Add factory layout concept diagram and fix fire-suppression section structure
- docs/facility-layout.drawio: zoned floor concept (production, galvanics, utilities, logistics, support) with material and stamper flow arrows - PNG and PDF exports alongside the source - facility-security.md: suppression subsection no longer splits the fire safety bullet list; clean agent wording updated to FK-5-1-12
This commit is contained in:
1 parent
0b79c4fb73
commit
6c1b1e7bbd
4 files changed
+189
-3
No files matched your search
@@ -67,15 +67,46 @@ option per room.
|
||||
- **Fire detection and alarm** throughout; suppression matched to each zone
|
||||
(hot PVC and hydraulic oil in pressing, chemistry in galvanics, paper and
|
||||
cartons in packaging/finished goods, and the boiler room).
|
||||
|
||||
- **Boiler room safety**: the steam generator (10 bar, 180 °C) needs its own
|
||||
room, safety valves and interlocks, and inspection per Thai boiler
|
||||
regulations (Department of Industrial Works requirements, licensed boiler
|
||||
operator).
|
||||
room, safety valves, fuel shutoff interlocks, and inspection per Thai
|
||||
boiler regulations (Department of Industrial Works requirements, licensed
|
||||
boiler operator).
|
||||
- **Emergency equipment in galvanics**: eyewash stations and emergency
|
||||
shower at the plating line, spill kits, and neutralizing agents.
|
||||
- **Emergency lighting, marked exits, assembly point**, and first-aid
|
||||
coverage on every shift.
|
||||
|
||||
### Suppression design position: zoned, not full-building gas
|
||||
|
||||
A full-building gas suppression system is ruled out: gas agents only work in
|
||||
sealed volumes that can hold concentration, which a ventilated production
|
||||
hall with people and loading doors cannot, and CO2 flooding is lethal in
|
||||
occupied spaces. The design position is zoned suppression:
|
||||
|
||||
- **Clean agent gas** (FK-5-1-12, sold as Novec 1230, or inert gas such as
|
||||
IG-541) only in small, sealed, high-value rooms: the server/IT room,
|
||||
electrical switchrooms, PLC/control cabinets (in-cabinet micro systems),
|
||||
and above all the master/stamper archive, where sprinkler water would
|
||||
destroy lacquers and paper records and corrode the metal parts even in a
|
||||
minor event.
|
||||
- **Water** (sprinklers, or water mist where equipment matters) for the
|
||||
large spaces: production, warehouse, and packaging/finished goods, where
|
||||
paper cartons are the largest fire load in the building. The press hall's
|
||||
specific risk is a hydraulic oil spray fire (200 L at 180 bar); water
|
||||
mist handles oil fires well and is gentler on machines than deluge.
|
||||
- **Battery stack (BESS)**: gas does not stop lithium thermal runaway. Per
|
||||
NFPA 855 practice the stack needs off-gas and early-smoke detection,
|
||||
electrical isolation on alarm, physical separation from production
|
||||
(ideally its own enclosure), and deflagration venting. Detection and
|
||||
containment over suppression.
|
||||
- **Galvanics**: low fire load (aqueous baths); local clean-agent
|
||||
protection for rectifier cabinets is sufficient.
|
||||
|
||||
The property insurer will drive much of the final specification, so involve
|
||||
them before the design is fixed. The archive gas system and the BESS
|
||||
detection affect room layout and belong in the site design brief early.
|
||||
|
||||
## Plant systems and monitoring
|
||||
|
||||
- **Utility monitoring and interlocks**: fume-extraction interlocks on the
|
||||
|
||||
Reference in new issue