Press hall: five Duplex bays and four Classic positions (balanced at 60 % specials)
Deploy test site / deploy (push) Successful in 44s
Deploy test site / deploy (push) Successful in 44s
User (October 2026): "change the hall layout" after the finding that the 60/40 floor split leaves the Classics about half loaded at 60 %+ specials (specials run only on the Duplex systems). - Press hall now keeps five Duplex bays (four along the visitor corridor, the fifth at the head of the second row) and four Classic positions: 550 + 200 = ~750 m2 of ~870 m2, ~73/27 by floor, 10 to 4 by presses; launch plant fills one of each, growth adds Duplex first. - Full hall: ~2.9 to 4.4M records a year at 60 % specials, Classics ~80 to 100 % loaded (60/40 gave ~2.3 to 3.6M); ~3.2 to 4.4M at ~20 %; fourteen presses as before: ~2.1 to 2.5 t/h steam, up to ~1.8 MW cooling, a utility phase of its own. - pressing-line.md, scale.md, site-candidates.md, crane-workshop-tours.md, roadmap.md, README (FreeCAD model still the earlier layout, not redrawn); calculator preset "Full hall (5 D + 4 C)" and ladder; plant view reserves 5 Duplex bays and 4 Classic positions; business plan draft 0.2 rebuilt. Checks: renderer 720 checks and functional checks pass, calculator regression 0 fails, level checks clean; PDF 47 pages, TOC filled.
This commit is contained in:
1 parent
b3e8e4272b
commit
3f1e4452b8
11 files changed
+69
-66
No files matched your search
@@ -150,8 +150,8 @@ The detail lives in dedicated documents:
|
|||||||
[isometric](docs/cnx_vinyl_parametric_payap-iso.png)) of the whole plant
|
[isometric](docs/cnx_vinyl_parametric_payap-iso.png)) of the whole plant
|
||||||
on a square placeholder plot of Payap land: a 128 x 25 m production-only
|
on a square placeholder plot of Payap land: a 128 x 25 m production-only
|
||||||
factory with the five-press fleet, room for ten more Classics (drawn
|
factory with the five-press fleet, room for ten more Classics (drawn
|
||||||
before the October 2026 decision to lay the hall out 60/40 for Duplex
|
before the October 2026 decision to lay the hall out for Duplex
|
||||||
systems: four Duplex bays and six Classic positions), one
|
systems: five Duplex bays and four Classic positions), one
|
||||||
shared hydraulic and air plant, a colour store with outdoor silos and a
|
shared hydraulic and air plant, a colour store with outdoor silos and a
|
||||||
two-storey finishing and print block
|
two-storey finishing and print block
|
||||||
([plans](docs/cnx_vinyl_parametric_payap-block.png)), a separate
|
([plans](docs/cnx_vinyl_parametric_payap-block.png)), a separate
|
||||||
|
|||||||
Binary file not shown.
Binary file not shown.
@@ -551,9 +551,9 @@ def blocks():
|
|||||||
"~0.58 to 0.90 million records at 60 % specials (0.71 to 0.97 at ~20 %)"],
|
"~0.58 to 0.90 million records at 60 % specials (0.71 to 0.97 at ~20 %)"],
|
||||||
["Growth option: second Duplex", "4 semi-automatic + 1 Classic, 2 shifts; room reserved, not in "
|
["Growth option: second Duplex", "4 semi-automatic + 1 Classic, 2 shifts; room reserved, not in "
|
||||||
"the investment", "~1.0 to 1.5 million records"],
|
"the investment", "~1.0 to 1.5 million records"],
|
||||||
["Full hall (option)", "4 Duplex systems + 6 Classics, the press hall laid out 60/40 for Duplex "
|
["Full hall (option)", "5 Duplex systems + 4 Classics, the press hall laid out for Duplex "
|
||||||
"(special pressings first); a utility phase of its own", "~2.3 to 3.6 million records at 60 % "
|
"(special pressings first, ~73/27 by floor); a utility phase of its own",
|
||||||
"specials (estimate)"],
|
"~2.9 to 4.4 million records at 60 % specials (estimate)"],
|
||||||
], widths_mm=[40, 80, 50],
|
], widths_mm=[40, 80, 50],
|
||||||
caption="Basis: semi-automatic 60 to 80 records/h assumed; Classic ~128/h (vendor flyer); 16 h/day, "
|
caption="Basis: semi-automatic 60 to 80 records/h assumed; Classic ~128/h (vendor flyer); 16 h/day, "
|
||||||
"300 days/yr, 60 to 70% overall equipment effectiveness; specials (60 % and more) only on the Duplex. "
|
"300 days/yr, 60 to 70% overall equipment effectiveness; specials (60 % and more) only on the Duplex. "
|
||||||
|
|||||||
@@ -628,8 +628,8 @@ def blocks():
|
|||||||
"It is where finished goods move to free production floor, where pressing capacity can double, "
|
"It is where finished goods move to free production floor, where pressing capacity can double, "
|
||||||
"or where a CD replication line would go if that option is chosen (section 4.9). Where the "
