Archive room: mobile shelving for the father and mother archive
Deploy test site / deploy (push) Successful in 43s

Planned (October 2026, user): the archive in the office gets mobile
archive shelving, A-Z Solutions (Vienna) as the reference
(a-z-solutions.eu, checked October 2026: hand wheel or electric drive,
lockable, rails need early floor planning; no published prices).

facility-security.md, new section under Protecting the irreplaceable:
what it holds (fathers and mothers, ~1,200 to 2,400 parts a year; a
reference pressing per title only as a proposal), sizing estimates (about
0.2 kg per part, ~3 mm and ~75 kg per shelf metre; in the Payap office's
~4 x 5.75 m room two fixed runs, four double carriages and one aisle hold
~150 shelf metres, ~50,000 parts, 20+ years), what it asks of the
building (ground slab at full rating, ~11 kN/m2 under the block; rails in
the screed fixed before the floor finish; geared hand wheel; gas,
climate, leak sensor, access control; barcoded box addresses), open
points (quotes from A-Z and a Thai supplier, storage format from the
galvanics vendors, fathers in a second compartment or off site).

Mirrors: site-candidates.md (office ground floor), phase 1 RFQ (archive
keeps the full slab rating if the slab is zoned), digital-factory.md
(archive location as box and shelf position, sets per mother),
equipment-suppliers.md (section 8 entry), total-investment.md added scope
(to quote, not in the sum).
This commit is contained in:
grabowski committed 2026-10-16 11:18:09 +07:00
1 parent 475623e9f2
commit 4f02d9a7a9
6 files changed
+93 -3

No files matched your search

+5 -1
View File
@@ -31,7 +31,11 @@ stepping up from a light-duty slab adds only on the order of 100–200 THB/m².
The real cost variable is the ground underneath (see soil, below). A later
value-engineering option is to zone the slab — 30 kN/m² under press hall and
warehouse only, lighter under offices, but for rough pricing the whole
floor is specified at 30 so the number is conservative.
floor is specified at 30 so the number is conservative. If it is zoned,
the archive room keeps the full rating: it gets mobile shelving loaded
with nickel parts, about 11 kN/m² under the shelving when full (estimate), and
its rails go into the floor screed at fit-out
([facility security](../facility-security.md#archive-room-mobile-shelving)).
### 1a. Panel core: where PIR is not enough
+1
View File
@@ -50,6 +50,7 @@ building, software and stamper prep lines, and the contingency on top).
| Press fleet changed (October 2026) to two Newbilt Duplex systems (two presses each, EX 50 main extruder and EX 35 colour extruder) plus one Newbilt Classic, replacing the two blocks above (930k – 1,290k): Duplex system 1 as the first block (350k – 370k; the quote's second-extruder option becomes the EX 35), system 2 ~230k – 300k (two presses at the quoted ~115k per press and extruder set as the yardstick, plus hydraulic unit and EX 35, estimate; no EX 35 price on file), the Classic ~290k – 460k (the AD12 band per press as a placeholder; no Newbilt price on file) | −60k (low case) / −160k (high case) | −2.0M / −5.3M | estimate, [pressing line](../equipment/pressing-line.md); the Newbilt re-quote replaces it. The utilities for five presses are re-sized in the row below |
| Utilities re-sized for the five-press fleet (October 2026): boiler bank 2 × 500 kg/h, chiller bank 3 × 250 kW with plate heat exchanger and tanks, larger softener and loop treatment ([steam and cooling](../steam-cooling.html)) | +185k (low case) / +294k (high case) | +6.1M / +9.7M | estimate, [utilities CSV](utilities-investment.csv) re-based from 24.0M – 41.6M to 30.1M – 51.3M THB |
| Utility yard built for four boiler and four chiller modules (October 2026): yard ~379 m² against 178 m² ([scale](../scale.md#detached-utility-yard-parking-and-what-that-moves)) | 73k – 122k | 2.4M – 4.0M | estimate: the building rate above on the ~200 m² the yard grows by; the open chiller compound costs less than a building, so this is the cautious end. The valved branches and feeders for the empty positions are not priced yet |
| Archive mobile shelving for the father and mother archive (October 2026) | to quote | to quote | not in the sum: A-Z Solutions publishes no prices; quote it and a Thai supplier ([facility security](../facility-security.md#archive-room-mobile-shelving)) |
| **Added so far** | **~678k – 1,027k** | **~22.3M – 33.9M** | about 13 to 17% on the full-vision subtotal |
## Phased entry