Press hall: five Duplex bays and four Classic positions (balanced at 60 % specials)
Deploy test site / deploy (push) Successful in 44s
Deploy test site / deploy (push) Successful in 44s
User (October 2026): "change the hall layout" after the finding that the 60/40 floor split leaves the Classics about half loaded at 60 %+ specials (specials run only on the Duplex systems). - Press hall now keeps five Duplex bays (four along the visitor corridor, the fifth at the head of the second row) and four Classic positions: 550 + 200 = ~750 m2 of ~870 m2, ~73/27 by floor, 10 to 4 by presses; launch plant fills one of each, growth adds Duplex first. - Full hall: ~2.9 to 4.4M records a year at 60 % specials, Classics ~80 to 100 % loaded (60/40 gave ~2.3 to 3.6M); ~3.2 to 4.4M at ~20 %; fourteen presses as before: ~2.1 to 2.5 t/h steam, up to ~1.8 MW cooling, a utility phase of its own. - pressing-line.md, scale.md, site-candidates.md, crane-workshop-tours.md, roadmap.md, README (FreeCAD model still the earlier layout, not redrawn); calculator preset "Full hall (5 D + 4 C)" and ladder; plant view reserves 5 Duplex bays and 4 Classic positions; business plan draft 0.2 rebuilt. Checks: renderer 720 checks and functional checks pass, calculator regression 0 fails, level checks clean; PDF 47 pages, TOC filled.
This commit is contained in:
1 parent
b3e8e4272b
commit
3f1e4452b8
11 files changed
+69
-66
No files matched your search
@@ -150,8 +150,8 @@ The detail lives in dedicated documents:
|
||||
[isometric](docs/cnx_vinyl_parametric_payap-iso.png)) of the whole plant
|
||||
on a square placeholder plot of Payap land: a 128 x 25 m production-only
|
||||
factory with the five-press fleet, room for ten more Classics (drawn
|
||||
before the October 2026 decision to lay the hall out 60/40 for Duplex
|
||||
systems: four Duplex bays and six Classic positions), one
|
||||
before the October 2026 decision to lay the hall out for Duplex
|
||||
systems: five Duplex bays and four Classic positions), one
|
||||
shared hydraulic and air plant, a colour store with outdoor silos and a
|
||||
two-storey finishing and print block
|
||||
([plans](docs/cnx_vinyl_parametric_payap-block.png)), a separate
|
||||
|
||||
Reference in new issue
Block a user