|
"or where a CD replication line would go if that option is chosen (section 4.9). Where the "
|
||||||
"second Duplex system stands on the Mueang Chi footprint is not drawn yet; the Payap scenario "
|
"second Duplex system stands on the Mueang Chi footprint is not drawn yet; the Payap scenario "
|
||||||
"model draws the five-press fleet; its press hall is now planned 60/40 for Duplex systems (four "
|
"model draws the five-press fleet; its press hall is now planned for Duplex systems (five Duplex "
|
||||||
"Duplex bays and six Classic positions), because the plant focuses on special pressings."),
|
"bays and four Classic positions), because the plant focuses on special pressings."),
|
||||||
H3("What the construction RFQ asks"),
|
H3("What the construction RFQ asks"),
|
||||||
P("The budget-level construction RFQ, with quantities from the parametric model, asks contractors "
|
P("The budget-level construction RFQ, with quantities from the parametric model, asks contractors "
|
||||||
"for: the shell rate per m² at the insulated-panel specification (not a bare shed); heavy-duty "
|
"for: the shell rate per m² at the insulated-panel specification (not a bare shed); heavy-duty "
|
||||||
|
|||||||
@@ -321,7 +321,7 @@ into a separate office building, so only production sits under the
|
|||||||
crane. The tour then starts in the office building, at the cutting-room
|
crane. The tour then starts in the office building, at the cutting-room
|
||||||
window and the listening room, and crosses a covered link into a 98 m
|
window and the listening room, and crosses a covered link into a 98 m
|
||||||
corridor. That is longer than the 45 to 55 m assumed below, because the
|
corridor. That is longer than the 45 to 55 m assumed below, because the
|
||||||
press hall keeps room for four Duplex systems and six Classics and a
|
press hall keeps room for five Duplex systems and four Classics and a
|
||||||
colour store sits before it. In that model the crane runway ends at the press hall:
|
colour store sits before it. In that model the crane runway ends at the press hall:
|
||||||
finishing and packaging sit beyond it in a two-storey block with the
|
finishing and packaging sit beyond it in a two-storey block with the
|
||||||
print room and stocks upstairs, which the crane cannot serve, so loads
|
print room and stocks upstairs, which the crane cannot serve, so loads
|
||||||
|
|||||||
@@ -96,30 +96,29 @@ automated candidate). What it means:
|
|||||||
between machines. The EX 35 and trimmer footprints are not published,
|
between machines. The EX 35 and trimmer footprints are not published,
|
||||||
so those are estimates. The [Payap scenario model](../site-candidates.md#payap-scenario-model-october-2026) draws
|
so those are estimates. The [Payap scenario model](../site-candidates.md#payap-scenario-model-october-2026) draws
|
||||||
both systems this way.
|
both systems this way.
|
||||||
- **Room to grow: a hall laid out 60/40 for Duplex systems (October
|
- **Room to grow: a hall laid out for Duplex systems (October 2026).**
|
||||||
2026).** The plant will mainly press special editions (splatter, colour
|
The plant will mainly press special editions (splatter, marble, colour
|
||||||
effects, small runs), not mono colours, so the press hall keeps more
|
effects), not mono colours: the specials share is planned at 60 % and
|
||||||
floor for Duplex systems than for Classics: 60/40 by floor, four Duplex
|
more ([revenue model](../finance/revenue-model.md)), and specials run
|
||||||
bays (the launch system and three more) and six Classic positions (the
|
only on the Duplex systems. The press hall therefore keeps five Duplex
|
||||||
launch Classic and five more). At the calculator's floor figures (110 m²
|
bays (the launch system and four more) and four Classic positions (the
|
||||||
per Duplex bay, 50 m² per Classic) that is 440 + 300 = ~740 m² of the
|
launch Classic and three more). At the calculator's floor figures (110
|
||||||
~870 m² hall; the rest stays open for mould carts and staging. Growth
|
m² per Duplex bay, 50 m² per Classic) that is 550 + 200 = ~750 m² of the
|
||||||
adds Duplex systems first. The full hall is eight semi-automatic presses
|
~870 m² hall, ~73/27 by floor and 10 to 4 by presses; the rest stays
|
||||||
and six Classics, 57/43 by press count; by hourly output the six
|
open for mould carts and staging. Growth adds Duplex systems first.
