, slabs, columns, spaces and equipment. Every size and from BIM walls, slabs, columns, stairs, spaces and equipment. Every size
position hangs off its `Params` spreadsheet (plot side, setbacks, floor and position hangs off its `Params` spreadsheet (plot side, setbacks,
level, building sizes, fire wall line, office and water treatment gaps), floor level, building sizes, fire wall and crane lines, upper floor
so the square can be swapped for the real plot once Payap names one. It level, office and water treatment gaps), so the square can be swapped for
is a layout sketch: every position and every equipment envelope is an the real plot once Payap names one. It is a layout sketch: every position
estimate. and every equipment envelope is an estimate.
- **Plot**: 135 × 135 m (18,225 m², 11.4 rai), road assumed on the south - **Plot**: 150 × 150 m (22,500 m², 14.1 rai), road assumed on the south
side, 6 m setbacks (placeholder). That is more than the 6 to 8 rai of side, 6 m setbacks (placeholder). That is about twice the 6 to 8 rai of
[scale](scale.md): the factory keeps room for ten more Classics, and the [scale](scale.md): the factory keeps room for ten more Classics and a
plot keeps a reserve in front for a second hall or a PV field. colour store, and the plot keeps a reserve in front for a second hall
- **Factory, production floor only**: 112 × 25 m at floor level +1.2 m, or a PV field.
16 frame bays, in process order along an 82 m glazed visitor corridor. - **Factory, production floor only**: 128 × 25 m at floor level +1.2 m,
From west to east: staff entry (PPE, WC); workshop and spares, with 16 frame bays, in process order along a 98 m glazed visitor corridor.
the machine door and a 12 m vehicle ramp at the north-west corner; From west to east:
galvanics clean room with a chemical day store; stamper prep, PVC lab, - staff entry (PPE, WC);
material area and the electrical room; the press hall; trim and optical - workshop and spares, with the machine door and a 12 m vehicle ramp
inspection, QC lab, and finishing and packaging. Behind the fire wall at at the north-west corner;
90 m are the warehouse and dispatch with two dock doors. - the galvanics clean room with a chemical day store, open to stamper
- The press hall (~870 m²) holds two Duplex systems, each two HRP 12 prep (no wall between them);
presses with an EX 50 and an EX 35, the Classic, and **ten more - PVC lab, regrind and conveying, the electrical room;
Classic positions** in two rows - the colour store;
- the press hall;
- the two-storey finishing and print block;
- behind the fire wall at 106 m, the warehouse and dispatch with two
dock doors.
Inside it:
- **Colour store** (~180 m²): pallet racking for the tens of colours
that special designs need, about 100 positions on four levels
(estimate), with weighing and mixing and a vacuum conveying station
([pressing line](equipment/pressing-line.md)). ([pressing line](equipment/pressing-line.md)).
- **Press hall** (~870 m²): two Duplex systems, each two HRP 12 presses
with an EX 50 and an EX 35, the Classic, and ten more Classic
positions in two rows.
- **One shared hydraulic and compressed-air supply**: a central plant - **One shared hydraulic and compressed-air supply**: a central plant
room (~62 m²) at the west end of the press hall, and a service trench room (~62 m²) at the west end of the press hall, and a service trench
along the press rows for the hydraulic ring main, compressed air, along the press rows for the hydraulic ring main, compressed air,
steam and cooling water. steam and cooling water.
- **Finishing and print block**, 14 × 25 m on two levels, beyond the
end of the crane runway
([plans](cnx_vinyl_parametric_payap-block.png)).
- Ground floor: trim and optical inspection, the QC lab, and
packaging (~170 m²) with packing tables, shrink wrap and a pallet
wrapper next to the fire shutter into the warehouse.
- Upper floor at +3.8 m: a print room kept in reserve (in-house
printing is not decided; jackets come from a print partner today,
[production timeline](production-timeline.md)), the print stock
(paper, board) and the packaging materials (sleeves, inner bags,
mailers, cartons).
- A stair and a goods lift connect the floors. Heavy compound stays
on the ground floor.
- The workshop (~200 m²) is fully equipped, with 3D printers, a lathe - The workshop (~200 m²) is fully equipped, with 3D printers, a lathe
and a small CNC mill among the tools and a small CNC mill among the tools
([crane, workshop and tours](crane-workshop-tours.md)). ([crane, workshop and tours](crane-workshop-tours.md)).
- The 5 t crane runs from the west wall to the fire wall. - The 5 t crane runs from the west wall to the end of the press hall.
- **PVC silos** (proposed), outside on the north side of the lane:
- two for black, two for standard colours, ~50 m³ each (estimate);
- a big-bag filling station;
- buried conveying lines to the colour store.
- **Water treatment building**, separate, 12 × 10 m at ground level - **Water treatment building**, separate, 12 × 10 m at ground level
directly behind galvanics: zero-discharge effluent treatment, the DI directly behind galvanics: zero-discharge effluent treatment, the DI
water plant and the chemical store. A buried duct carries the effluent water plant and the chemical store. A buried duct carries the effluent
@@ -182,16 +211,17 @@ estimate.
dock doors; dock doors;
- an access road runs along the south boundary to the car park, with - an access road runs along the south boundary to the car park, with
a footpath to the office; a footpath to the office;
- a lane behind the factory serves the yard, the water treatment - a lane behind the factory serves the yard, the silos, the water
building and the ramp. The low-loader's swept path at the ramp still treatment building and the ramp. The low-loader's swept path at the
needs checking. ramp still needs checking.
- **Area**: about 2,800 m² of factory, 480 m² of office footprint (~960 - **Area**: about 3,200 m² of factory plus a 350 m² upper floor, a 480 m²
m² on two floors) and 120 m² of water treatment, so ~3,400 m² under roof office footprint (~960 m² on two floors) and 120 m² of water treatment:
plus the boiler house, and ~3,880 m² of floor. That is ~3,800 m² under roof plus the boiler house, and ~4,630 m² of floor.
well above the 1,400 to 2,000 m² of the [scale](scale.md) zone table, That is about twice the 1,400 to 2,000 m² of the [scale](scale.md) zone
which held one Duplex and an automated zone with the offices inside. table, which held one Duplex and an automated zone with the offices
- Two thirds of the difference is the press hall with its expansion inside.
floor. - Most of the difference is the press hall with its expansion floor,
the colour store and the finishing and print block.
- Warehouse and dispatch (~530 m²) are drawn above that table's 300 to - Warehouse and dispatch (~530 m²) are drawn above that table's 300 to
500 m² for packaging and finished goods. 500 m² for packaging and finished goods.