User, October 2026: ground-floor colour store plus outdoor silos; a two-storey block at the east end with packaging below and printing plus print and packaging stock above; in-house printing not decided, so the print room is reserved only. Model (rebuilt live in FreeCAD 26.3 after checking a copy of the saved file for user edits; parametric check plot 150->160 m and upper floor 3.8->4.2 m passed): - factory 128 x 25 m, plot 150 m (14.1 rai), corridor 98 m, fire wall at 106 m, new params crane_x (runway end = press hall end, 92 m) and mezz_z (+3.8 m); - galvanics open to stamper prep (wall kept only on the material area and electrical side); - colour store 10 m bay (~180 m2): two racking rows, ~100 pallet positions on 4 levels (estimate), weighing and mixing, vacuum conveying station; indoor silos replaced by regrind bins; - 4 outdoor PVC silos (2 black, 2 standard colours, ~50 m3 each, estimate), big-bag filling station, buried conveying lines; - finishing and print block 14 x 25 m: ground floor trim, optical inspection, QC, packaging (tables, shrink wrap, pallet wrapper), stair (Arch Stairs) and goods lift; upper floor print room (reserved), print stock, packaging materials. New docs/cnx_vinyl_parametric_payap-block.png with both block levels. Docs: site-candidates Payap section rewritten (areas ~3,800 m2 under roof, ~4,630 m2 of floor), crane doc (98 m corridor, runway ends at the press hall), README bullet and layout line.
This commit is contained in:
1 parent
d9f3a4b88e
commit
83840d45dc
7 files changed
+77
-39
No files matched your search
+64
-34
@@ -87,8 +87,8 @@ pharmaceutical facility on the offered land is to be confirmed.
|
||||
assessment.
|
||||
5. **Plot fit.** Shape and size against the 60 × 25 m building, the
|
||||
detached utility yard and the phase 2 footprint (6 to 8 rai). The
|
||||
Payap scenario model below needs a 135 m square (11.4 rai) as drawn,
|
||||
with room for ten more Classics and a reserve.
|
||||
Payap scenario model below needs a 150 m square (14.1 rai) as drawn,
|
||||
with room for ten more Classics, a colour store and a reserve.
|
||||
6. **Galvanics on a campus.** Phase 5 electroplating needs the lessor's
|
||||
written consent; the zero-discharge design
|
||||
([sustainability](sustainability.md)) becomes a lease condition, not
|
||||
@@ -112,37 +112,66 @@ parametric BIM model sites it on a simple square plot:
|
||||
[cnx_vinyl_parametric_payap.FCStd](cnx_vinyl_parametric_payap.FCStd)
|
||||
(top view [PNG](cnx_vinyl_parametric_payap.png),
|
||||
[isometric](cnx_vinyl_parametric_payap-iso.png)), built in FreeCAD 26.3
|
||||
from BIM walls, slabs, columns, spaces and equipment. Every size and
|
||||
position hangs off its `Params` spreadsheet (plot side, setbacks, floor
|
||||
level, building sizes, fire wall line, office and water treatment gaps),
|
||||
so the square can be swapped for the real plot once Payap names one. It
|
||||
is a layout sketch: every position and every equipment envelope is an
|
||||
estimate.
|
||||
from BIM walls, slabs, columns, stairs, spaces and equipment. Every size
|
||||
and position hangs off its `Params` spreadsheet (plot side, setbacks,
|
||||
floor level, building sizes, fire wall and crane lines, upper floor
|
||||
level, office and water treatment gaps), so the square can be swapped for
|
||||
the real plot once Payap names one. It is a layout sketch: every position
|
||||
and every equipment envelope is an estimate.
|
||||
|
||||
- **Plot**: 135 × 135 m (18,225 m², 11.4 rai), road assumed on the south
|
||||
side, 6 m setbacks (placeholder). That is more than the 6 to 8 rai of
|
||||
[scale](scale.md): the factory keeps room for ten more Classics, and the
|
||||
plot keeps a reserve in front for a second hall or a PV field.
|
||||
- **Factory, production floor only**: 112 × 25 m at floor level +1.2 m,
|
||||
16 frame bays, in process order along an 82 m glazed visitor corridor.
|
||||
From west to east: staff entry (PPE, WC); workshop and spares, with
|
||||
the machine door and a 12 m vehicle ramp at the north-west corner;
|
||||
galvanics clean room with a chemical day store; stamper prep, PVC lab,
|
||||
material area and the electrical room; the press hall; trim and optical
|
||||
inspection, QC lab, and finishing and packaging. Behind the fire wall at
|
||||
90 m are the warehouse and dispatch with two dock doors.
|
||||
- The press hall (~870 m²) holds two Duplex systems, each two HRP 12
|
||||
presses with an EX 50 and an EX 35, the Classic, and **ten more
|
||||
Classic positions** in two rows
|
||||
- **Plot**: 150 × 150 m (22,500 m², 14.1 rai), road assumed on the south
|
||||
side, 6 m setbacks (placeholder). That is about twice the 6 to 8 rai of
|
||||
[scale](scale.md): the factory keeps room for ten more Classics and a
|
||||
colour store, and the plot keeps a reserve in front for a second hall
|
||||
or a PV field.