|
||||||
automatic Classics still press more (~770 against 480 to 640 records an
|
This split balances the hall by output at 60 % specials: ten
|
||||||
hour, estimate). This is an option, not part of the plan or the
|
semi-automatic presses (600 to 800 records an hour, estimate) carry the
|
||||||
investment: the layout keeps the floor, and the central hydraulic and
|
specials and the four Classics (~512 an hour) the standard records. A
|
||||||
air plant should be sized or extendable for it. At Newbilt's per-press
|
60/40 floor split (four Duplex bays, six Classics), planned first the
|
||||||
figures, the fourteen presses would draw ~2.1 to 2.5 t/h of steam and up
|
same month, left the Classics about half loaded at that share. This is
|
||||||
to ~1.8 MW of cooling, so boiler, chiller and grid connection would be a
|
an option, not part of the plan or the investment: the layout keeps the
|
||||||
phase of their own ([scale](../scale.md)). The Payap scenario model in
|
floor, and the central hydraulic and air plant should be sized or
|
||||||
|
extendable for it. At Newbilt's per-press figures, the fourteen presses
|
||||||
|
would draw ~2.1 to 2.5 t/h of steam and up to ~1.8 MW of cooling, so
|
||||||
|
boiler, chiller and grid connection would be a phase of their own
|
||||||
|
([scale](../scale.md#production-capacity)). The Payap scenario model in
|
||||||
FreeCAD still draws the earlier layout (two Duplex bays and eleven
|
FreeCAD still draws the earlier layout (two Duplex bays and eleven
|
||||||
Classic positions). The specials share is planned at 60 % and more
|
Classic positions).
|
||||||
([revenue model](../finance/revenue-model.md)); specials run only on the
|
|
||||||
Duplex systems, so at that share the Duplex presses set the output of
|
|
||||||
the launch plant and of the full hall, and a hall balanced by output
|
|
||||||
would give them ~70 to 75 % of the floor (estimate,
|
|
||||||
[scale](../scale.md#production-capacity)).
|
|
||||||
- **Capacity** at maturity stays at ~1.0 to 1.5 million records a year on
|
- **Capacity** at maturity stays at ~1.0 to 1.5 million records a year on
|
||||||
two shifts, the range the [revenue model](../finance/revenue-model.md)
|
two shifts, the range the [revenue model](../finance/revenue-model.md)
|
||||||
uses: four semi-automatic presses at 60 to 80 records an hour (estimate)
|
uses: four semi-automatic presses at 60 to 80 records an hour (estimate)
|
||||||
@@ -148,7 +147,7 @@ automated candidate). What it means:
|
|||||||
flyer's Duplex main configuration runs two presses on one extruder); the
|
flyer's Duplex main configuration runs two presses on one extruder); the
|
||||||
Classic's price, weight, power, steam and cooling figures; and the
|
Classic's price, weight, power, steam and cooling figures; and the
|
||||||
central hydraulic supply (an option the flyer offers) for the whole
|
central hydraulic supply (an option the flyer offers) for the whole
|
||||||
fleet, extendable to the full hall (four Duplex systems, six Classics),
|
fleet, extendable to the full hall (five Duplex systems, four Classics),
|
||||||
including whether the Classic
|
including whether the Classic
|
||||||
can run from it, whether the presses hold their pressure from it over
|
