Re-base scale, pressing line, roadmap, revenue model and calculator on the launch plant
Deploy test site / deploy (push) Successful in 48s
Deploy test site / deploy (push) Successful in 48s
Launch plant (user, October 2026): one Duplex system and one Classic, with cutting and galvanics in-house, everything in one capital round. - scale.md: capacity table now launch plant 0.71-0.97M records/yr, the second Duplex as a growth option; launch utilities (450-540 kg/h on B-1/B-2, ~390 kW on 2 x 250 kW); calculator figure ~0.94M. - pressing-line.md: launch plant section on top; five-press fleet kept as the layout fleet the hall and backbone are built for. - roadmap.md: long-lead orders for the launch plant, no bridge stampers or outsourced cutting, commissioning order, what stays revenue-gated. - revenue-model.md: operating picture of the launch plant: central revenue ~3.75M USD, EBITDA ~1.6M, operating profit ~1.1M, payback ~4 yr on 216M THB, break-even ~0.3M records; adverse corner cannot cover depreciation. Five-press table kept and labelled. - fleet-calculator.html: start fleet 1 Duplex + 1 Classic, target 850k, capex base 6.55M (cases 8.9 / 6.55 / 4.9M), Duplex beyond one, chiller 500 kW, imported machinery 2.3M, ladder from the launch plant. - total-investment.md: superseded note updated.
This commit is contained in:
1 parent
7344f12dc8
commit
794cde228c
6 files changed
+156
-45
No files matched your search
@@ -129,8 +129,10 @@ target with the levers above, and 180M as the low-quote case.
|
||||
## Full vision, all blocks (July 2026, superseded)
|
||||
|
||||
The five-press full vision below is superseded by the launch plant above.
|
||||
It stays until the documents that quote its 4.7M to 8.9M USD total (README,
|
||||
roadmap, revenue model, business plan) are re-based on the launch plant.
|
||||
Scale, pressing line, roadmap, revenue model (which now has a launch-plant
|
||||
operating picture) and the fleet calculator are re-based on the launch
|
||||
plant; the business plan is next. It stays for the record of how the
|
||||
blocks were built.
|
||||
|
||||
| Block | USD | THB | Basis |
|
||||
|---|---|---|---|
|
||||
|
||||
Reference in new issue
Block a user