Re-base scale, pressing line, roadmap, revenue model and calculator on the launch plant
Deploy test site / deploy (push) Successful in 48s
Deploy test site / deploy (push) Successful in 48s
Launch plant (user, October 2026): one Duplex system and one Classic, with cutting and galvanics in-house, everything in one capital round. - scale.md: capacity table now launch plant 0.71-0.97M records/yr, the second Duplex as a growth option; launch utilities (450-540 kg/h on B-1/B-2, ~390 kW on 2 x 250 kW); calculator figure ~0.94M. - pressing-line.md: launch plant section on top; five-press fleet kept as the layout fleet the hall and backbone are built for. - roadmap.md: long-lead orders for the launch plant, no bridge stampers or outsourced cutting, commissioning order, what stays revenue-gated. - revenue-model.md: operating picture of the launch plant: central revenue ~3.75M USD, EBITDA ~1.6M, operating profit ~1.1M, payback ~4 yr on 216M THB, break-even ~0.3M records; adverse corner cannot cover depreciation. Five-press table kept and labelled. - fleet-calculator.html: start fleet 1 Duplex + 1 Classic, target 850k, capex base 6.55M (cases 8.9 / 6.55 / 4.9M), Duplex beyond one, chiller 500 kW, imported machinery 2.3M, ladder from the launch plant. - total-investment.md: superseded note updated.
This commit is contained in:
1 parent
7344f12dc8
commit
794cde228c
6 files changed
+156
-45
No files matched your search
+23
-9
@@ -9,20 +9,34 @@ page as real quotes and the site decision land.
|
||||
|
||||
| Phase | Fleet | Rough output |
|
||||
|---|---|---|
|
||||
| Launch | 1 semi-auto press (Newbilt Single, the first half of Duplex system 1), 1 shift | ~90,000 to 135,000 records/yr |
|
||||
| Duplex | 2 semi-auto presses (Duplex system 1: EX 50 main and EX 35 colour extruder), 1 to 2 shifts | ~175,000 to 540,000 records/yr |
|
||||
| Mature | 4 semi-auto (two Duplex systems, each EX 50 + EX 35) + 1 automated (Newbilt Classic), 2 shifts | ~1.0 to 1.5 million records/yr |
|
||||
| Expansion (option) | the mature fleet + up to 10 more Newbilt Classics, 2 shifts | ~4.7 to 5.8 million records/yr (estimate) |
|
||||
| Launch plant (decided October 2026) | 2 semi-auto (Duplex system 1: EX 50 main + EX 35 colour extruder) + 1 automated (Newbilt Classic), commissioned in sequence, 2 shifts at volume | ~0.71 to 0.97 million records/yr |
|
||||
| Growth option: second Duplex | 4 semi-auto (two Duplex systems) + 1 Classic, 2 shifts; room reserved, not in the investment | ~1.0 to 1.5 million records/yr |
|
||||
| Expansion (option) | the five-press fleet + up to 10 more Newbilt Classics, 2 shifts | ~4.7 to 5.8 million records/yr (estimate) |
|
||||
|
||||
The [press fleet calculator](fleet-calculator.html) sizes the fleet for
|
||||
any yearly output and specials share, with the people and utilities it
|
||||
needs; at the user's planning rates (3 records a minute per Duplex
|
||||
system, 2 per Classic, 65 % effectiveness, two shifts) the start fleet
|
||||
makes ~1.5 million records a year and a full Payap press hall (two Duplex
|
||||
systems and eleven Classics) ~5.2 million.
|
||||
system, 2 per Classic, 65 % effectiveness, two shifts) the launch plant
|
||||
makes ~0.94 million records a year, the five-press fleet ~1.5 million and
|
||||
a full Payap press hall (two Duplex systems and eleven Classics) ~5.2
|
||||
million.
|
||||
|
||||
Basis: the current fleet plan of October 2026
|
||||
([pressing line](equipment/pressing-line.md)). The automated Classic
|
||||
**Launch plant (October 2026).** The plant launches with one Duplex
|
||||
system and one Classic, with cutting and galvanics in-house
|
||||
([total investment](finance/total-investment.md#launch-plant-october-2026)).
|
||||
Its utilities: steam 450 to 540 kg/h on boiler modules B-1 and B-2, cooling
|
||||
~390 kW at the hot-afternoon peak on chillers CH-1 and CH-2 (2 × 250 kW),
|
||||
with the boiler hall, chiller compound and ring mains built for the
|
||||
larger fleet as in [utility phasing](#utility-phasing-backbone-once-modules-with-the-presses).
|
||||
The building, electrical and steam sections below still size the
|
||||
five-press fleet that the backbone is built for.
|
||||
|
||||
Basis: the fleet plan of October 2026
|
||||
([pressing line](equipment/pressing-line.md)). Launch plant: two
|
||||
semi-automatic presses at 60 to 80 records/hour each plus the Classic at
|
||||
~128/hour, 248 to 288 records/hour, with 60 to 70 % effectiveness ~149 to
|
||||
202 an hour, 0.71 to 0.97 million a year on the same 16 h and 300 days.
|
||||
Five-press fleet: The automated Classic
|
||||
~128 records/hour (28 s cycle, vendor flyer); semi-automatic throughput is
|
||||
unpublished, assumed 60 to 80 records/hour per press with operator
|
||||
handling (estimate); 16 h/day, 300 days/yr, with realistic overall
|
||||
|
||||