can run from it, whether the presses hold their pressure from it over
|
||||||
the ring-main lengths of the hall, the filtration and isolation each
|
the ring-main lengths of the hall, the filtration and isolation each
|
||||||
|
|||||||
+11
-11
@@ -612,7 +612,7 @@ html[data-theme=light] .iso-svg .iso-glint { display: inline; }
|
|||||||
<button type="button" data-p="levers">Investor levers (216M)</button>
|
<button type="button" data-p="levers">Investor levers (216M)</button>
|
||||||
<button type="button" data-p="lean">Lean: bought stampers, outsourced cutting</button>
|
<button type="button" data-p="lean">Lean: bought stampers, outsourced cutting</button>
|
||||||
<button type="button" data-p="five">Five-press fleet (second Duplex)</button>
|
<button type="button" data-p="five">Five-press fleet (second Duplex)</button>
|
||||||
<button type="button" data-p="full">Full hall 60/40 (4 D + 6 C)</button>
|
<button type="button" data-p="full">Full hall (5 D + 4 C)</button>
|
||||||
</div>
|
</div>
|
||||||
</header>
|
</header>
|
||||||
|
|
||||||
@@ -814,8 +814,8 @@ html[data-theme=light] .iso-svg .iso-glint { display: inline; }
|
|||||||
<section class="card">
|
<section class="card">
|
||||||
<h2>From small to fully equipped</h2>
|
<h2>From small to fully equipped</h2>
|
||||||
<p class="note" style="margin-top:0">Fleets from the launch plant to a full Payap press hall (about 870 m²,
|
<p class="note" style="margin-top:0">Fleets from the launch plant to a full Payap press hall (about 870 m²,
|
||||||
laid out 60/40 by floor for Duplex systems because the plant focuses on special pressings: four
|
laid out for Duplex systems because the plant focuses on special pressings: five Duplex bays
|
||||||
Duplex bays and six Classic positions, ~740 m²), then the same floor filled Classic-led or with
|
and four Classic positions, ~750 m², balanced by output at 60 % specials), then the same floor filled Classic-led or with
|
||||||
Duplex systems only, for comparison, at the current settings and plant configuration. Click a row to load it.</p>
|
Duplex systems only, for comparison, at the current settings and plant configuration. Click a row to load it.</p>
|
||||||
<div class="tscroll"><table id="ladT"></table></div>
|
<div class="tscroll"><table id="ladT"></table></div>
|
||||||
</section>
|
</section>
|
||||||
@@ -1239,9 +1239,9 @@ html[data-theme=light] .iso-svg .iso-glint { display: inline; }
|
|||||||
function X(fx) { return FX + fx; }
|
function X(fx) { return FX + fx; }
|
||||||
function Y(fy) { return FY + fy; }
|
function Y(fy) { return FY + fy; }
|
||||||
// Press hall: 2 rows, 8 m deep. Slot lengths follow the calculator's floor
|
// Press hall: 2 rows, 8 m deep. Slot lengths follow the calculator's floor
|
||||||
// figures (110 m2 per Duplex bay, 50 m2 per Classic, 870 m2 hall). Laid out 60/40 by floor
|
// figures (110 m2 per Duplex bay, 50 m2 per Classic, 870 m2 hall). Laid out for Duplex
|
||||||
// for Duplex systems (special pressings first, October 2026): 4 Duplex bays + 6 Classic positions.
|
// systems (60 %+ specials, October 2026): 5 Duplex bays + 4 Classic positions, ~73/27 by floor.
|
||||||
var HALL_D = 4, HALL_C = 6;
|
var HALL_D = 5, HALL_C = 4;
|
||||||
var HALL = { cap: 870, aD: 110, aC: 50 };
|
