Press hall: five Duplex bays and four Classic positions (balanced at 60 % specials)
Deploy test site / deploy (push) Successful in 44s
Deploy test site / deploy (push) Successful in 44s
User (October 2026): "change the hall layout" after the finding that the 60/40 floor split leaves the Classics about half loaded at 60 %+ specials (specials run only on the Duplex systems). - Press hall now keeps five Duplex bays (four along the visitor corridor, the fifth at the head of the second row) and four Classic positions: 550 + 200 = ~750 m2 of ~870 m2, ~73/27 by floor, 10 to 4 by presses; launch plant fills one of each, growth adds Duplex first. - Full hall: ~2.9 to 4.4M records a year at 60 % specials, Classics ~80 to 100 % loaded (60/40 gave ~2.3 to 3.6M); ~3.2 to 4.4M at ~20 %; fourteen presses as before: ~2.1 to 2.5 t/h steam, up to ~1.8 MW cooling, a utility phase of its own. - pressing-line.md, scale.md, site-candidates.md, crane-workshop-tours.md, roadmap.md, README (FreeCAD model still the earlier layout, not redrawn); calculator preset "Full hall (5 D + 4 C)" and ladder; plant view reserves 5 Duplex bays and 4 Classic positions; business plan draft 0.2 rebuilt. Checks: renderer 720 checks and functional checks pass, calculator regression 0 fails, level checks clean; PDF 47 pages, TOC filled.
This commit is contained in:
1 parent
b3e8e4272b
commit
3f1e4452b8
11 files changed
+69
-66
No files matched your search
@@ -96,30 +96,29 @@ automated candidate). What it means:
|
||||
between machines. The EX 35 and trimmer footprints are not published,
|
||||
so those are estimates. The [Payap scenario model](../site-candidates.md#payap-scenario-model-october-2026) draws
|
||||
both systems this way.
|
||||
- **Room to grow: a hall laid out 60/40 for Duplex systems (October
|
||||
2026).** The plant will mainly press special editions (splatter, colour
|
||||
effects, small runs), not mono colours, so the press hall keeps more
|
||||
floor for Duplex systems than for Classics: 60/40 by floor, four Duplex
|
||||
bays (the launch system and three more) and six Classic positions (the
|
||||
launch Classic and five more). At the calculator's floor figures (110 m²
|
||||
per Duplex bay, 50 m² per Classic) that is 440 + 300 = ~740 m² of the
|
||||
~870 m² hall; the rest stays open for mould carts and staging. Growth
|
||||
adds Duplex systems first. The full hall is eight semi-automatic presses
|
||||
and six Classics, 57/43 by press count; by hourly output the six
|
||||
automatic Classics still press more (~770 against 480 to 640 records an
|
||||
hour, estimate). This is an option, not part of the plan or the
|
||||
investment: the layout keeps the floor, and the central hydraulic and
|
||||
air plant should be sized or extendable for it. At Newbilt's per-press
|
||||
figures, the fourteen presses would draw ~2.1 to 2.5 t/h of steam and up
|
||||
to ~1.8 MW of cooling, so boiler, chiller and grid connection would be a
|
||||
phase of their own ([scale](../scale.md)). The Payap scenario model in
|
||||
- **Room to grow: a hall laid out for Duplex systems (October 2026).**
|
||||
The plant will mainly press special editions (splatter, marble, colour
|
||||
effects), not mono colours: the specials share is planned at 60 % and
|
||||
more ([revenue model](../finance/revenue-model.md)), and specials run
|
||||
only on the Duplex systems. The press hall therefore keeps five Duplex
|
||||
bays (the launch system and four more) and four Classic positions (the
|
||||
launch Classic and three more). At the calculator's floor figures (110
|
||||
m² per Duplex bay, 50 m² per Classic) that is 550 + 200 = ~750 m² of the
|
||||
~870 m² hall, ~73/27 by floor and 10 to 4 by presses; the rest stays
|
||||
open for mould carts and staging. Growth adds Duplex systems first.
|
||||
This split balances the hall by output at 60 % specials: ten
|
||||
semi-automatic presses (600 to 800 records an hour, estimate) carry the
|
||||
specials and the four Classics (~512 an hour) the standard records. A
|
||||
60/40 floor split (four Duplex bays, six Classics), planned first the
|
||||
same month, left the Classics about half loaded at that share. This is
|
||||
an option, not part of the plan or the investment: the layout keeps the
|
||||
floor, and the central hydraulic and air plant should be sized or
|
||||
extendable for it. At Newbilt's per-press figures, the fourteen presses
|
||||
would draw ~2.1 to 2.5 t/h of steam and up to ~1.8 MW of cooling, so
|
||||
boiler, chiller and grid connection would be a phase of their own
|
||||
([scale](../scale.md#production-capacity)). The Payap scenario model in
|
||||
FreeCAD still draws the earlier layout (two Duplex bays and eleven
|
||||
Classic positions). The specials share is planned at 60 % and more
|
||||
([revenue model](../finance/revenue-model.md)); specials run only on the
|
||||
Duplex systems, so at that share the Duplex presses set the output of
|
||||
the launch plant and of the full hall, and a hall balanced by output
|
||||
would give them ~70 to 75 % of the floor (estimate,
|
||||
[scale](../scale.md#production-capacity)).
|
||||
Classic positions).
|
||||
- **Capacity** at maturity stays at ~1.0 to 1.5 million records a year on
|
||||
two shifts, the range the [revenue model](../finance/revenue-model.md)
|
||||
uses: four semi-automatic presses at 60 to 80 records an hour (estimate)
|
||||
@@ -148,7 +147,7 @@ automated candidate). What it means:
|
||||
flyer's Duplex main configuration runs two presses on one extruder); the
|
||||
Classic's price, weight, power, steam and cooling figures; and the
|
||||
central hydraulic supply (an option the flyer offers) for the whole
|
||||
fleet, extendable to the full hall (four Duplex systems, six Classics),
|
||||
fleet, extendable to the full hall (five Duplex systems, four Classics),
|
||||
including whether the Classic
|
||||
can run from it, whether the presses hold their pressure from it over
|
||||
the ring-main lengths of the hall, the filtration and isolation each
|
||||
|
||||