Chinese suppliers for boilers, compressed air and hydraulics

Checked October 2026 on the investor's budget question. New
docs/suppliers/china-utilities.md: boiler makers (ZOZEN, Sitong,
Fangkuai, Taiguo, Yuanda, Yongxing, Taishan, Nobeth) with fit for 500
kg/h at 1.25 MPa, claimed certificates, Thai references and listing
prices; the Thai rules for an imported boiler (MR and MOI notification
B.E. 2549: ASME/JIS/EN or equivalent, certification-body verification,
once-through relief does not reach 10.5 bar, licensed controller, annual
inspection); compressor makers with Thai offices (Kaishan, Denair) and
sizing; hydraulic pump sets and accumulators (Huade, Yuci, Hengli, WMD,
Renowell, Inovance, NXQ makers), the shared-ring-main risks and Thai HPU
builders; duty and freight; open RFQs.

Result: about 2M THB at the midpoint (~2.5M with contingency), ~1 % of
the 216M target, mostly the boilers; Newbilt aggregates stay Newbilt's.
total-investment notes it and lists the uncosted central hydraulic
plant; utilities CSV gets the Chinese candidates and route estimates;
backlinks from equipment-suppliers, pressing-line, README.
This commit is contained in:
grabowski committed 2026-10-16 15:21:38 +07:00
1 parent 553b4a93d1
commit 7344f12dc8
6 files changed
+279 -7

No files matched your search

+8 -1
View File
@@ -75,6 +75,8 @@ steps are open planning items.
~161M to 292M THB (midpoint ~227M), so 216M is a realistic target with
four levers and 180M a low-quote case
([total investment](docs/finance/total-investment.md#launch-plant-october-2026)).
Chinese boilers, compressor and hydraulics save about 2M THB of that
([Chinese suppliers](docs/suppliers/china-utilities.md)).
The business plan is being re-based on it.
## Planning Documents
@@ -108,6 +110,10 @@ The detail lives in dedicated documents:
(Pheenix Alpha, the comparison for the Classic)
- [Equipment needs and supplier map](docs/suppliers/equipment-suppliers.md):
the full needs list per production step with supplier tables and contacts
- [Chinese suppliers](docs/suppliers/china-utilities.md): boilers,
compressed air and hydraulics from China (makers, published prices,
Thai offices, Thai boiler rules for imports); saves about 2M THB, ~1 %
of the budget
- [Sustainability](docs/sustainability.md): the solar installation (Deye
inverters, 271 kWh Gobel Power battery stack), the PEA grid tariff and
what it decides (biomass steam at a quarter to a tenth of the cost of
@@ -299,7 +305,8 @@ docs/
│ construction RFQ, PEA electricity tariff
│ schedule (pea/), biomass fuel market
│ reports (biomass/)
├── suppliers/ Supplier contacts, vendor landscape, supplier map
├── suppliers/ Supplier contacts, vendor landscape, supplier map,
│ Chinese utility suppliers (china-utilities.md)
├── artist-order.html Artist ordering and fan-funding demo page
├── artist-platform.md Upload, price calculator, fan-funded pressing
├── biomass.md Biomass fuel strategy and the 60 rai coppice idea