var HALL = { cap: 870, aD: 110, aC: 50 };
|
||||||
var HROWS = [{ x: X(40), y0: Y(3.6), y1: Y(11.6), len: 52 }, { x: X(47.8), y0: Y(12.4), y1: Y(20.4), len: 44.2 }];
|
var HROWS = [{ x: X(40), y0: Y(3.6), y1: Y(11.6), len: 52 }, { x: X(47.8), y0: Y(12.4), y1: Y(20.4), len: 44.2 }];
|
||||||
var LTOT = 52 + 44.2, WD = HALL.aD / HALL.cap * LTOT, WC = HALL.aC / HALL.cap * LTOT;
|
var LTOT = 52 + 44.2, WD = HALL.aD / HALL.cap * LTOT, WC = HALL.aC / HALL.cap * LTOT;
|
||||||
@@ -1565,7 +1565,7 @@ html[data-theme=light] .iso-svg .iso-glint { display: inline; }
|
|||||||
sc.inf("factory", "Factory, 128 x 25 m",
|
sc.inf("factory", "Factory, 128 x 25 m",
|
||||||
"Production floor only (Payap scenario model): workshop, galvanics, stamper prep, PVC lab, colour store, press hall, finishing block; warehouse and dispatch behind the fire wall. Monopitch roof, low eave 7.0 m, high side 11.4 m.");
|
"Production floor only (Payap scenario model): workshop, galvanics, stamper prep, PVC lab, colour store, press hall, finishing block; warehouse and dispatch behind the fire wall. Monopitch roof, low eave 7.0 m, high side 11.4 m.");
|
||||||
sc.inf("presshall", "Press hall, ~870 m2",
|
sc.inf("presshall", "Press hall, ~870 m2",
|
||||||
al.Dh + " Duplex system" + (al.Dh === 1 ? "" : "s") + " and " + al.Ch + " Classic" + (al.Ch === 1 ? "" : "s") + " in the hall; laid out 60/40 by floor for special pressings: 4 Duplex bays and 6 Classic positions, ~740 m2 (pressing-line.md)" +
|
al.Dh + " Duplex system" + (al.Dh === 1 ? "" : "s") + " and " + al.Ch + " Classic" + (al.Ch === 1 ? "" : "s") + " in the hall; laid out for special pressings: 5 Duplex bays and 4 Classic positions, ~750 m2, balanced by output at 60 % specials (pressing-line.md)" +
|
||||||
(al.p2need ? "; " + (al.ovD + al.ovC) + " more in the phase 2 building" : ""));
|
(al.p2need ? "; " + (al.ovD + al.ovC) + " more in the phase 2 building" : ""));
|
||||||
sc.inf("galvanics", cfg.galvanics ? "Galvanics clean room (Pheenix Alpha line)" : "Galvanics room: stampers bought in",
|
sc.inf("galvanics", cfg.galvanics ? "Galvanics clean room (Pheenix Alpha line)" : "Galvanics room: stampers bought in",
|
||||||
cfg.galvanics ? "PASU, PPPU, PDPU, PMPB; one PDPU covers full-capacity demand, a second is redundancy (galvanics.md). Room-in-room under the crane, open to stamper prep." :
|
cfg.galvanics ? "PASU, PPPU, PDPU, PMPB; one PDPU covers full-capacity demand, a second is redundancy (galvanics.md). Room-in-room under the crane, open to stamper prep." :
|
||||||
@@ -1683,7 +1683,7 @@ html[data-theme=light] .iso-svg .iso-glint { display: inline; }
|
|||||||
fl.flat(pts, z + 0.015, "iso-slot iso-empty", id);
|
fl.flat(pts, z + 0.015, "iso-slot iso-empty", id);
|
||||||
sc.inf(id, sl.t === "D" ? "Duplex bay (room reserved)" : "Classic position (reserved)",
|
sc.inf(id, sl.t === "D" ? "Duplex bay (room reserved)" : "Classic position (reserved)",
|
||||||
sl.t === "D" ? "Growth option: room, utility modules and ring-main tees reserved, not in the investment (pressing-line.md)" :
|
sl.t === "D" ? "Growth option: room, utility modules and ring-main tees reserved, not in the investment (pressing-line.md)" :
|
||||||
"Classic position kept for growth (option, not in the investment); the hall is laid out 60/40 for Duplex systems (pressing-line.md)");
