Chinese suppliers for boilers, compressed air and hydraulics
Checked October 2026 on the investor's budget question. New docs/suppliers/china-utilities.md: boiler makers (ZOZEN, Sitong, Fangkuai, Taiguo, Yuanda, Yongxing, Taishan, Nobeth) with fit for 500 kg/h at 1.25 MPa, claimed certificates, Thai references and listing prices; the Thai rules for an imported boiler (MR and MOI notification B.E. 2549: ASME/JIS/EN or equivalent, certification-body verification, once-through relief does not reach 10.5 bar, licensed controller, annual inspection); compressor makers with Thai offices (Kaishan, Denair) and sizing; hydraulic pump sets and accumulators (Huade, Yuci, Hengli, WMD, Renowell, Inovance, NXQ makers), the shared-ring-main risks and Thai HPU builders; duty and freight; open RFQs. Result: about 2M THB at the midpoint (~2.5M with contingency), ~1 % of the 216M target, mostly the boilers; Newbilt aggregates stay Newbilt's. total-investment notes it and lists the uncosted central hydraulic plant; utilities CSV gets the Chinese candidates and route estimates; backlinks from equipment-suppliers, pressing-line, README.
This commit is contained in:
1 parent
553b4a93d1
commit
7344f12dc8
6 files changed
+279
-7
No files matched your search
@@ -75,6 +75,8 @@ steps are open planning items.
|
||||
~161M to 292M THB (midpoint ~227M), so 216M is a realistic target with
|
||||
four levers and 180M a low-quote case
|
||||
([total investment](docs/finance/total-investment.md#launch-plant-october-2026)).
|
||||
Chinese boilers, compressor and hydraulics save about 2M THB of that
|
||||
([Chinese suppliers](docs/suppliers/china-utilities.md)).
|
||||
The business plan is being re-based on it.
|
||||
|
||||
## Planning Documents
|
||||
@@ -108,6 +110,10 @@ The detail lives in dedicated documents:
|
||||
(Pheenix Alpha, the comparison for the Classic)
|
||||
- [Equipment needs and supplier map](docs/suppliers/equipment-suppliers.md):
|
||||
the full needs list per production step with supplier tables and contacts
|
||||
- [Chinese suppliers](docs/suppliers/china-utilities.md): boilers,
|
||||
compressed air and hydraulics from China (makers, published prices,
|
||||
Thai offices, Thai boiler rules for imports); saves about 2M THB, ~1 %
|
||||
of the budget
|
||||
- [Sustainability](docs/sustainability.md): the solar installation (Deye
|
||||
inverters, 271 kWh Gobel Power battery stack), the PEA grid tariff and
|
||||
what it decides (biomass steam at a quarter to a tenth of the cost of
|
||||
@@ -299,7 +305,8 @@ docs/
|
||||
│ construction RFQ, PEA electricity tariff
|
||||
│ schedule (pea/), biomass fuel market
|
||||
│ reports (biomass/)
|
||||
├── suppliers/ Supplier contacts, vendor landscape, supplier map
|
||||
├── suppliers/ Supplier contacts, vendor landscape, supplier map,
|
||||
│ Chinese utility suppliers (china-utilities.md)
|
||||
├── artist-order.html Artist ordering and fan-funding demo page
|
||||
├── artist-platform.md Upload, price calculator, fan-funded pressing
|
||||
├── biomass.md Biomass fuel strategy and the 60 rai coppice idea
|
||||
|
||||
Reference in new issue