|
||||
- **Factory, production floor only**: 128 × 25 m at floor level +1.2 m,
|
||||
16 frame bays, in process order along a 98 m glazed visitor corridor.
|
||||
From west to east:
|
||||
- staff entry (PPE, WC);
|
||||
- workshop and spares, with the machine door and a 12 m vehicle ramp
|
||||
at the north-west corner;
|
||||
- the galvanics clean room with a chemical day store, open to stamper
|
||||
prep (no wall between them);
|
||||
- PVC lab, regrind and conveying, the electrical room;
|
||||
- the colour store;
|
||||
- the press hall;
|
||||
- the two-storey finishing and print block;
|
||||
- behind the fire wall at 106 m, the warehouse and dispatch with two
|
||||
dock doors.
|
||||
|
||||
Inside it:
|
||||
- **Colour store** (~180 m²): pallet racking for the tens of colours
|
||||
that special designs need, about 100 positions on four levels
|
||||
(estimate), with weighing and mixing and a vacuum conveying station
|
||||
([pressing line](equipment/pressing-line.md)).
|
||||
- **Press hall** (~870 m²): two Duplex systems, each two HRP 12 presses
|
||||
with an EX 50 and an EX 35, the Classic, and ten more Classic
|
||||
positions in two rows.
|
||||
- **One shared hydraulic and compressed-air supply**: a central plant
|
||||
room (~62 m²) at the west end of the press hall, and a service trench
|
||||
along the press rows for the hydraulic ring main, compressed air,
|
||||
steam and cooling water.
|
||||
- **Finishing and print block**, 14 × 25 m on two levels, beyond the
|
||||
end of the crane runway
|
||||
([plans](cnx_vinyl_parametric_payap-block.png)).
|
||||
- Ground floor: trim and optical inspection, the QC lab, and
|
||||
packaging (~170 m²) with packing tables, shrink wrap and a pallet
|
||||
wrapper next to the fire shutter into the warehouse.
|
||||
- Upper floor at +3.8 m: a print room kept in reserve (in-house
|
||||
printing is not decided; jackets come from a print partner today,
|
||||
[production timeline](production-timeline.md)), the print stock
|
||||
(paper, board) and the packaging materials (sleeves, inner bags,
|
||||
mailers, cartons).
|
||||
- A stair and a goods lift connect the floors. Heavy compound stays
|
||||
on the ground floor.
|
||||
- The workshop (~200 m²) is fully equipped, with 3D printers, a lathe
|
||||
and a small CNC mill among the tools
|
||||
([crane, workshop and tours](crane-workshop-tours.md)).
|
||||
- The 5 t crane runs from the west wall to the fire wall.
|
||||
- The 5 t crane runs from the west wall to the end of the press hall.
|
||||
- **PVC silos** (proposed), outside on the north side of the lane:
|
||||
- two for black, two for standard colours, ~50 m³ each (estimate);
|
||||
- a big-bag filling station;
|
||||
- buried conveying lines to the colour store.
|
||||
- **Water treatment building**, separate, 12 × 10 m at ground level
|
||||
directly behind galvanics: zero-discharge effluent treatment, the DI
|
||||
water plant and the chemical store. A buried duct carries the effluent
|
||||
@@ -182,16 +211,17 @@ estimate.
|
||||
dock doors;
|
||||
- an access road runs along the south boundary to the car park, with
|
||||
a footpath to the office;
|
||||
- a lane behind the factory serves the yard, the water treatment
|
||||
building and the ramp. The low-loader's swept path at the ramp still
|
||||
needs checking.
|
||||
- **Area**: about 2,800 m² of factory, 480 m² of office footprint (~960
|
||||
m² on two floors) and 120 m² of water treatment, so ~3,400 m² under roof
|
||||
plus the boiler house, and ~3,880 m² of floor. That is
|
||||
well above the 1,400 to 2,000 m² of the [scale](scale.md) zone table,
|
||||
which held one Duplex and an automated zone with the offices inside.
|
||||
- Two thirds of the difference is the press hall with its expansion
|
||||
floor.
|
||||
- a lane behind the factory serves the yard, the silos, the water
|
||||
treatment building and the ramp. The low-loader's swept path at the
|
||||
ramp still needs checking.
|
||||
- **Area**: about 3,200 m² of factory plus a 350 m² upper floor, a 480 m²
|
||||
office footprint (~960 m² on two floors) and 120 m² of water treatment:
|
||||
~3,800 m² under roof plus the boiler house, and ~4,630 m² of floor.
|
||||
That is about twice the 1,400 to 2,000 m² of the [scale](scale.md) zone
|
||||
table, which held one Duplex and an automated zone with the offices
|
||||
inside.
|
||||
- Most of the difference is the press hall with its expansion floor,
|
||||
the colour store and the finishing and print block.
|
||||
- Warehouse and dispatch (~530 m²) are drawn above that table's 300 to
|
||||
500 m² for packaging and finished goods.
|
||||
|
||||
|
||||