|
"Classic position kept for growth (option, not in the investment); the hall is laid out mainly for Duplex systems (pressing-line.md)");
|
||||||
} else fl.flat(pts, z + 0.015, "iso-slot", sl.t === "D" ? "duplex-" + sl.n : "classic-" + sl.n);
|
} else fl.flat(pts, z + 0.015, "iso-slot", sl.t === "D" ? "duplex-" + sl.n : "classic-" + sl.n);
|
||||||
if (!sl.e && sl.t === "D") {
|
if (!sl.e && sl.t === "D") {
|
||||||
var cx = (sl.x0 + sl.x1) / 2, cy = (sl.y0 + sl.y1) / 2;
|
var cx = (sl.x0 + sl.x1) / 2, cy = (sl.y0 + sl.y1) / 2;
|
||||||
@@ -3080,9 +3080,9 @@ function caseNow() {
|
|||||||
return "";
|
return "";
|
||||||
}
|
}
|
||||||
const LADDER = [
|
const LADDER = [
|
||||||
// Duplex systems first: the hall is laid out 60/40 by floor for them (special pressings, October 2026)
|
// Duplex systems first: the hall is laid out for 5 Duplex + 4 Classics (60 %+ specials, October 2026)
|
||||||
["Launch plant", 1, 1], ["Second Duplex", 2, 1], ["Step 1", 3, 2], ["Step 2", 4, 3],
|
["Launch plant", 1, 1], ["Second Duplex", 2, 1], ["Step 1", 3, 2], ["Step 2", 4, 3],
|
||||||
["Full hall 60/40", 4, 6], ["Same floor, Classic-led", 2, 11], ["Same floor, Duplex only", 7, 0],
|
["Full hall", 5, 4], ["Same floor, Classic-led", 2, 11], ["Same floor, Duplex only", 7, 0],
|
||||||
];
|
];
|
||||||
// presets: fleet plus plant configuration; prices, case and assumptions stay as they are
|
// presets: fleet plus plant configuration; prices, case and assumptions stay as they are
|
||||||
const CFG0 = Object.fromEntries(CFGK.map(k => [k, S0[k]]));
|
const CFG0 = Object.fromEntries(CFGK.map(k => [k, S0[k]]));
|
||||||
@@ -3092,7 +3092,7 @@ const PRESETS = {
|
|||||||
levers: { ...LAUNCH, solar: "ppa", metro: "launch", galvPrice: "oms", corridor: "later" },
|
levers: { ...LAUNCH, solar: "ppa", metro: "launch", galvPrice: "oms", corridor: "later" },
|
||||||
lean: { ...LAUNCH, galv: "bought", cut: "out" },
|
lean: { ...LAUNCH, galv: "bought", cut: "out" },
|
||||||
five: { mode: "fleet", dFleet: 2, cFleet: 1, ...CFG0 },
|
five: { mode: "fleet", dFleet: 2, cFleet: 1, ...CFG0 },
|
||||||
full: { mode: "fleet", dFleet: 4, cFleet: 6, ...CFG0 },
|
full: { mode: "fleet", dFleet: 5, cFleet: 4, ...CFG0 },
|
||||||
};
|
};
|
||||||
|
|
||||||
let S = { ...S0 }, A = { ...A0 };
|
let S = { ...S0 }, A = { ...A0 };
|
||||||
|
|||||||
+2
-2
@@ -173,5 +173,5 @@ Since October 2026 the plant launches with everything in one capital
|
|||||||
round (~161M to 292M THB, target ~216M with the levers in
|
round (~161M to 292M THB, target ~216M with the levers in
|
||||||
[total investment](finance/total-investment.md#launch-plant-october-2026));
|
[total investment](finance/total-investment.md#launch-plant-october-2026));
|
||||||
the gates still come before the round is spent, and the growth options
|
the gates still come before the round is spent, and the growth options
|
||||||
(more Duplex systems first, then Classics, in a press hall laid out 60/40
|
(more Duplex systems first, then Classics, in a press hall laid out for
|
||||||
for Duplex) are funded from revenue.
|
five Duplex systems and four Classics) are funded from revenue.
|
||||||
+16
-13
@@ -11,7 +11,7 @@ page as real quotes and the site decision land.
