Add whole-factory HVAC requirement and process traceability spec
- facility-security.md: continuous temperature/humidity/PM control, zoned filtration, burning-season PM2.5 design point, HVAC in PV/battery sizing - traceability.md: end-to-end per-order customer traceability, batch genealogy, log-at-source principles, machine data access as a procurement requirement
This commit is contained in:
1 parent
0a4f47a5cc
commit
0b79c4fb73
5 files changed
+110
-9
No files matched your search
@@ -35,6 +35,10 @@ at 10 bar / 180 °C) and the 250 kW cooling system.
|
||||
abundant fuel), and solar-thermal pre-heating of boiler feedwater. No
|
||||
technology choice has been made yet; it will be driven by honest numbers on
|
||||
load profiles, storage, and grid backup, not by what sounds greenest.
|
||||
- Whole-factory HVAC (continuous temperature, humidity, and PM control, see
|
||||
[facility systems](facility-security.md)) adds a major tropical-climate
|
||||
load on top of process cooling and must be part of the PV and battery
|
||||
sizing.
|
||||
- System sizing (kWp, storage, grid-connection model) is open until the site
|
||||
is chosen.
|
||||
|
||||
|
||||