Launch plant roll-up and the investor's 180M THB question
Decided (user, October 2026): the plant launches with everything in one capital round, commissioned in sequence: one Newbilt Duplex system, one Classic, a Pheenix galvanics line with ZLD water, the Sibert line, a Sillitoe cutting room, and the modular steam and cooling plant (2 x 500 kg/h boilers, 2 x 250 kW chillers, rooms for four each). No bridge stampers, no outsourced cutting; cassette and CD-R stay; the second Duplex and further Classics are growth options, not in the investment. total-investment.md: new 'Launch plant' roll-up, 4.9M to 8.9M USD, 161M to 292M THB incl. 15 % contingency (midpoint ~227M), with what is left out (ramp-up reserve ~10-20M THB, CD replication, financing, FX, archive shelving) and the BOI assumption. The investor's question (180M THB, maybe +20 % = 216M): fits at the low end only; at the midpoint four levers that keep every machine (solar via PPA, metrology launch tier, galvanics near OMS's reference, visitor corridor later) give ~193M, plus reserve ~203-213M, inside 216M; 180M needs low quotes. The quotes that decide it: Newbilt (Duplex, Classic), Pheenix galvanics, building with soil test, metrology. Old full vision and phased entry marked superseded until the mirrors are re-based. Utilities CSV: chiller bank two modules (4.9-7.9M THB), boiler note for B-1 and B-2 at launch, ZLD and DI rows now launch scope (carried with galvanics); baseline 28.47M-48.73M THB. README project status.
This commit is contained in:
1 parent
07ef9c0b9a
commit
553b4a93d1
3 files changed
+125
-10
No files matched your search
@@ -67,6 +67,15 @@ steps are open planning items.
|
||||
investor (October 2026). Post-show follow-ups with Pheenix, Sibert, OMS
|
||||
and SST are in the
|
||||
[exhibitor briefing](docs/suppliers/making-vinyl-europe-2026-exhibitors.md#after-the-show).
|
||||
- The plant now launches with everything in one capital round (October
|
||||
2026): one Newbilt Duplex system and one Classic, a Pheenix galvanics
|
||||
line, the Sibert stamper-prep line, a Sillitoe cutting room and the
|
||||
modular boiler and chiller plant. The investor asked whether it can be
|
||||
built for 180M THB, possibly 20 % more: on current estimates it costs
|
||||
~161M to 292M THB (midpoint ~227M), so 216M is a realistic target with
|
||||
four levers and 180M a low-quote case
|
||||
([total investment](docs/finance/total-investment.md#launch-plant-october-2026)).
|
||||
The business plan is being re-based on it.
|
||||
|
||||