|
|||||||
|---|---|---|
|
|---|---|---|
|
||||||
| Launch plant (decided October 2026) | 2 semi-auto (Duplex system 1: EX 50 main + EX 35 colour extruder) + 1 automated (Newbilt Classic), commissioned in sequence, 2 shifts at volume | ~0.58 to 0.90 million records/yr at the planned 60 % specials (Duplex-limited); ~0.71 to 0.97 million at ~20 % |
|
| Launch plant (decided October 2026) | 2 semi-auto (Duplex system 1: EX 50 main + EX 35 colour extruder) + 1 automated (Newbilt Classic), commissioned in sequence, 2 shifts at volume | ~0.58 to 0.90 million records/yr at the planned 60 % specials (Duplex-limited); ~0.71 to 0.97 million at ~20 % |
|
||||||
| Growth option: second Duplex | 4 semi-auto (two Duplex systems) + 1 Classic, 2 shifts; room reserved, not in the investment | ~1.0 to 1.5 million records/yr |
|
| Growth option: second Duplex | 4 semi-auto (two Duplex systems) + 1 Classic, 2 shifts; room reserved, not in the investment | ~1.0 to 1.5 million records/yr |
|
||||||
| Full hall (option) | 4 Duplex systems + 6 Classics, the hall laid out 60/40 for Duplex, 2 shifts | ~2.3 to 3.6 million records/yr at 60 % specials, ~3.6 to 4.7 million at ~20 % (estimate) |
|
| Full hall (option) | 5 Duplex systems + 4 Classics, the hall laid out for Duplex (~73/27 by floor), 2 shifts | ~2.9 to 4.4 million records/yr at 60 % specials, ~3.2 to 4.4 million at ~20 % (estimate) |
|
||||||
|
|
||||||
The [press fleet calculator](fleet-calculator.html) sizes the fleet for
|
The [press fleet calculator](fleet-calculator.html) sizes the fleet for
|
||||||
any yearly output and specials share, with the people and utilities it
|
any yearly output and specials share, with the people and utilities it
|
||||||
@@ -45,24 +45,27 @@ million a year. The theoretical ceiling of the mature fleet at 100% uptime
|
|||||||
is roughly 1.8 to 2.2 million records per year. (The earlier 50/50 fleet,
|
is roughly 1.8 to 2.2 million records per year. (The earlier 50/50 fleet,
|
||||||
two semi-automatic presses and two Pheenix AD12s, landed in the same
|
two semi-automatic presses and two Pheenix AD12s, landed in the same
|
||||||
range.) The full-hall row is an option the plant keeps room for, not a
|
range.) The full-hall row is an option the plant keeps room for, not a
|
||||||
plan: the press hall is laid out 60/40 by floor for Duplex systems, since
|
plan: the press hall is laid out for Duplex systems (five Duplex bays and
|
||||||
the plant focuses on special pressings
|
four Classic positions, ~73/27 by floor), since the plant focuses on
|
||||||
([pressing line](equipment/pressing-line.md)). Eight semi-automatic
|
special pressings ([pressing line](equipment/pressing-line.md)). Ten
|
||||||
presses and six Classics give 1,250 to 1,410 records/hour gross, ~3.6 to
|
semi-automatic presses and four Classics give 1,110 to 1,310
|
||||||
4.7 million a year on the same basis, and neither the
|
records/hour gross, ~3.2 to 4.4 million a year on the same basis, and
|
||||||
|
neither the
|
||||||
[revenue model](finance/revenue-model.md) nor the investment includes
|
[revenue model](finance/revenue-model.md) nor the investment includes
|
||||||
them.
|
them.
|
||||||
|
|
||||||
**Specials share 60 % and more (October 2026).** Specials run only on the
|
**Specials share 60 % and more (October 2026).** Specials run only on the
|
||||||
Duplex systems, so at 60 % they set the output wherever the Duplex makes
|
Duplex systems, so at 60 % they set the output wherever the Duplex makes
|
||||||
less than 60 % of the fleet's records: the launch plant drops to ~0.58 to
|
less than 60 % of the fleet's records: the launch plant drops to ~0.58 to
|
||||||
0.90 million (the Classic runs at about two thirds load) and the full
|
0.90 million (the Classic runs at about two thirds load). The
|
||||||
hall to ~2.3 to 3.6 million (the six Classics about half loaded). The
|
|
||||||
five-press fleet is not affected. At the planning rates of the
|
five-press fleet is not affected. At the planning rates of the
|
||||||
[calculator](fleet-calculator.html) (3 a minute per Duplex system) the
|
[calculator](fleet-calculator.html) (3 a minute per Duplex system) the
|
||||||
launch plant stays balanced at ~0.94 million. A hall balanced by output
|
launch plant stays balanced at ~0.94 million. The full hall is laid out
|
||||||
at 60 % specials would give the Duplex systems ~70 to 75 % of the floor
|
for this share: with five Duplex systems and four Classics it makes ~2.9
|
||||||
(estimate), e.g. five Duplex bays and four Classic positions.
|
to 4.4 million records at 60 % specials, the Classics ~80 to 100 %
|
||||||
|
loaded; the 60/40 floor split planned first (four Duplex bays, six
|
||||||
|
Classics) would have made ~2.3 to 3.6 million with the Classics about
|
||||||
|
half loaded (estimates).
|
||||||
|
|
||||||
**The 60–70% effectiveness assumption is worth challenging, but not yet
|
**The 60–70% effectiveness assumption is worth challenging, but not yet
|
||||||
changing.** Newbilt publishes ≥95% yield and ≥95% uptime for the Classic
|
changing.** Newbilt publishes ≥95% yield and ≥95% uptime for the Classic
|
||||||
@@ -269,8 +272,8 @@ kW hydraulic oil cooler) at 305 to 540 l/min of circulating water. The
|
|||||||
peak rows assume all five presses cooling hard on a hot afternoon; the
|
peak rows assume all five presses cooling hard on a hot afternoon; the
|
||||||
Classic counts as one HRP 12 press plus one extruder until Newbilt states
|
Classic counts as one HRP 12 press plus one extruder until Newbilt states
|
||||||
its figures. The presses share one central hydraulic plant and one
|
its figures. The presses share one central hydraulic plant and one
|
||||||
compressed-air plant. The optional full hall (four Duplex systems and six
|
compressed-air plant. The optional full hall (five Duplex systems and
|
||||||
Classics, fourteen presses) would need up to ~1.8 MW of cooling and ~2.1
|
four Classics, fourteen presses) would need up to ~1.8 MW of cooling and ~2.1
|
||||||
to 2.5 t/h of steam: a utility phase of its own.
|
to 2.5 t/h of steam: a utility phase of its own.
|
||||||
|
|
||||||
Tariff: PEA Schedule 3.2.2, Medium General Service on time of use at
|
Tariff: PEA Schedule 3.2.2, Medium General Service on time of use at
|
||||||
|
|||||||
@@ -122,8 +122,8 @@ dropped. Source record with the zone's full rules and annex:
|
|||||||
5. **Plot fit.** Shape and size against the 60 × 25 m building, the
|
5. **Plot fit.** Shape and size against the 60 × 25 m building, the
|
||||||
detached utility yard and the phase 2 footprint (6 to 8 rai). The
|
detached utility yard and the phase 2 footprint (6 to 8 rai). The
|
||||||
Payap scenario model below needs a 150 m square (14.1 rai) as drawn,
|
Payap scenario model below needs a 150 m square (14.1 rai) as drawn,
|
||||||
with a press hall laid out 60/40 for Duplex systems, a colour store and
|
with a press hall laid out for Duplex systems, a colour store and a
|
||||||
a reserve.
|
reserve.
|
||||||
6. **Galvanics on a campus.** Phase 5 electroplating needs the lessor's
|
6. **Galvanics on a campus.** Phase 5 electroplating needs the lessor's
|
||||||
written consent; the zero-discharge design
|
written consent; the zero-discharge design
|
||||||
([sustainability](sustainability.md)) becomes a lease condition, not
|
([sustainability](sustainability.md)) becomes a lease condition, not
|
||||||
@@ -180,12 +180,13 @@ and every equipment envelope is an estimate.
|
|||||||
that special designs need, about 100 positions on four levels
|
that special designs need, about 100 positions on four levels
|
||||||
(estimate), with weighing and mixing and a vacuum conveying station
|
(estimate), with weighing and mixing and a vacuum conveying station
|
||||||
([pressing line](equipment/pressing-line.md)).
|
([pressing line](equipment/pressing-line.md)).
|
||||||
- **Press hall** (~870 m²), laid out 60/40 by floor for Duplex systems
|
- **Press hall** (~870 m²), laid out for Duplex systems because the
|
||||||
because the plant focuses on special pressings (October 2026,
|
plant focuses on special pressings (October 2026, ~73/27 by floor,
|
||||||
[pressing line](equipment/pressing-line.md)): four Duplex bays, each
|
[pressing line](equipment/pressing-line.md)): five Duplex bays, each
|
||||||
for two HRP 12 presses with an EX 50 and an EX 35, along the visitor
|
for two HRP 12 presses with an EX 50 and an EX 35, four of them along
|
||||||
corridor, and six Classic positions in the second row; the launch
|
the visitor corridor and the fifth at the head of the second row,
|
||||||
plant fills one of each. The FreeCAD model still draws the earlier
|
followed by four Classic positions; the launch plant fills one of
|
||||||
|
each. The FreeCAD model still draws the earlier
|
||||||
layout (two Duplex systems, the Classic and ten more Classic
|
layout (two Duplex systems, the Classic and ten more Classic
|
||||||
positions). Each Duplex is one operator's cell of about
|
positions). Each Duplex is one operator's cell of about
|
||||||
5 × 3 m at Newbilt's machine sizes: presses either side turned
|
5 × 3 m at Newbilt's machine sizes: presses either side turned
|
||||||
|
|||||||
Reference in new issue
Block a user